IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v100y1997i3p537-549.html
   My bibliography  Save this article

Dynamic lot-sizing with setup cost reduction

Author

Listed:
  • Denizel, Meltem
  • Erenguc, Selcuk
  • Benson, Harold P.

Abstract

No abstract is available for this item.

Suggested Citation

  • Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
  • Handle: RePEc:eee:ejores:v:100:y:1997:i:3:p:537-549
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(95)00327-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Willard I. Zangwill, 1987. "Eliminating Inventory in a Series Facility Production System," Management Science, INFORMS, vol. 33(9), pages 1150-1164, September.
    2. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    3. Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
    4. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    5. B. Martos, 1965. "The Direct Power of Adjacent Vertex Programming Methods," Management Science, INFORMS, vol. 12(3), pages 241-252, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bernstein, Fernando & Gürhan Kök, A. & Meca, Ana, 2015. "Cooperation in assembly systems: The role of knowledge sharing networks," European Journal of Operational Research, Elsevier, vol. 240(1), pages 160-171.
    2. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    3. Biswajit Sarkar & Sharmila Saren & Mitali Sarkar & Yong Won Seo, 2016. "A Stackelberg Game Approach in an Integrated Inventory Model with Carbon-Emission and Setup Cost Reduction," Sustainability, MDPI, vol. 8(12), pages 1-23, December.
    4. Umakanta Mishra & Jei-Zheng Wu & Anthony Shun Fung Chiu, 2019. "Effects of Carbon-Emission and Setup Cost Reduction in a Sustainable Electrical Energy Supply Chain Inventory System," Energies, MDPI, vol. 12(7), pages 1-18, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hoesel, C. P. M. Van & Wagelmans, A. P. M., 2000. "Parametric analysis of setup cost in the economic lot-sizing model without speculative motives," International Journal of Production Economics, Elsevier, vol. 66(1), pages 13-22, June.
    2. Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
    3. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
    4. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    5. Williams, William W. & Tang, Kwei & Gong, Linguo, 2000. "Process improvement for a container-filling process with random shifts," International Journal of Production Economics, Elsevier, vol. 66(1), pages 23-31, June.
    6. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
    7. Matsuyama, Keisuke, 1995. "Inventory policy with time-dependent setup cost," International Journal of Production Economics, Elsevier, vol. 42(2), pages 149-160, December.
    8. Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
    9. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
    10. Peter McKenzie & Shekhar Jayanthi, 2007. "Ball Aerospace Explores Operational and Financial Trade-Offs in Batch Sizing in Implementing JIT," Interfaces, INFORMS, vol. 37(2), pages 108-119, April.
    11. Leung, Kit-Nam Francis, 2007. "A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations"," European Journal of Operational Research, Elsevier, vol. 176(1), pages 240-251, January.
    12. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    13. Suresh Chand & Sunantha Teyarachakul Prime & Suresh Sethi, 2018. "Production planning with multiple production lines: Forward algorithm and insights on process design for volume flexibility," Naval Research Logistics (NRL), John Wiley & Sons, vol. 65(6-7), pages 535-549, September.
    14. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    15. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    16. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
    17. Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
    18. Bajwa, Naeem & Sox, Charles R. & Ishfaq, Rafay, 2016. "Coordinating pricing and production decisions for multiple products," Omega, Elsevier, vol. 64(C), pages 86-101.
    19. Battini, Daria & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A sustainable EOQ model: Theoretical formulation and applications," International Journal of Production Economics, Elsevier, vol. 149(C), pages 145-153.
    20. Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:100:y:1997:i:3:p:537-549. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.