From EOQ Towards ZI
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.33.10.1209
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
- Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
- Meller, Russell D., 1995. "The impact of multiple stocking points on system profitability," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 209-214, March.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
- Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
- Suerie, Christopher, 2006. "Modeling of period overlapping setup times," European Journal of Operational Research, Elsevier, vol. 174(2), pages 874-886, October.
- Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
- Matsuyama, Keisuke, 1995. "Inventory policy with time-dependent setup cost," International Journal of Production Economics, Elsevier, vol. 42(2), pages 149-160, December.
- White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
- Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
- Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
- Denizel, Meltem & Erenguc, Selcuk & Benson, Harold P., 1997. "Dynamic lot-sizing with setup cost reduction," European Journal of Operational Research, Elsevier, vol. 100(3), pages 537-549, August.
- Leung, Kit-Nam Francis, 2007. "A generalized geometric-programming solution to "An economic production quantity model with flexibility and reliability considerations"," European Journal of Operational Research, Elsevier, vol. 176(1), pages 240-251, January.
- Hoesel, C. P. M. Van & Wagelmans, A. P. M., 2000. "Parametric analysis of setup cost in the economic lot-sizing model without speculative motives," International Journal of Production Economics, Elsevier, vol. 66(1), pages 13-22, June.
- Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
- Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
- Stadtler, Hartmut, 1996. "Mixed integer programming model formulations for dynamic multi-item multi-level capacitated lotsizing," European Journal of Operational Research, Elsevier, vol. 94(3), pages 561-581, November.
- Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Williams, William W. & Tang, Kwei & Gong, Linguo, 2000. "Process improvement for a container-filling process with random shifts," International Journal of Production Economics, Elsevier, vol. 66(1), pages 23-31, June.
- Samaddar, Subhashish & Hill, Craig A., 2007. "Controlling adverse effect on work in process inventory while reducing machine setup time," European Journal of Operational Research, Elsevier, vol. 180(1), pages 249-261, July.
More about this item
Keywords
inventory/production: zero inventory; facilities/equipment: planning; inventory/production: parametric analysis;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:33:y:1987:i:10:p:1209-1223. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.