Analysis of expected queueing delays for decision making in production planning
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Karmarkar, Uday S. & Kekre, Sham & Kekre, Sunder, 1992. "Multi-item batching heuristics for minimization of queueing delays," European Journal of Operational Research, Elsevier, vol. 58(1), pages 99-111, April.
- Lode Li & Yew Sing Lee, 1994. "Pricing and Delivery-Time Performance in a Competitive Environment," Management Science, INFORMS, vol. 40(5), pages 633-646, May.
- Tatsiopoulos, I. P. & Kingsman, B. G., 1983. "Lead time management," European Journal of Operational Research, Elsevier, vol. 14(4), pages 351-358, December.
- Axsater, Sven & Olhager, Jan, 1985. "The impact of capacity investments on work-in-process and inventories," Engineering Costs and Production Economics, Elsevier, vol. 9(1-3), pages 119-124, April.
- Yang, Jiaqin & Deane, Richard H., 1993. "Setup time reduction and competitive advantage in a closed manufacturing cell," European Journal of Operational Research, Elsevier, vol. 69(3), pages 413-423, September.
- Rao, S. Subba, 1992. "The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 221-227, February.
- Lode Li, 1992. "The Role of Inventory in Delivery-Time Competition," Management Science, INFORMS, vol. 38(2), pages 182-197, February.
- van Beek, Paul & van Putten, Cornelis, 1987. "OR contributions to flexibility improvement in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 31(1), pages 52-60, July.
- Morris A. Cohen & Hau L. Lee, 1988. "Strategic Analysis of Integrated Production-Distribution Systems: Models and Methods," Operations Research, INFORMS, vol. 36(2), pages 216-228, April.
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- Banker, Rajiv D. & Datar, Srikant M. & Kekre, Sunder, 1988. "Relevant costs, congestion and stochasticity in production environments," Journal of Accounting and Economics, Elsevier, vol. 10(3), pages 171-197, July.
- Guillermo Gallego & Ilkyeong Moon, 1992. "The Effect of Externalizing Setups in the Economic Lot Scheduling Problem," Operations Research, INFORMS, vol. 40(3), pages 614-619, June.
- Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
- Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
- Anne M. Spence & Evan L. Porteus, 1987. "Setup Reduction and Increased Effective Capacity," Management Science, INFORMS, vol. 33(10), pages 1291-1301, October.
- Williams, T. M., 1984. "Special products and uncertainty in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 15(1), pages 46-54, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
- Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
- Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
- Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
- Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
- Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
- Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
- Izack Cohen & Boaz Golany & Avraham Shtub, 2005. "Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology," Annals of Operations Research, Springer, vol. 134(1), pages 183-199, February.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
- Guillermo Gallego & Ilkyeong Moon, 1995. "Strategic investment to reduce setup times in the economic lot scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(5), pages 773-790, August.
- Ocampo y Vilas, Carlos & Vandaele, Nico, 2002. "A cost and operations based product heterogeneity index," International Journal of Production Economics, Elsevier, vol. 79(1), pages 45-55, September.
- Giri, B. C. & Moon, I., 2004. "Note on an economic lot scheduling problem under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 91(3), pages 229-234, October.
- Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
- Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
- Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
- Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
- Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
- Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:110:y:1998:i:3:p:658-681. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.