A revised EMQ/JIT production-run model: An examination of inventory and production costs
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P., 1993. "Determining economic inventory policies in a multi-stage just-in-time production system," International Journal of Production Economics, Elsevier, vol. 30(1), pages 531-542, July.
- Wolsey, L. A., 1995. "Progress with single-item lot-sizing," LIDAM Reprints CORE 1174, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Corbey, Michael & Jansen, Rutger, 1993. "The economic lot size and relevant costs," International Journal of Production Economics, Elsevier, vol. 30(1), pages 519-530, July.
- Richard J. Schonberger & Marc J. Schniederjans, 1984. "Reinventing Inventory Control," Interfaces, INFORMS, vol. 14(3), pages 76-83, June.
- Jamal, A. M. M. & Sarker, Bhaba R., 1993. "An optimal batch size for a production system operating under a just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 32(2), pages 255-260, September.
- Wolsey, Laurence A., 1995. "Progress with single-item lot-sizing," European Journal of Operational Research, Elsevier, vol. 86(3), pages 395-401, November.
- Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Mitali Sarkar & Sungjun Kim & Jihed Jemai & Baishakhi Ganguly & Biswajit Sarkar, 2019. "An Application of Time-Dependent Holding Costs and System Reliability in a Multi-Item Sustainable Economic Energy Efficient Reliable Manufacturing System," Energies, MDPI, vol. 12(15), pages 1-19, July.
- Kelle, Peter & Miller, Pamela A. & Akbulut, Asli Y., 2007. "Coordinating ordering/shipment policy for buyer and supplier: Numerical and empirical analysis of influencing factors," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 100-110, July.
- de Vries, Jan, 2007. "Diagnosing inventory management systems: An empirical evaluation of a conceptual approach," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 63-73, July.
- Min, Wu & Sui Pheng, Low, 2007. "Modeling just-in-time purchasing in the ready mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 107(1), pages 190-201, May.
- Zhang, Nan & Cai, Kaiquan & Deng, Yingjun & Zhang, Jun, 2023. "Determining the optimal production–maintenance policy of a parallel production system with stochastically interacted yield and deterioration," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
- BilgehanYıldız & Murat Ustaoğlu, 2014. "Optimal Production Model for EVs Manufacturing Process in Turkey: A Comparable Case of EMQ/JIT Production Models for EVs’ Battery Production," International Journal of Management Sciences, Research Academy of Social Sciences, vol. 3(12), pages 856-863.
- Ziyang Li & Qianwei Ying & Wu Yan & Chenjun Fan, 2022. "Does just‐in‐time adoption have an impact on corporate innovation: evidence from China," Accounting and Finance, Accounting and Finance Association of Australia and New Zealand, vol. 62(S1), pages 1599-1635, April.
- Min, Wu & Sui Pheng, Low, 2006. "EOQ, JIT and fixed costs in the ready-mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 102(1), pages 167-180, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Nascimento, Mariá C.V. & Resende, Mauricio G.C. & Toledo, Franklina M.B., 2010. "GRASP heuristic with path-relinking for the multi-plant capacitated lot sizing problem," European Journal of Operational Research, Elsevier, vol. 200(3), pages 747-754, February.
- Martel, Alain & Gascon, Andre, 1998. "Dynamic lot-sizing with price changes and price-dependent holding costs," European Journal of Operational Research, Elsevier, vol. 111(1), pages 114-128, November.
- Helber, Stefan & Sahling, Florian, 2010.
"A fix-and-optimize approach for the multi-level capacitated lot sizing problem,"
International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
- Helber, Stefan & Sahling, Florian, 2008. "A Fix-and-Optimize Approach for the Multi-Level Capacitated Lot Sizing Problems," Hannover Economic Papers (HEP) dp-393, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- LAMAS, ALEJANDRO & CHEVALIER, Philippe, 2013. "Jumping the hurdles for collaboration: fairness in operations pooling in the absence of transfer payments," LIDAM Discussion Papers CORE 2013073, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Okhrin, Irena & Richter, Knut, 2011. "The linear dynamic lot size problem with minimum order quantity," International Journal of Production Economics, Elsevier, vol. 133(2), pages 688-693, October.
- Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Lamas, Alejandro & Chevalier, Philippe, 2018.
"Joint dynamic pricing and lot-sizing under competition,"
European Journal of Operational Research, Elsevier, vol. 266(3), pages 864-876.
- LAMAS Alejandro & CHEVALIER Philippe, 2017. "Joint dynamic pricing and lot-sizing under competition," LIDAM Discussion Papers CORE 2017023, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Alejandro Lamas & Philippe Chevalier, 2018. "Joint dynamic pricing and lot-sizing under competition," LIDAM Reprints CORE 2938, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Favaretto, Daniela & Pesenti, Raffaele & Ukovich, Walter, 2001. "Discrete frequency models for inventory management - an introduction," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 331-342, May.
- José M. Gutiérrez & Beatriz Abdul-Jalbar & Joaquín Sicilia & Inmaculada Rodríguez-Martín, 2021. "Effective Algorithms for the Economic Lot-Sizing Problem with Bounded Inventory and Linear Fixed-Charge Cost Structure," Mathematics, MDPI, vol. 9(6), pages 1-21, March.
- Hwang, Hark-Chin & Jaruphongsa, Wikrom, 2008. "Dynamic lot-sizing model for major and minor demands," European Journal of Operational Research, Elsevier, vol. 184(2), pages 711-724, January.
- Alf Kimms, 1998. "Ablauforganisation bei Serienproduktion in Fließfertigungssystemen," Schmalenbach Journal of Business Research, Springer, vol. 50(7), pages 641-655, July.
- Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
- Berk, Emre & Toy, Ayhan Ozgur & Hazir, Oncu, 2008. "Single item lot-sizing problem for a warm/cold process with immediate lost sales," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1251-1267, June.
- Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.
- Eksioglu, Sandra Duni, 2009. "A primal-dual algorithm for the economic lot-sizing problem with multi-mode replenishment," European Journal of Operational Research, Elsevier, vol. 197(1), pages 93-101, August.
- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
- Schniederjans, Marc J. & Cao, Qing, 2000. "A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs," International Journal of Production Economics, Elsevier, vol. 65(3), pages 289-294, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:87:y:2004:i:1:p:83-95. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.