IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v58y2010i6p1548-1563.html
   My bibliography  Save this article

OR PRACTICE---R&D Project Portfolio Analysis for the Semiconductor Industry

Author

Listed:
  • Banu Gemici-Ozkan

    (Department of Industrial and Systems Engineering, Lehigh University, Bethlehem, Pennsylvania 18015)

  • S. David Wu

    (Department of Industrial and Systems Engineering, Lehigh University, Bethlehem, Pennsylvania 18015)

  • Jeffrey T. Linderoth

    (Department of Industrial and Systems Engineering, University of Wisconsin--Madison, Madison, Wisconsin 53706)

  • Jeffry E. Moore

    (Fairchild Semiconductor, South Portland, Maine 04106)

Abstract

We introduce a decision-support framework for the research and development (R&D) portfolio selection problem faced by a major U.S. semiconductor manufacturer. R&D portfolio selection is of critical importance to high-tech operations such as semiconductors and pharmaceuticals, because it determines the blend of technological development the firm must invest in its R&D resources. This R&D investment leads to differentiating technologies that drive the firm's market position. We developed a general, three-phase decision-support structure for the R&D portfolio selection problem. First is the scenario generation phase , where we transform qualitative assessment and market foresight from senior executives and market analysts into quantitative data. This is combined with the company's financial data (e.g., revenue projections) to generate scenarios of potential project revenue outcomes. This is followed by the optimization phase , where a multistage stochastic program (SP) is solved to maximize expected operating income (OI) subject to risk, product interdependency, capacity, and resource allocation constraints. The optimization procedure generates an efficient frontier of portfolios at different OI (return) and risk levels. The refinement phase offers managerial insights through a variety of analysis tools that utilize the optimization results. For example, the robustness of the optimal portfolio with respect to the risk level, the variability of a portfolio's OI, and the resource level usage as a function of the optimal portfolio can be analyzed and compared to any qualitatively suggested portfolio of projects. The decision-support structure is implemented, tested, and validated with various real-world cases and managerial recommendations. We discuss our implementation experience using a case example, and we explain how the system is incorporated into the corporate R&D investment decisions.

Suggested Citation

  • Banu Gemici-Ozkan & S. David Wu & Jeffrey T. Linderoth & Jeffry E. Moore, 2010. "OR PRACTICE---R&D Project Portfolio Analysis for the Semiconductor Industry," Operations Research, INFORMS, vol. 58(6), pages 1548-1563, December.
  • Handle: RePEc:inm:oropre:v:58:y:2010:i:6:p:1548-1563
    DOI: 10.1287/opre.1100.0832
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.1100.0832
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.1100.0832?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Shalit, Haim & Yitzhaki, Shlomo, 1984. "Mean-Gini, Portfolio Theory, and the Pricing of Risky Assets," Journal of Finance, American Finance Association, vol. 39(5), pages 1449-1468, December.
    2. Christoph H. Loch & Stylianos Kavadias, 2002. "Dynamic Portfolio Selection of NPD Programs Using Marginal Returns," Management Science, INFORMS, vol. 48(10), pages 1227-1241, October.
    3. Jeff Linderoth & Alexander Shapiro & Stephen Wright, 2006. "The empirical behavior of sampling methods for stochastic programming," Annals of Operations Research, Springer, vol. 142(1), pages 215-241, February.
    4. Bekkers, Rudi & Duysters, Geert & Verspagen, Bart, 2002. "Intellectual property rights, strategic technology agreements and market structure: The case of GSM," Research Policy, Elsevier, vol. 31(7), pages 1141-1161, September.
    5. Ringuest, Jeffrey L. & Graves, Samuel B. & Case, Randy H., 2004. "Mean-Gini analysis in R&D portfolio selection," European Journal of Operational Research, Elsevier, vol. 154(1), pages 157-169, April.
    6. Santoso, Tjendera & Ahmed, Shabbir & Goetschalckx, Marc & Shapiro, Alexander, 2005. "A stochastic programming approach for supply chain network design under uncertainty," European Journal of Operational Research, Elsevier, vol. 167(1), pages 96-115, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Faraz Salehi & S. Mohammad J. Mirzapour Al-E-Hashem & S. Mohammad Moattar Husseini & S. Hassan Ghodsypour, 2023. "A bi-level multi-follower optimization model for R&D project portfolio: an application to a pharmaceutical holding company," Annals of Operations Research, Springer, vol. 323(1), pages 331-360, April.
    2. Vijaya Dixit & Manoj Kumar Tiwari, 2020. "Project portfolio selection and scheduling optimization based on risk measure: a conditional value at risk approach," Annals of Operations Research, Springer, vol. 285(1), pages 9-33, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Emelogu, Adindu & Chowdhury, Sudipta & Marufuzzaman, Mohammad & Bian, Linkan & Eksioglu, Burak, 2016. "An enhanced sample average approximation method for stochastic optimization," International Journal of Production Economics, Elsevier, vol. 182(C), pages 230-252.
    2. Fei, Xin & Gülpınar, Nalân & Branke, Jürgen, 2019. "Efficient solution selection for two-stage stochastic programs," European Journal of Operational Research, Elsevier, vol. 277(3), pages 918-929.
    3. Aydin, Nezir & Murat, Alper, 2013. "A swarm intelligence based sample average approximation algorithm for the capacitated reliable facility location problem," International Journal of Production Economics, Elsevier, vol. 145(1), pages 173-183.
    4. Ching-Torng Lin & Yuan-Shan Yang, 2015. "A Linguistic Approach to Measuring the Attractiveness of New Products in Portfolio Selection," Group Decision and Negotiation, Springer, vol. 24(1), pages 145-169, January.
    5. José Claudio Isaias & Pedro Paulo Balestrassi & Guilherme Augusto Barucke Marcondes & Wesley Vieira da Silva & Carlos Henrique Pereira Mello & Claudimar Pereira da Veiga, 2021. "Project Portfolio Selection of Solar Energy by Photovoltaic Generation Using Gini-CAPM Multi-Criteria and Considering ROI Covariations," Energies, MDPI, vol. 14(24), pages 1-21, December.
    6. Ran Ji & Miguel A. Lejeune & Srinivas Y. Prasad, 2017. "Properties, formulations, and algorithms for portfolio optimization using Mean-Gini criteria," Annals of Operations Research, Springer, vol. 248(1), pages 305-343, January.
    7. Rebecca Stockbridge & Güzin Bayraksan, 2016. "Variance reduction in Monte Carlo sampling-based optimality gap estimators for two-stage stochastic linear programming," Computational Optimization and Applications, Springer, vol. 64(2), pages 407-431, June.
    8. Walter Rei & Michel Gendreau & Patrick Soriano, 2010. "A Hybrid Monte Carlo Local Branching Algorithm for the Single Vehicle Routing Problem with Stochastic Demands," Transportation Science, INFORMS, vol. 44(1), pages 136-146, February.
    9. Fengqi You & Ignacio Grossmann, 2013. "Multicut Benders decomposition algorithm for process supply chain planning under uncertainty," Annals of Operations Research, Springer, vol. 210(1), pages 191-211, November.
    10. Lin, Cheng-Chang & Wu, Yi-Chen, 2013. "Optimal pricing for build-to-order supply chain design under price-dependent stochastic demand," Transportation Research Part B: Methodological, Elsevier, vol. 56(C), pages 31-49.
    11. M. Jenabi & S. M. T. Fatemi Ghomi & S. A. Torabi & Moeen Sammak Jalali, 2022. "An accelerated Benders decomposition algorithm for stochastic power system expansion planning using sample average approximation," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1304-1336, December.
    12. Ahumada, Omar & Rene Villalobos, J. & Nicholas Mason, A., 2012. "Tactical planning of the production and distribution of fresh agricultural products under uncertainty," Agricultural Systems, Elsevier, vol. 112(C), pages 17-26.
    13. Michael Freimer & Jeffrey Linderoth & Douglas Thomas, 2012. "The impact of sampling methods on bias and variance in stochastic linear programs," Computational Optimization and Applications, Springer, vol. 51(1), pages 51-75, January.
    14. Fan, Lei & Wilson, William W. & Dahl, Bruce, 2015. "Risk analysis in port competition for containerized imports," European Journal of Operational Research, Elsevier, vol. 245(3), pages 743-753.
    15. Darren Butterworth & Phil Holmes, 2005. "The Hedging Effectiveness of U.K. Stock Index Futures Contracts Using an Extended Mean Gini Approach: Evidence for the FTSE 100 and FTSE Mid250 Contracts," Multinational Finance Journal, Multinational Finance Journal, vol. 9(3-4), pages 131-160, September.
    16. Lauren Xiaoyuan Lu & Jan A. Van Mieghem, 2009. "Multimarket Facility Network Design with Offshoring Applications," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 90-108, October.
    17. Slowak, André P., 2009. "Market fields structure & dynamics in industrial automation," FZID Discussion Papers 02-2009, University of Hohenheim, Center for Research on Innovation and Services (FZID).
    18. Madadi, AliReza & Kurz, Mary E. & Mason, Scott J. & Taaffe, Kevin M., 2014. "Supply chain design under quality disruptions and tainted materials delivery," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 67(C), pages 105-123.
    19. Zéphyr, Luckny & Lang, Pascal & Lamond, Bernard F. & Côté, Pascal, 2017. "Approximate stochastic dynamic programming for hydroelectric production planning," European Journal of Operational Research, Elsevier, vol. 262(2), pages 586-601.
    20. Alexandre Forel & Martin Grunow, 2023. "Dynamic stochastic lot sizing with forecast evolution in rolling‐horizon planning," Production and Operations Management, Production and Operations Management Society, vol. 32(2), pages 449-468, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:58:y:2010:i:6:p:1548-1563. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.