Significant Factors Causing Delay in the Cambodian Construction Industry
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Abdullah Rasheed Alhajri & Adel Alshibani, 2018. "Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia," Energies, MDPI, vol. 11(7), pages 1-18, June.
- Martine Selm & Nicholas Jankowski, 2006. "Conducting Online Surveys," Quality & Quantity: International Journal of Methodology, Springer, vol. 40(3), pages 435-456, June.
- Arshi Shakeel Faridi & Sameh Monir El-Sayegh, 2006. "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 24(11), pages 1167-1176.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Peipei Wang & Yunhan Huang & Jianguo Zhu & Ming Shan, 2022. "Construction Dispute Potentials: Mechanism versus Empiricism in Artificial Neural Networks," Sustainability, MDPI, vol. 14(22), pages 1-23, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2019. "Materials Challenges in Reconstruction of Historical Projects: A Case Study of the Old Riwaq Project," Sustainability, MDPI, vol. 11(17), pages 1-19, August.
- Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
- Murat Gunduz & Abdulrahman Abu-Hijleh, 2020. "Assessment of Human Productivity Drivers for Construction Labor through Importance Rating and Risk Mapping," Sustainability, MDPI, vol. 12(20), pages 1-18, October.
- Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
- Morenike Oluwatoyin Folayan & Roberto Ariel Abeldaño Zuniga & Oliver C. Ezechi & Brandon Brown & Annie L. Nguyen & Nourhan M. Aly & Passent Ellakany & Ifeoma E. Idigbe & Abeedha Tu-Allah Khan & Folake, 2022. "Associations between Emotional Distress, Sleep Changes, Decreased Tooth Brushing Frequency, Self-Reported Oral Ulcers and SARS-Cov-2 Infection during the First Wave of the COVID-19 Pandemic: A Global ," IJERPH, MDPI, vol. 19(18), pages 1-11, September.
- Shannon Davis & Andrey Shevchuk & Denis Strebkov, 2014. "Pathways to Satisfaction with Work-Life Balance: The Case of Russian-Language Internet Freelancers," Journal of Family and Economic Issues, Springer, vol. 35(4), pages 542-556, December.
- Vicente Gea-Caballero & José Ramón Martínez-Riera & Pedro García-Martínez & Jorge Casaña-Mohedo & Isabel Antón-Solanas & María Virtudes Verdeguer-Gómez & Iván Santolaya-Arnedo & Raúl Juárez-Vela, 2021. "Study of the Strengths and Weaknesses of Nursing Work Environments in Primary Care in Spain," IJERPH, MDPI, vol. 18(2), pages 1-12, January.
- Vendrell-Herrero, Ferran & Bustinza, Oscar F. & Opazo-Basaez, Marco, 2021. "Information technologies and product-service innovation: The moderating role of service R&D team structure," Journal of Business Research, Elsevier, vol. 128(C), pages 673-687.
- Rolf Becker, 2023. "Short- and long-term effects of reminders on panellists’ survey participation in a probability-based panel study with a sequential mixed-mode design," Quality & Quantity: International Journal of Methodology, Springer, vol. 57(5), pages 4095-4119, October.
- R. Jayaraman, 2021. "An Empirical Study of Delays in Large Engineering Projects: An Indian Experience," Jindal Journal of Business Research, , vol. 10(1), pages 49-76, June.
- Yazan Issa Abu Aisheh, 2021. "Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study," Sustainability, MDPI, vol. 13(19), pages 1-17, September.
- Andrea Serge & Johana Quiroz Montoya & Francisco Alonso & Luis Montoro, 2021. "Socioeconomic Status, Health and Lifestyle Settings as Psychosocial Risk Factors for Road Crashes in Young People: Assessing the Colombian Case," IJERPH, MDPI, vol. 18(3), pages 1-22, January.
- Achintya Ghatak & Adarsh Garg, 2022. "Power transmission project: a framework to align project success with organization goal," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(4), pages 1817-1833, August.
- Camilleri, Silvio John & Cortis, Justine & Fenech, Maria Diandra, 2013. "Service Quality and Internet Banking: Perceptions of Maltese Retail Bank Customers," MPRA Paper 62492, University Library of Munich, Germany.
- Troise, Ciro & Corvello, Vincenzo & Ghobadian, Abby & O'Regan, Nicholas, 2022. "How can SMEs successfully navigate VUCA environment: The role of agility in the digital transformation era," Technological Forecasting and Social Change, Elsevier, vol. 174(C).
- Ahmed Hassan Abdou & Majed Abdulaziz Al Abdulathim & Nadia Rebhi Hussni Hasan & Maha Hassan Ahmed Salah & Howayda Said Ahmed Mohamed Ali & Nancy J. Kamel, 2023. "From Green Inclusive Leadership to Green Organizational Citizenship: Exploring the Mediating Role of Green Work Engagement and Green Organizational Identification in the Hotel Industry Context," Sustainability, MDPI, vol. 15(20), pages 1-22, October.
- Christopher Benjamin Menadue & Susan Jacups, 2018. "Who Reads Science Fiction and Fantasy, and How Do They Feel About Science? Preliminary Findings From an Online Survey," SAGE Open, , vol. 8(2), pages 21582440187, June.
- Antonio Héctor Álvarez-Pozo & Miguel Ignacio Parma-García & Isabel Ortiz-Marcos & Luis Fernando Bautista & Evangelina Atanes-Sánchez, 2024. "Analysis of Causes of Delays and Cost Overruns as Well as Mitigation Measures to Improve Profitability and Sustainability in Turnkey Industrial Projects," Sustainability, MDPI, vol. 16(4), pages 1-16, February.
- Konstantinos Nikolaos Vasileiadis & Konstantinos Alexandros Tsioumis & Argyris Kyridis, 2013. "The Effects of Dominant Ideology on Teachers¡¯ Perceptions and Practices towards the ¡°Other¡±," International Journal of Learning and Development, Macrothink Institute, vol. 3(1), pages 33-48, December.
- Beaton, Anthony A. & Funk, Daniel C. & Ridinger, Lynn & Jordan, Jeremy, 2011. "Sport involvement: A conceptual and empirical analysis," Sport Management Review, Elsevier, vol. 14(2), pages 126-140, May.
More about this item
Keywords
time overrun; delay factors; Cambodia; construction projects; relative importance index;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:6:p:3521-:d:773086. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.