Construction Dispute Potentials: Mechanism versus Empiricism in Artificial Neural Networks
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Thaveeporn Pulket & David Arditi, 2009. "Construction litigation prediction system using ant colony optimization," Construction Management and Economics, Taylor & Francis Journals, vol. 27(3), pages 241-251.
- Riaz Ahmed & Noor Mohamad & Muhammad Ahmad, 2016. "Effect of multidimensional top management support on project success: an empirical investigation," Quality & Quantity: International Journal of Methodology, Springer, vol. 50(1), pages 151-176, January.
- Michael Behm & Arthur Schneller, 2013. "Application of the Loughborough Construction Accident Causation model: a framework for organizational learning," Construction Management and Economics, Taylor & Francis Journals, vol. 31(6), pages 580-595, June.
- Usman Ismaila & Wooyong Jung & Chan Young Park, 2022. "Delay Causes and Types in Nigerian Power Construction Projects," Energies, MDPI, vol. 15(3), pages 1-16, January.
- Faham Tahmasebinia & Vicheth Song, 2022. "Significant Factors Causing Delay in the Cambodian Construction Industry," Sustainability, MDPI, vol. 14(6), pages 1-24, March.
- Elikplim Afelete & Wooyong Jung, 2021. "Causes of Design Change Depending on Power Project-Types in Ghana," Energies, MDPI, vol. 14(21), pages 1-18, October.
- Bauma Frigeant Bitamba & Sung-Hoon An, 2020. "Construction Project Change Management in the Democratic Republic of the Congo: Status, Causes, and Impacts," Sustainability, MDPI, vol. 12(22), pages 1-15, November.
- Marion M. Russell & Min Liu & Simon M. Hsiang, 2015. "Planning for uncertainty: use of structural equation modelling to determine the causal structure of time buffer allocation," Construction Management and Economics, Taylor & Francis Journals, vol. 33(10), pages 783-798, October.
- Ismail Abdul Rahman & Abdulla Eisaa Saleh Al Ameri & Aftab Hameed Memon & Nashwan Al-Emad & Ahmed S. A. Marey Alhammadi, 2022. "Structural Relationship of Causes and Effects of Construction Changes: Case of UAE Construction," Sustainability, MDPI, vol. 14(2), pages 1-14, January.
- Ramin Ansari & Mohammad Khalilzadeh & Roohollah Taherkhani & Jurgita Antucheviciene & Darius Migilinskas & Shohreh Moradi, 2022. "Performance Prediction of Construction Projects Based on the Causes of Claims: A System Dynamics Approach," Sustainability, MDPI, vol. 14(7), pages 1-19, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Maryam Hussain Abal-Seqan & Shaligram Pokharel & Khalid Kamal Naji, 2023. "Key Success Factors and Their Impact on the Performance of Construction Projects: Case in Qatar," Sustainability, MDPI, vol. 15(4), pages 1-20, February.
- Muhammad Zeeshan Fareed & Qin Su, 2022. "Project Governance and Project Performance: The Moderating Role of Top Management Support," Sustainability, MDPI, vol. 14(5), pages 1-13, February.
- Yikun Su & Shijing Yang & Kangning Liu & Kaicheng Hua & Qi Yao, 2019. "Developing A Case-Based Reasoning Model for Safety Accident Pre-Control and Decision Making in the Construction Industry," IJERPH, MDPI, vol. 16(9), pages 1-20, April.
- Mudassar Ali & Li Zhang & Zhenduo Zhang & Muhammad Zada & Abida Begum & Heesup Han & Antonio Ariza-Montes & Alejandro Vega-Muñoz, 2021. "Can Leaders’ Humility Enhance Project Management Effectiveness? Interactive Effect of Top Management Support," Sustainability, MDPI, vol. 13(17), pages 1-17, August.
- Albert P. C. Chan & Yang Yang & Tracy N. Y. Choi & Janet Mayowa Nwaogu, 2022. "Characteristics and Causes of Construction Accidents in a Large-Scale Development Project," Sustainability, MDPI, vol. 14(8), pages 1-25, April.
- Pouya Gholizadeh & Behzad Esmaeili, 2020. "Developing a Multi-variate Logistic Regression Model to Analyze Accident Scenarios: Case of Electrical Contractors," IJERPH, MDPI, vol. 17(13), pages 1-24, July.
- Cetinkaya, Ali Sukru & Rashid, Muhammad, 2018. "The Effect of Social Media on Employees’ Job Performance: The mediating Role of Organizational Structure," MPRA Paper 91354, University Library of Munich, Germany, revised 15 Oct 2018.
- Muhammad Zeeshan Fareed & Qin Su & Najam Abbas Naqvi & Rida Batool & Muhammad Umer Aslam, 2023. "Transformational Leadership and Project Success: The Moderating Effect of Top Management Support," SAGE Open, , vol. 13(3), pages 21582440231, August.
- Nuria Gamero & Inmaculada Silla & Rubén Sainz-González & Beatriz Sora, 2018. "The Influence of Organizational Factors on Road Transport Safety," IJERPH, MDPI, vol. 15(9), pages 1-8, September.
- Noori Adel, 2023. "Assessment of interorganisational conflict in building refurbishment projects using EFA and PLS-SEM," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 178-191, January.
- Dimitrios Dimitriou & Konstantinos Papakostas, 2022. "Review of Management Comprehensiveness on Occupational Health and Safety for PPP Transportation Projects," Sustainability, MDPI, vol. 14(10), pages 1-22, May.
- Olakunle Jayeola & Shafie Sidek & Zulkiflee Abdul-Samad & Nornajihah Nadia Hasbullah & Saiful Anwar & Nguyen Binh An & Vu Thi Nga & Omar Al-Kasasbeh & Samrat Ray, 2022. "The Mediating and Moderating Effects of Top Management Support on the Cloud ERP Implementation–Financial Performance Relationship," Sustainability, MDPI, vol. 14(9), pages 1-17, May.
More about this item
Keywords
construction disputes; neural networks; mechanical mode; empirical model;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:22:p:15239-:d:975176. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.