IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v185y2008i2p635-647.html
   My bibliography  Save this article

Performance analysis for assemble-to-order systems with general renewal arrivals and random batch demands

Author

Listed:
  • Lu, Yingdong

Abstract

No abstract is available for this item.

Suggested Citation

  • Lu, Yingdong, 2008. "Performance analysis for assemble-to-order systems with general renewal arrivals and random batch demands," European Journal of Operational Research, Elsevier, vol. 185(2), pages 635-647, March.
  • Handle: RePEc:eee:ejores:v:185:y:2008:i:2:p:635-647
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00116-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Feng Cheng & Markus Ettl & Grace Lin & David D. Yao, 2002. "Inventory-Service Optimization in Configure-to-Order Systems," Manufacturing & Service Operations Management, INFORMS, vol. 4(2), pages 114-132, December.
    2. Yingdong Lu & Jing-Sheng Song & David D. Yao, 2003. "Order Fill Rate, Leadtime Variability, and Advance Demand Information in an Assemble-to-Order System," Operations Research, INFORMS, vol. 51(2), pages 292-308, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    2. Gao, Chunyan & Shen, Houcai & Cheng, T.C.E., 2010. "Order-fulfillment performance analysis of an assemble-to-order system with unreliable machines," International Journal of Production Economics, Elsevier, vol. 126(2), pages 341-349, August.
    3. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    4. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    5. Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
    6. Ana Bušić & Ingrid Vliegen & Alan Scheller-Wolf, 2012. "Comparing Markov Chains: Aggregation and Precedence Relations Applied to Sets of States, with Applications to Assemble-to-Order Systems," Mathematics of Operations Research, INFORMS, vol. 37(2), pages 259-287, May.
    7. ElHafsi, Mohsen & Fang, Jianxin & Camus, Herve, 2018. "Optimal control of a continuous-time W-configuration assemble-to-order system," European Journal of Operational Research, Elsevier, vol. 267(3), pages 917-932.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chen-Ritzo, Ching-Hua & Ervolina, Tom & Harrison, Terry P. & Gupta, Barun, 2010. "Sales and operations planning in systems with order configuration uncertainty," European Journal of Operational Research, Elsevier, vol. 205(3), pages 604-614, September.
    2. Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
    3. Susan H. Xu & Zhaolin Li, 2007. "Managing a Single-Product Assemble-to-Order System with Technology Innovations," Management Science, INFORMS, vol. 53(9), pages 1467-1485, September.
    4. Erica L. Plambeck & Amy R. Ward, 2006. "Optimal Control of a High-Volume Assemble-to-Order System," Mathematics of Operations Research, INFORMS, vol. 31(3), pages 453-477, August.
    5. Kai Huang, 2014. "Benchmarking non-first-come-first-served component allocation in an assemble-to-order system," Annals of Operations Research, Springer, vol. 223(1), pages 217-237, December.
    6. Feng Cheng* & Markus Ettl & Yingdong Lu & David D. Yao, 2012. "A Production–Inventory Model for a Push–Pull Manufacturing System with Capacity and Service Level Constraints," Production and Operations Management, Production and Operations Management Society, vol. 21(4), pages 668-681, July.
    7. Erica L. Plambeck, 2008. "Asymptotically Optimal Control for an Assemble-to-Order System with Capacitated Component Production and Fixed Transport Costs," Operations Research, INFORMS, vol. 56(5), pages 1158-1171, October.
    8. Albrecht, Martin, 2017. "Optimization of safety stocks in models with an order service level objective or constraint," European Journal of Operational Research, Elsevier, vol. 263(3), pages 900-909.
    9. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    10. Jie Chu & Kai Huang, 2020. "Integrating decisions with advance supply information in an assemble‐to‐order system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(1), pages 34-44, February.
    11. Noordhoek, Marije & Dullaert, Wout & Lai, David S.W. & de Leeuw, Sander, 2018. "A simulation–optimization approach for a service-constrained multi-echelon distribution network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 292-311.
    12. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    13. Hoen, K.M.R. & Güllü, R. & van Houtum, G.J. & Vliegen, I.M.H., 2011. "A simple and accurate approximation for the order fill rates in lost-sales Assemble-to-Order systems," International Journal of Production Economics, Elsevier, vol. 133(1), pages 95-104, September.
    14. Willem van Jaarsveld & Alan Scheller-Wolf, 2015. "Optimization of Industrial-Scale Assemble-to-Order Systems," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 544-560, August.
    15. van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
    16. L. Jeff Hong & Barry L. Nelson, 2006. "Discrete Optimization via Simulation Using COMPASS," Operations Research, INFORMS, vol. 54(1), pages 115-129, February.
    17. Edy Fradinata & Sakesun Suthummanon & Wannarat Suntiamorntut, 2015. "Forecasting Determinant of Cement Demand in Indonesia with Artificial Neural Network," Journal of Asian Scientific Research, Asian Economic and Social Society, vol. 5(7), pages 373-384, July.
    18. Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
    19. Antoine Deza & Kai Huang & Hongfeng Liang & Xiao Jiao Wang, 2018. "On component commonality for periodic review assemble-to-order systems," Annals of Operations Research, Springer, vol. 265(1), pages 29-46, June.
    20. Yingdong Lu, 2007. "Estimation of average backorders for an assemble‐to‐order system with random batch demands through extreme statistics," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(1), pages 33-45, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:185:y:2008:i:2:p:635-647. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.