IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v202y2010i2p473-478.html
   My bibliography  Save this article

An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments

Author

Listed:
  • Huang, Chao-Kuei
  • Tsai, Deng-Maw
  • Wu, Ji-Cheng
  • Chung, Kun-Jen

Abstract

Trade credit plays an important role in financing for many businesses and industries. For the buyers, purchased inventory can be considered to be financed in whole or in part with permissible delay in payments during the purchasing process. On the other hand, both the vendor and buyer take part in order-processing cost reduction by applying information technologies, such as EDI (electronic data interchange). The order-processing cost can also be reduced by adding certain capital investments, and this will affect the lot size decisions. This article develops an integrated inventory model to determine the optimal inventory policy under conditions of order-processing cost reduction and permissible delay in payments, and shows that the total annual variable cost function possesses some kinds of convexities. A solution procedure is provided to determine the optimal order policy. Finally, a numerical example is presented to illustrate the solution procedure.

Suggested Citation

  • Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
  • Handle: RePEc:eee:ejores:v:202:y:2010:i:2:p:473-478
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(09)00389-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jaggi, Chandra K. & Goyal, S.K. & Goel, S.K., 2008. "Retailer's optimal replenishment decisions with credit-linked demand under permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 190(1), pages 130-135, October.
    2. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    3. Sana, Shib Sankar & Chaudhuri, K.S., 2008. "A deterministic EOQ model with delays in payments and price-discount offers," European Journal of Operational Research, Elsevier, vol. 184(2), pages 509-533, January.
    4. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    5. Teng, Jinn-Tsair & Chang, Chun-Tao, 2009. "Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy," European Journal of Operational Research, Elsevier, vol. 195(2), pages 358-363, June.
    6. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    7. Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
    8. J-T Teng, 2002. "On the economic order quantity under conditions of permissible delay in payments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(8), pages 915-918, August.
    9. Ouyang, Liang-Yuh & Teng, Jinn-Tsair & Goyal, Suresh Kumar & Yang, Chih-Te, 2009. "An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity," European Journal of Operational Research, Elsevier, vol. 194(2), pages 418-431, April.
    10. Jaggi, C. K. & Aggarwal, S. P., 1994. "Credit financing in economic ordering policies of deteriorating items," International Journal of Production Economics, Elsevier, vol. 34(2), pages 151-155, March.
    11. Rau, H. & OuYang, B.C., 2008. "An optimal batch size for integrated production-inventory policy in a supply chain," European Journal of Operational Research, Elsevier, vol. 185(2), pages 619-634, March.
    12. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    13. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Rabbani, M. & Heidari, R. & Yazdanparast, R., 2019. "A stochastic multi-period industrial hazardous waste location-routing problem: Integrating NSGA-II and Monte Carlo simulation," European Journal of Operational Research, Elsevier, vol. 272(3), pages 945-961.
    2. Dharmendra Yadav & S.R. Singh & Rachna Kumari, 2015. "Retailer's optimal policy under inflation in fuzzy environment with trade credit," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(4), pages 754-762, March.
    3. Wu, Kan & Yuan, Xue-Ming, 2016. "Optimal production-inventory policy for an integrated multi-stage supply chain with time-varying demandAuthor-Name: Zhao, Shi Tao," European Journal of Operational Research, Elsevier, vol. 255(2), pages 364-379.
    4. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    5. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An optimal integrated vendor-buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 128(1), pages 445-451, November.
    6. Lin, Feng & Jia, Tao & Wu, Feng & Yang, Zhen, 2019. "Impacts of two-stage deterioration on an integrated inventory model under trade credit and variable capacity utilization," European Journal of Operational Research, Elsevier, vol. 272(1), pages 219-234.
    7. Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme," European Journal of Operational Research, Elsevier, vol. 205(1), pages 47-58, August.
    8. Liang-Yuh Ouyang & Cheng-Ju Chuang & Chia-Huei Ho & Chien-Wei Wu, 2014. "An integrated inventory model with quality improvement and two-part credit policy," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 22(3), pages 1042-1061, October.
    9. Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
    10. Zhou, Yong-Wu & Zhong, Yuanguang & Li, Jicai, 2012. "An uncooperative order model for items with trade credit, inventory-dependent demand and limited displayed-shelf space," European Journal of Operational Research, Elsevier, vol. 223(1), pages 76-85.
    11. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
    12. Zhong, Yuanguang & Shu, Jia & Xie, Wei & Zhou, Yong-Wu, 2018. "Optimal trade credit and replenishment policies for supply chain network design," Omega, Elsevier, vol. 81(C), pages 26-37.
    13. Lihong Wei & Jiaping Xie & Weijun Zhu & Qinglin Li, 2023. "Pricing of platform service supply chain with dual credit: Can you have the cake and eat it?," Annals of Operations Research, Springer, vol. 321(1), pages 589-661, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fei Hu & Cheng-Chew Lim & Zudi Lu, 2015. "The retailer’s optimal decision on order quantity and credit periods under two-level trade credit policy," Journal of Global Optimization, Springer, vol. 62(4), pages 833-852, August.
    2. Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
    3. Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
    4. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    5. Tsao, Yu-Chung, 2017. "Managing default risk under trade credit: Who should implement Big-Data analytics in supply chains?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 106(C), pages 276-293.
    6. Li, Ruihai & Skouri, Konstantina & Teng, Jinn-Tsair & Yang, Wen-Goang, 2018. "Seller's optimal replenishment policy and payment term among advance, cash, and credit payments," International Journal of Production Economics, Elsevier, vol. 197(C), pages 35-42.
    7. Hwang, Juhwen & Wan, Yat-wah, 2013. "A supplier–retailer supply chain with intermediate storage for batch ordering," International Journal of Production Economics, Elsevier, vol. 142(2), pages 343-352.
    8. Chung, Kun-Jen & Eduardo Cárdenas-Barrón, Leopoldo & Ting, Pin-Shou, 2014. "An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 310-317.
    9. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    10. Dye, Chung-Yuan & Yang, Chih-Te, 2015. "Sustainable trade credit and replenishment decisions with credit-linked demand under carbon emission constraints," European Journal of Operational Research, Elsevier, vol. 244(1), pages 187-200.
    11. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An optimal integrated vendor-buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 128(1), pages 445-451, November.
    12. Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme," European Journal of Operational Research, Elsevier, vol. 205(1), pages 47-58, August.
    13. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
    14. B. C. Giri & S. Sharma, 2016. "Optimal ordering policy for an inventory system with linearly increasing demand and allowable shortages under two levels trade credit financing," Operational Research, Springer, vol. 16(1), pages 25-50, April.
    15. Taleizadeh, Ata Allah & Pentico, David W. & Saeed Jabalameli, Mohammad & Aryanezhad, Mirbahador, 2013. "An EOQ model with partial delayed payment and partial backordering," Omega, Elsevier, vol. 41(2), pages 354-368.
    16. A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
    17. Majumder, P. & Bera, U.K. & Maiti, M., 2016. "An EPQ model for two-warehouse in unremitting release pattern with two-level trade credit period concerning both supplier and retailer," Applied Mathematics and Computation, Elsevier, vol. 274(C), pages 430-458.
    18. Zhou, Yong-Wu & Zhong, Yuanguang & Li, Jicai, 2012. "An uncooperative order model for items with trade credit, inventory-dependent demand and limited displayed-shelf space," European Journal of Operational Research, Elsevier, vol. 223(1), pages 76-85.
    19. Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
    20. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:202:y:2010:i:2:p:473-478. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.