Setup utilization as a performance indicator in production planning and control
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Karmarkar, Uday S. & Kekre, Sham & Kekre, Sunder, 1992. "Multi-item batching heuristics for minimization of queueing delays," European Journal of Operational Research, Elsevier, vol. 58(1), pages 99-111, April.
- Hegde, G. G. & Nagarajan, Nandu J., 1992. "Incentives for overhead cost reduction: Setup time and lot size considerations," International Journal of Production Economics, Elsevier, vol. 28(3), pages 255-263, December.
- Yang, Jiaqin & Deane, Richard H., 1993. "Setup time reduction and competitive advantage in a closed manufacturing cell," European Journal of Operational Research, Elsevier, vol. 69(3), pages 413-423, September.
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
- Buxey, Geoff, 1989. "Production scheduling: Practice and theory," European Journal of Operational Research, Elsevier, vol. 39(1), pages 17-31, March.
- Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
- Williams, T. M., 1984. "Special products and uncertainty in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 15(1), pages 46-54, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
- Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
- Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
- Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
- Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
- Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
- Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
- Awi Federgruen & Ziv Katalan, 1999. "The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System," Management Science, INFORMS, vol. 45(7), pages 980-994, July.
- Izack Cohen & Boaz Golany & Avraham Shtub, 2005. "Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology," Annals of Operations Research, Springer, vol. 134(1), pages 183-199, February.
- Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
- James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
- Yao Zhao & Benjamin Melamed, 2006. "IPA Derivatives for Make-to-Stock Production-Inventory Systems with Backorders," Methodology and Computing in Applied Probability, Springer, vol. 8(2), pages 191-222, June.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
- Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:49:y:1997:i:2:p:175-182. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.