IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v23y2005i4p409-422.html
   My bibliography  Save this article

Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry

Author

Listed:
  • Wu Min
  • Low Sui Pheng

Abstract

The literature on the use of just-in-time (JIT) and economic order quantity (EOQ) purchasing has increasingly favoured JIT in recent years, especially when firms are purchasing to meet high and consistent levels of demand, and the JIT operation can take advantage of inventory physical plant space reduction. The theoretical advantages of JIT purchasing may have been overstated. Two new concepts are developed to underpin the idea that, even if the JIT approach can induce inventory physical plant space reduction, it is possible for EOQ to be more cost effective, as the inventory demand approaches the break-even point between the function of the annual holding capacity of an inventory facility and the function of the EOQ-JIT cost indifference point. The survey and case study conducted in the ready-mixed concrete industry in Singapore support this proposition.

Suggested Citation

  • Wu Min & Low Sui Pheng, 2005. "Economic order quantity (EOQ) versus just-in-time (JIT) purchasing: an alternative analysis in the ready-mixed concrete industry," Construction Management and Economics, Taylor & Francis Journals, vol. 23(4), pages 409-422.
  • Handle: RePEc:taf:conmgt:v:23:y:2005:i:4:p:409-422
    DOI: 10.1080/01446190500041339
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190500041339
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190500041339?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Schniederjans, Marc J. & Cao, Qing, 2000. "A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs," International Journal of Production Economics, Elsevier, vol. 65(3), pages 289-294, May.
    2. Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Maria Rosário Moreira & Rui Alves, 2006. "How far from Just-in-time are Portuguese firms? A survey of its progress and perception," FEP Working Papers 215, Universidade do Porto, Faculdade de Economia do Porto.
    2. Louise Bildsten, 2014. "Buyer-supplier relationships in industrialized building," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 146-159, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Tsai, Jung-Fa, 2007. "An optimization approach for supply chain management models with quantity discount policy," European Journal of Operational Research, Elsevier, vol. 177(2), pages 982-994, March.
    2. Wu, Min & Shen, Qiping & Xu, Maozeng & Wu, Desheng, 2013. "Modeling stockout risk and JIT purchasing in ready-mixed concrete batching plants," International Journal of Production Economics, Elsevier, vol. 144(1), pages 14-19.
    3. Min, Wu & Sui Pheng, Low, 2006. "EOQ, JIT and fixed costs in the ready-mixed concrete industry," International Journal of Production Economics, Elsevier, vol. 102(1), pages 167-180, July.
    4. Low Sui Pheng & Wu Min, 2005. "Just-in-time management in the ready mixed concrete industries of Chongqing, China and Singapore," Construction Management and Economics, Taylor & Francis Journals, vol. 23(8), pages 815-829.
    5. San-José, Luis A. & García-Laguna, Juan, 2009. "Optimal policy for an inventory system with backlogging and all-units discounts: Application to the composite lot size model," European Journal of Operational Research, Elsevier, vol. 192(3), pages 808-823, February.
    6. Han, Xiaoya & Yu, Yugang & Hu, Guiping, 2019. "A dynamic newsvendor problem with goodwill-dependent demands and minimum commitment," Omega, Elsevier, vol. 89(C), pages 242-256.
    7. Chung, Wenming & Talluri, Srinivas & Narasimhan, Ram, 2011. "Price markdown scheme in a multi-echelon supply chain in a high-tech industry," European Journal of Operational Research, Elsevier, vol. 215(3), pages 581-589, December.
    8. Ziyang Li & Qianwei Ying & Wu Yan & Chenjun Fan, 2022. "Does just‐in‐time adoption have an impact on corporate innovation: evidence from China," Accounting and Finance, Accounting and Finance Association of Australia and New Zealand, vol. 62(S1), pages 1599-1635, April.
    9. L. San José & J. García-Laguna, 2003. "An EOQ model with backorders and all-units discounts," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 11(2), pages 253-274, December.
    10. Schniederjans, Marc J. & Cao, Qing, 2000. "A note on JIT purchasing vs. EOQ with a price discount: An expansion of inventory costs," International Journal of Production Economics, Elsevier, vol. 65(3), pages 289-294, May.
    11. Hemant K. Bhargava & Daewon Sun & Susan H. Xu, 2006. "Stockout Compensation: Joint Inventory and Price Optimization in Electronic Retailing," INFORMS Journal on Computing, INFORMS, vol. 18(2), pages 255-266, May.
    12. Zheng Shi & Zheng Wen, 2014. "Optimal Sales Discount Decision Model with Fixed Ordered Quantities," Journal of Systems Science and Information, De Gruyter, vol. 2(4), pages 345-357, August.
    13. Ben Jouida, Sihem & Krichen, Saoussen & Klibi, Walid, 2017. "Coalition-formation problem for sourcing contract design in supply networks," European Journal of Operational Research, Elsevier, vol. 257(2), pages 539-558.
    14. Swenseth, Scott R. & Godfrey, Michael R., 2002. "Incorporating transportation costs into inventory replenishment decisions," International Journal of Production Economics, Elsevier, vol. 77(2), pages 113-130, May.
    15. Cao, Qing & Schniederjans, Marc J., 2004. "A revised EMQ/JIT production-run model: An examination of inventory and production costs," International Journal of Production Economics, Elsevier, vol. 87(1), pages 83-95, January.
    16. Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:23:y:2005:i:4:p:409-422. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.