IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v85y2003i2p233-249.html
   My bibliography  Save this article

Production planning and order acceptance in business to business electronic commerce

Author

Listed:
  • Calosso, T.
  • Cantamessa, M.
  • Vu, Dang
  • Villa, A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Calosso, T. & Cantamessa, M. & Vu, Dang & Villa, A., 2003. "Production planning and order acceptance in business to business electronic commerce," International Journal of Production Economics, Elsevier, vol. 85(2), pages 233-249, August.
  • Handle: RePEc:eee:proeco:v:85:y:2003:i:2:p:233-249
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00112-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. ten Kate, Hans A., 1994. "Towards a better understanding of order acceptance," International Journal of Production Economics, Elsevier, vol. 37(1), pages 139-152, November.
    2. Clyde W. Holsapple & Hsiangchu Lai & Andrew B. Whinston, 1998. "A Formal Basis for Negotiation Support System Research," Group Decision and Negotiation, Springer, vol. 7(3), pages 203-227, May.
    3. Hendry, L. C. & Kingsman, B. G., 1989. "Production planning systems and their applicability to make-to-order companies," European Journal of Operational Research, Elsevier, vol. 40(1), pages 1-15, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alarcón, F. & Alemany, M.M.E. & Ortiz, A., 2009. "Conceptual framework for the characterization of the order promising process in a collaborative selling network context," International Journal of Production Economics, Elsevier, vol. 120(1), pages 100-114, July.
    2. Hausen, Tobias & Fritz, Melanie & Schiefer, Gerhard, 2006. "Potential of electronic trading in complex supply chains: An experimental study," International Journal of Production Economics, Elsevier, vol. 104(2), pages 580-597, December.
    3. Ebadian, M. & Rabbani, M. & Jolai, F. & Torabi, S.A. & Tavakkoli-Moghaddam, R., 2008. "A new decision-making structure for the order entry stage in make-to-order environments," International Journal of Production Economics, Elsevier, vol. 111(2), pages 351-367, February.
    4. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    5. M. Rosário Moreira & Rui Alves, 2006. "Does Order Negotiation Improve The Job-Shop Workload Control?," FEP Working Papers 213, Universidade do Porto, Faculdade de Economia do Porto.
    6. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    7. Lin, Hung-Tso & Chang, Wen-Ling, 2008. "Order selection and pricing methods using flexible quantity and fuzzy approach for buyer evaluation," European Journal of Operational Research, Elsevier, vol. 187(2), pages 415-428, June.
    8. Merzifonluoglu, Yasemin & Geunes, Joseph, 2006. "Uncapacitated production and location planning models with demand fulfillment flexibility," International Journal of Production Economics, Elsevier, vol. 102(2), pages 199-216, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
    2. Broersma, Andreas L. A. & Sierksma, Gerard & Wijngaard, Jacob, 2002. "Decomposed vs integrated control of a one-stage production system," European Journal of Operational Research, Elsevier, vol. 138(3), pages 569-577, May.
    3. Carravilla, Maria Antonia & de Sousa, Jorge Pinho, 1995. "Hierarchical production planning in a make-to-order company: A case study," European Journal of Operational Research, Elsevier, vol. 86(1), pages 43-56, October.
    4. Stevenson, Mark & Hendry, Linda C., 2006. "Aggregate load-oriented workload control: A review and a re-classification of a key approach," International Journal of Production Economics, Elsevier, vol. 104(2), pages 676-693, December.
    5. Dellaert, N. P. & Melo, M. T., 1996. "Production strategies for a stochastic lot-sizing problem with constant capacity," European Journal of Operational Research, Elsevier, vol. 92(2), pages 281-301, July.
    6. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    7. Weckenborg, Christian & Schumacher, Patrick & Thies, Christian & Spengler, Thomas S., 2024. "Flexibility in manufacturing system design: A review of recent approaches from Operations Research," European Journal of Operational Research, Elsevier, vol. 315(2), pages 413-441.
    8. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    9. Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
    10. Haskose, A. & Kingsman, B. G. & Worthington, D, 2004. "Performance analysis of make-to-order manufacturing systems under different workload control regimes," International Journal of Production Economics, Elsevier, vol. 90(2), pages 169-186, July.
    11. Surbhi Upadhyay & Suresh Kumar Garg & Rishu Sharma, 2023. "Analyzing the Factors for Implementing Make-to-Order Manufacturing System," Sustainability, MDPI, vol. 15(13), pages 1-22, June.
    12. Weng, Z. Kevin, 1996. "Manufacturing lead times, system utilization rates and lead-time-related demand," European Journal of Operational Research, Elsevier, vol. 89(2), pages 259-268, March.
    13. Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
    14. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2004. "Exploring applicability of the workload control concept," International Journal of Production Economics, Elsevier, vol. 90(2), pages 187-198, July.
    15. Sridharan, Sri V., 1998. "Managing capacity in tightly constrained systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 601-610, September.
    16. Broersma, A.L.A. & Sierksma, G. & Wijngaard, J., 1999. "Decomposed versus integrated control of a one-stage production system," Research Report 99A18, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    17. Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
    18. Hendry, L. & Land, M. & Stevenson, M. & Gaalman, G., 2008. "Investigating implementation issues for workload control (WLC): A comparative case study analysis," International Journal of Production Economics, Elsevier, vol. 112(1), pages 452-469, March.
    19. Dellaert, N. P. & Melo, M. T., 1998. "Make-to-order policies for a stochastic lot-sizing problem using overtime," International Journal of Production Economics, Elsevier, vol. 56(1), pages 79-97, September.
    20. repec:dgr:rugsom:95a42 is not listed on IDEAS
    21. Sitoh, P. J. & Braiden, P. M. & Simmons, J. E. L., 1998. "The development of a method for determining the efficiency and effectiveness of installed CAPM systems," International Journal of Production Economics, Elsevier, vol. 56(1), pages 587-599, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:85:y:2003:i:2:p:233-249. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.