IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v100y2006i1p1-9.html
   My bibliography  Save this article

Lot size effects on process lead time, lead time demand, and safety stock

Author

Listed:
  • Vaughan, Timothy S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Vaughan, Timothy S., 2006. "Lot size effects on process lead time, lead time demand, and safety stock," International Journal of Production Economics, Elsevier, vol. 100(1), pages 1-9, March.
  • Handle: RePEc:eee:proeco:v:100:y:2006:i:1:p:1-9
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(04)00351-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
    2. Cakanyildirim, Metin & Bookbinder, James H. & Gerchak, Yigal, 2000. "Continuous review inventory models where random lead time depends on lot size and reserved capacity," International Journal of Production Economics, Elsevier, vol. 68(3), pages 217-228, December.
    3. M A Hariga, 2000. "Setup cost reduction in (Q, r) policy with lot size, setup time and lead-time interactions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 51(11), pages 1340-1345, November.
    4. Karmarkar, Uday S. & Kekre, Sham & Kekre, Sunder, 1992. "Multi-item batching heuristics for minimization of queueing delays," European Journal of Operational Research, Elsevier, vol. 58(1), pages 99-111, April.
    5. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
    6. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
    7. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
    8. Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
    9. Rao, S. Subba, 1992. "The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 221-227, February.
    10. S. Rajagopalan, 2002. "Make to Order or Make to Stock: Model and Application," Management Science, INFORMS, vol. 48(2), pages 241-256, February.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    2. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    3. Vergidis, K. & Tiwari, A. & Majeed, B. & Roy, R., 2007. "Optimisation of business process designs: An algorithmic approach with multiple objectives," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 105-121, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
    2. Huang, Shui-Mu & Su, Jack C.P., 2013. "Impact of product proliferation on the reverse supply chain," Omega, Elsevier, vol. 41(3), pages 626-639.
    3. Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
    4. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
    5. Kris Lieckens & Nico Vandaele, 2016. "Differential evolution to solve the lot size problem in stochastic supply chain management systems," Annals of Operations Research, Springer, vol. 242(2), pages 239-263, July.
    6. Altendorfer, Klaus, 2015. "Influence of lot size and planned lead time on service level and inventory for a single-stage production system with advance demand information and random required lead times," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 478-488.
    7. Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
    8. Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
    9. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    10. Izack Cohen & Boaz Golany & Avraham Shtub, 2005. "Managing Stochastic, Finite Capacity, Multi-Project Systems through the Cross-Entropy Methodology," Annals of Operations Research, Springer, vol. 134(1), pages 183-199, February.
    11. Thonemann, Ulrich W. & Bradley, James R., 2002. "The effect of product variety on supply-chain performance," European Journal of Operational Research, Elsevier, vol. 143(3), pages 548-569, December.
    12. Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
    13. Bo Li & Antonio Arreola‐Risa, 2022. "Minimizing conditional value‐at‐risk under a modified basestock policy," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1822-1838, April.
    14. Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
    15. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    16. Lee, Jun-Yeon & Schwarz, Leroy B., 2007. "Leadtime reduction in a (Q,r) inventory system: An agency perspective," International Journal of Production Economics, Elsevier, vol. 105(1), pages 204-212, January.
    17. Lambrecht, Marc R. & Chen, Shaoxiang & Vandaele, Nico J., 1996. "A lot sizing model with queueing delays: The issue of safety time," European Journal of Operational Research, Elsevier, vol. 89(2), pages 269-276, March.
    18. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    19. Shah, Purvi, 2020. "Managing customer reactions to brand deletion in B2B and B2C contexts," Journal of Retailing and Consumer Services, Elsevier, vol. 57(C).
    20. Debabrata Dey & Atanu Lahiri & Guoying Zhang, 2015. "Optimal Policies for Security Patch Management," INFORMS Journal on Computing, INFORMS, vol. 27(3), pages 462-477, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:100:y:2006:i:1:p:1-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.