IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v11y2023i7p1728-d1115914.html
   My bibliography  Save this article

A Study of a Two Storage Single Product Inventory System with Ramp Type Demand, N-Phase Prepayment and Purchase for Exigency

Author

Listed:
  • Jagadeesan Viswanath

    (Vel Tech Rangarajan Dr. Sagunthala R&D Institute of Science and Technology, Chennai 600062, India)

  • Rajamanickam Thilagavathi

    (Vel Tech Rangarajan Dr. Sagunthala R&D Institute of Science and Technology, Chennai 600062, India)

  • Krishnasamy Karthik

    (Vel Tech Rangarajan Dr. Sagunthala R&D Institute of Science and Technology, Chennai 600062, India)

  • Miroslav Mahdal

    (Department of Control Systems and Instrumentation, Faculty of Mechanical Engineering, VSB-Technical University of Ostrava, 17. Listopadu 2172/15, 708 00 Ostrava, Czech Republic)

Abstract

This model considers a two-warehouse inventory system of deteriorated items with ramp-type demand and a constant rate of deterioration. It is maintained a rental warehouse ( R W ) of infinite capacity to load the excess items of replenished goods after filling the items of finite capacity in the own warehouse ( O W ). Retailers are encouraged to opt for the prepayment option of paying their purchase cost in equal installments prior to the delivery of the ordered items with a considerable discount, which will ensure the purchase guarantee of their orders. The slotted backlog interval of the stock out period is handled in two different ways to retain the customers and ease their impatience. Customers in the first slot of the stock out period are satisfied by the emergency purchases from local suppliers with high purchasing costs to avoid losing customers. Customers in the next slot are satisfied immediately after the next replenishment point. Essential measures of the system are derived: optimal ordering quantities from both regular and local suppliers; replenishment cycle length; and a partitioned backlog interval. A numerical example is given along with the optimal solutions for a particular environment with sensitive analysis in order to validate the model’s efficacy.

Suggested Citation

  • Jagadeesan Viswanath & Rajamanickam Thilagavathi & Krishnasamy Karthik & Miroslav Mahdal, 2023. "A Study of a Two Storage Single Product Inventory System with Ramp Type Demand, N-Phase Prepayment and Purchase for Exigency," Mathematics, MDPI, vol. 11(7), pages 1-17, April.
  • Handle: RePEc:gam:jmathe:v:11:y:2023:i:7:p:1728-:d:1115914
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/11/7/1728/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/11/7/1728/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
    2. Jia Shu, 2010. "An Efficient Greedy Heuristic for Warehouse-Retailer Network Design Optimization," Transportation Science, INFORMS, vol. 44(2), pages 183-192, May.
    3. Chung-Piaw Teo & Jia Shu, 2004. "Warehouse-Retailer Network Design Problem," Operations Research, INFORMS, vol. 52(3), pages 396-408, June.
    4. Shayan Tavakoli & Ata Allah Taleizadeh, 2017. "An EOQ model for decaying item with full advanced payment and conditional discount," Annals of Operations Research, Springer, vol. 259(1), pages 415-436, December.
    5. Manna, S.K. & Chaudhuri, K.S., 2006. "An EOQ model with ramp type demand rate, time dependent deterioration rate, unit production cost and shortages," European Journal of Operational Research, Elsevier, vol. 171(2), pages 557-566, June.
    6. S. Panda & S. Saha & M. Basu, 2007. "An Eoq Model With Generalized Ramp-Type Demand And Weibull Distribution Deterioration," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 24(01), pages 93-109.
    7. Skouri, K. & Konstantaras, I. & Papachristos, S. & Ganas, I., 2009. "Inventory models with ramp type demand rate, partial backlogging and Weibull deterioration rate," European Journal of Operational Research, Elsevier, vol. 192(1), pages 79-92, January.
    8. Taleizadeh, Ata Allah, 2014. "An EOQ model with partial backordering and advance payments for an evaporating item," International Journal of Production Economics, Elsevier, vol. 155(C), pages 185-193.
    9. Hing-Ling Lau, Amy & Lau, Hon-Shiang, 1998. "Decision models for single-period products with two ordering opportunities," International Journal of Production Economics, Elsevier, vol. 55(1), pages 57-70, June.
    10. Majumder, P. & Bera, U.K. & Maiti, M., 2016. "An EPQ model for two-warehouse in unremitting release pattern with two-level trade credit period concerning both supplier and retailer," Applied Mathematics and Computation, Elsevier, vol. 274(C), pages 430-458.
    11. Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hui-Ling Yang & Chun-Tao Chang & Yao-Ting Tseng, 2024. "Optimal Replenishment Strategy for a High-Tech Product Demand with Non-Instantaneous Deterioration under an Advance-Cash-Credit Payment Scheme by a Discounted Cash-Flow Analysis," Mathematics, MDPI, vol. 12(19), pages 1-25, October.
    2. Viswanath Jagadeesan & Thilagavathi Rajamanickam & Vladimira Schindlerova & Sreelakshmi Subbarayan & Robert Cep, 2023. "A Study on Two-Warehouse Inventory Systems with Integrated Multi-Purpose Production Unit and Partitioned Rental Warehouse," Mathematics, MDPI, vol. 11(18), pages 1-24, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sudip Adak & G. S. Mahapatra, 2022. "Effect of reliability on multi-item inventory system with shortages and partial backlog incorporating time dependent demand and deterioration," Annals of Operations Research, Springer, vol. 315(2), pages 1551-1571, August.
    2. Hung, Kuo-Chen, 2011. "An inventory model with generalized type demand, deterioration and backorder rates," European Journal of Operational Research, Elsevier, vol. 208(3), pages 239-242, February.
    3. Khan, Md. Al-Amin & Cárdenas-Barrón, Leopoldo Eduardo & Treviño-Garza, Gerardo & Céspedes-Mota, Armando, 2023. "Installment for advance payment and pricing decisions for an inventory system under power demand pattern and all-units discount," International Journal of Production Economics, Elsevier, vol. 265(C).
    4. Md. Al-Amin Khan & Ali Akbar Shaikh & Gobinda Chandra Panda & Asoke Kumar Bhunia & Ioannis Konstantaras, 2020. "Non-instantaneous deterioration effect in ordering decisions for a two-warehouse inventory system under advance payment and backlogging," Annals of Operations Research, Springer, vol. 289(2), pages 243-275, June.
    5. Yan Shi & Zhiyong Zhang & Sunil Tiwari & Zhiwen Tao, 2022. "Retailer's optimal strategy for a perishable product with increasing demand under various payment schemes," Annals of Operations Research, Springer, vol. 315(2), pages 899-929, August.
    6. Saha, Subrata & Sarkar, Biswajit & Sarkar, Mitali, 2023. "Application of improved meta-heuristic algorithms for green preservation technology management to optimize dynamical investments and replenishment strategies," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 209(C), pages 426-450.
    7. Al-Amin Khan, Md. & Shaikh, Ali Akbar & Konstantaras, Ioannis & Bhunia, Asoke Kumar & Cárdenas-Barrón, Leopoldo Eduardo, 2020. "Inventory models for perishable items with advanced payment, linearly time-dependent holding cost and demand dependent on advertisement and selling price," International Journal of Production Economics, Elsevier, vol. 230(C).
    8. Wenjun Ni & Jia Shu & Miao Song & Dachuan Xu & Kaike Zhang, 2021. "A Branch-and-Price Algorithm for Facility Location with General Facility Cost Functions," INFORMS Journal on Computing, INFORMS, vol. 33(1), pages 86-104, January.
    9. Yu Li & Jia Shu & Xi Wang & Naihua Xiu & Dachuan Xu & Jiawei Zhang, 2013. "Approximation Algorithms for Integrated Distribution Network Design Problems," INFORMS Journal on Computing, INFORMS, vol. 25(3), pages 572-584, August.
    10. S. Panda & S. Saha & M. Basu, 2009. "Optimal production stopping time for perishable products with ramp-type quadratic demand dependent production and setup cost," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 17(4), pages 381-396, December.
    11. Burcu B. Keskin & Halit Üster, 2012. "Production/distribution system design with inventory considerations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(2), pages 172-195, March.
    12. Zhang, Zhi-Hai & Unnikrishnan, Avinash, 2016. "A coordinated location-inventory problem in closed-loop supply chain," Transportation Research Part B: Methodological, Elsevier, vol. 89(C), pages 127-148.
    13. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    14. Zhong, Yuanguang & Shu, Jia & Xie, Wei & Zhou, Yong-Wu, 2018. "Optimal trade credit and replenishment policies for supply chain network design," Omega, Elsevier, vol. 81(C), pages 26-37.
    15. Ata Allah Taleizadeh & Shayan Tavakoli & Luis Augusto San-José, 2018. "A lot sizing model with advance payment and planned backordering," Annals of Operations Research, Springer, vol. 271(2), pages 1001-1022, December.
    16. Ata Allah Taleizadeh & Sara Tavassoli & Arijit Bhattacharya, 2020. "Inventory ordering policies for mixed sale of products under inspection policy, multiple prepayment, partial trade credit, payments linked to order quantity and full backordering," Annals of Operations Research, Springer, vol. 287(1), pages 403-437, April.
    17. Ping Ruan & Yung-Fu Huang & Ming-Wei Weng, 2022. "Impact of COVID-19 on Supply Chains: A Hybrid Trade Credit Policy," Mathematics, MDPI, vol. 10(8), pages 1-22, April.
    18. Lin Feng & Konstantina Skouri & Wan-Chih Wang & Jinn-Tsair Teng, 2022. "Optimal selling price, replenishment cycle and payment time among advance, cash, and credit payments from the seller’s perspective," Annals of Operations Research, Springer, vol. 315(2), pages 791-812, August.
    19. Mamta Gupta & Sunil Tiwari & Chandra K. Jaggi, 2020. "Retailer’s ordering policies for time-varying deteriorating items with partial backlogging and permissible delay in payments in a two-warehouse environment," Annals of Operations Research, Springer, vol. 295(1), pages 139-161, December.
    20. Yeu-Shiang Huang & Hau-Wen Lo & Jyh-Wen Ho, 2021. "Effects of component commonality and perishability on inventory control in assemble-to-order systems," Operational Research, Springer, vol. 21(1), pages 205-229, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:11:y:2023:i:7:p:1728-:d:1115914. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.