IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v54y1998i1p101-109.html
   My bibliography  Save this article

JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs

Author

Listed:
  • Fazel, Farzaneh
  • Fischer, Klaus P.
  • Gilbert, Erika W.

Abstract

No abstract is available for this item.

Suggested Citation

  • Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
  • Handle: RePEc:eee:proeco:v:54:y:1998:i:1:p:101-109
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(97)00130-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    2. Jamal, A. M. M. & Sarker, Bhaba R., 1993. "An optimal batch size for a production system operating under a just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 32(2), pages 255-260, September.
    3. Chyr, Fuchiao & Lin, Tsong Ming & Ho, Chin-Fu, 1990. "Comparison between just-in-time and EOQ system," Engineering Costs and Production Economics, Elsevier, vol. 18(3), pages 233-240, January.
    4. Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
    5. Zhuang, Li, 1994. "Towards a more economic production and just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 36(3), pages 307-313, October.
    6. Chhikara, Jitendra & Weiss, Elliott N., 1995. "JIT savings--myth or reality?," Business Horizons, Elsevier, vol. 38(3), pages 73-78.
    7. Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P., 1993. "Modelling and analysis of just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 32(1), pages 23-37, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. San-José, Luis A. & García-Laguna, Juan, 2009. "Optimal policy for an inventory system with backlogging and all-units discounts: Application to the composite lot size model," European Journal of Operational Research, Elsevier, vol. 192(3), pages 808-823, February.
    2. Swenseth, Scott R. & Godfrey, Michael R., 2002. "Incorporating transportation costs into inventory replenishment decisions," International Journal of Production Economics, Elsevier, vol. 77(2), pages 113-130, May.
    3. Han, Xiaoya & Yu, Yugang & Hu, Guiping, 2019. "A dynamic newsvendor problem with goodwill-dependent demands and minimum commitment," Omega, Elsevier, vol. 89(C), pages 242-256.
    4. Cao, Qing & Schniederjans, Marc J., 2004. "A revised EMQ/JIT production-run model: An examination of inventory and production costs," International Journal of Production Economics, Elsevier, vol. 87(1), pages 83-95, January.
    5. Schniederjans, Marc J. & Cao, Qing, 2000. "A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs," International Journal of Production Economics, Elsevier, vol. 65(3), pages 289-294, May.
    6. Zheng Shi & Zheng Wen, 2014. "Optimal Sales Discount Decision Model with Fixed Ordered Quantities," Journal of Systems Science and Information, De Gruyter, vol. 2(4), pages 345-357, August.
    7. L. San José & J. García-Laguna, 2003. "An EOQ model with backorders and all-units discounts," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 11(2), pages 253-274, December.
    8. Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.
    9. Tsai, Jung-Fa, 2007. "An optimization approach for supply chain management models with quantity discount policy," European Journal of Operational Research, Elsevier, vol. 177(2), pages 982-994, March.
    10. Wu, Min & Shen, Qiping & Xu, Maozeng & Wu, Desheng, 2013. "Modeling stockout risk and JIT purchasing in ready-mixed concrete batching plants," International Journal of Production Economics, Elsevier, vol. 144(1), pages 14-19.
    11. Chung, Wenming & Talluri, Srinivas & Narasimhan, Ram, 2011. "Price markdown scheme in a multi-echelon supply chain in a high-tech industry," European Journal of Operational Research, Elsevier, vol. 215(3), pages 581-589, December.
    12. Min, Wu & Sui Pheng, Low, 2006. "EOQ, JIT and fixed costs in the ready-mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 102(1), pages 167-180, July.
    13. Ben Jouida, Sihem & Krichen, Saoussen & Klibi, Walid, 2017. "Coalition-formation problem for sourcing contract design in supply networks," European Journal of Operational Research, Elsevier, vol. 257(2), pages 539-558.
    14. Low Sui Pheng & Wu Min, 2005. "Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore," Construction Management and Economics, Taylor & Francis Journals, vol. 23(8), pages 815-829.
    15. Wu Min & Low Sui Pheng, 2005. "Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry," Construction Management and Economics, Taylor & Francis Journals, vol. 23(4), pages 409-422.
    16. Hemant K. Bhargava & Daewon Sun & Susan H. Xu, 2006. "Stockout Compensation: Joint Inventory and Price Optimization in Electronic Retailing," INFORMS Journal on Computing, INFORMS, vol. 18(2), pages 255-266, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.
    2. Min, Wu & Sui Pheng, Low, 2006. "EOQ, JIT and fixed costs in the ready-mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 102(1), pages 167-180, July.
    3. Z X Chen & B R Sarker, 2010. "Multi-vendor integrated procurement-production system under shared transportation and just-in-time delivery system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(11), pages 1654-1666, November.
    4. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    5. Valentini, Giovanni & Zavanella, Lucio, 2003. "The consignment stock of inventories: industrial case and performance analysis," International Journal of Production Economics, Elsevier, vol. 81(1), pages 215-224, January.
    6. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
    7. Padilla Tinoco, Silvia Valeria & Creemers, Stefan & Boute, Robert N., 2017. "Collaborative shipping under different cost-sharing agreements," European Journal of Operational Research, Elsevier, vol. 263(3), pages 827-837.
    8. Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
    9. Weng, Z. Kevin, 2004. "Coordinating order quantities between the manufacturer and the buyer: A generalized newsvendor model," European Journal of Operational Research, Elsevier, vol. 156(1), pages 148-161, July.
    10. Hauck, Zsuzsanna & Rabta, Boualem & Reiner, Gerald, 2023. "Coordinating quality decisions in a two-stage supply chain under buyer dominance," International Journal of Production Economics, Elsevier, vol. 264(C).
    11. Maria Rosário Moreira & Rui Alves, 2006. "How far from Just-in-time are Portuguese firms? A survey of its progress and perception," FEP Working Papers 215, Universidade do Porto, Faculdade de Economia do Porto.
    12. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    13. Kevin Weng, Z., 1995. "Modeling quantity discounts under general price-sensitive demand functions: Optimal policies and relationships," European Journal of Operational Research, Elsevier, vol. 86(2), pages 300-314, October.
    14. Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
    15. Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
    16. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    17. Chan, Chi Kin & Lee, Y.C.E. & Campbell, J.F., 2013. "Environmental performance—Impacts of vendor–buyer coordination," International Journal of Production Economics, Elsevier, vol. 145(2), pages 683-695.
    18. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    19. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    20. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:54:y:1998:i:1:p:101-109. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.