IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v148y2014icp51-61.html
   My bibliography  Save this article

An integrated simulation–optimization study for consolidating production lines in a configure-to-order production environment

Author

Listed:
  • Aqlan, Faisal
  • Lam, Sarah S.
  • Ramakrishnan, Sreekanth

Abstract

This study investigates production lines consolidation in a configure-to-order production environment using simulation and optimization strategies. The current production environment has three separate production lines that will be consolidated into two production lines. Two production line configurations are analyzed: product and process layouts. Product layout has a continuous smooth flow, small work-in-process (WIP), short total production time per unit of product, and reduced material handling requirements. On the contrary, process layout offers more flexibility, allows for higher utilization of machines, and requires higher grades of operators’ skills. A simulation-based comparison of the current and future systems is conducted considering lead time, throughput, utilization, and WIP. A mixed integer programming model that optimizes the transportation cost and waiting time is then formulated based on the selected process layout. Simulation results provide recommendations to improve the system level performance measures and support management decisions. The current transportation schedule is ineffective, and hence a real-time dashboard based on the optimization model is suggested. The dashboard will improve communication and transportation between the two production lines.

Suggested Citation

  • Aqlan, Faisal & Lam, Sarah S. & Ramakrishnan, Sreekanth, 2014. "An integrated simulation–optimization study for consolidating production lines in a configure-to-order production environment," International Journal of Production Economics, Elsevier, vol. 148(C), pages 51-61.
  • Handle: RePEc:eee:proeco:v:148:y:2014:i:c:p:51-61
    DOI: 10.1016/j.ijpe.2013.11.006
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527313004659
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.11.006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ertay, Tijen, 1998. "Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study," International Journal of Production Economics, Elsevier, vol. 56(1), pages 145-155, September.
    2. Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.
    3. Pazour, Jennifer A. & Meller, Russell D., 2013. "The impact of batch retrievals on throughput performance of a carousel system serviced by a storage and retrieval machine," International Journal of Production Economics, Elsevier, vol. 142(2), pages 332-342.
    4. Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
    5. Sancak, Emre & Salman, F. Sibel, 2011. "Multi-item dynamic lot-sizing with delayed transportation policy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 595-603, June.
    6. Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
    7. Baykoc, Omer Faruk & Erol, Serpil, 1998. "Simulation modelling and analysis of a JIT production system," International Journal of Production Economics, Elsevier, vol. 55(2), pages 203-212, July.
    8. Huang, Min & Wang, Dingwei & Ip, W. H., 1998. "Simulation study of CONWIP for a cold rolling plant," International Journal of Production Economics, Elsevier, vol. 54(3), pages 257-266, May.
    9. Volling, Thomas & Spengler, Thomas S., 2011. "Modeling and simulation of order-driven planning policies in build-to-order automobile production," International Journal of Production Economics, Elsevier, vol. 131(1), pages 183-193, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Martina BOBALOVA & Veronika NOVOTNA, 2021. "Modeling Of Time Delayed Processes In Business Economics," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 15(1), pages 79-89, November.
    2. Aqlan, Faisal & Al-Fandi, Lawrence, 2018. "Prioritizing process improvement initiatives in manufacturing environments," International Journal of Production Economics, Elsevier, vol. 196(C), pages 261-268.
    3. Shishvan, Masoud Soleymani & Benndorf, Jörg, 2019. "Simulation-based optimization approach for material dispatching in continuous mining systems," European Journal of Operational Research, Elsevier, vol. 275(3), pages 1108-1125.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
    2. Laurent Lim, Lâm & Alpan, Gülgün & Penz, Bernard, 2014. "Reconciling sales and operations management with distant suppliers in the automotive industry: A simulation approach," International Journal of Production Economics, Elsevier, vol. 151(C), pages 20-36.
    3. Yuan-Shyi Peter Chiu & Victoria Chiu & Tsu-Ming Yeh & Hua-Yao Wu, 2020. "Incorporating Outsourcing Strategy and Quality Assurance into a Multiproduct Manufacturer–Retailer Coordination Replenishing Decision," Mathematics, MDPI, vol. 8(12), pages 1-19, December.
    4. Frota Neto, João Quariguasi & Bloemhof, Jacqueline & Corbett, Charles, 2016. "Market prices of remanufactured, used and new items: Evidence from eBay," International Journal of Production Economics, Elsevier, vol. 171(P3), pages 371-380.
    5. Saghiri, Soroosh S. & Barnes, Stuart J., 2016. "Supplier flexibility and postponement implementation: An empirical analysis," International Journal of Production Economics, Elsevier, vol. 173(C), pages 170-183.
    6. Zhiming Shi & Yisong Li & Gábor Bohács & Qiang Zhou, 2022. "A Study on Optimal Location Selection and Semi-Finished Product Inventory Allocation in the Steel Industry," Sustainability, MDPI, vol. 14(22), pages 1-21, November.
    7. Baoxi Wang & Zailin Guan & Saif Ullah & Xianhao Xu & Zongdong He, 2017. "Simultaneous order scheduling and mixed-model sequencing in assemble-to-order production environment: a multi-objective hybrid artificial bee colony algorithm," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 419-436, February.
    8. Nicolas, Lenoble & Yannick, Frein & Ramzi, Hammami, 2018. "Order batching in an automated warehouse with several vertical lift modules: Optimization and experiments with real data," European Journal of Operational Research, Elsevier, vol. 267(3), pages 958-976.
    9. Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
    10. Yunting Feng & Yong Geng & Ge Zhao & Mengya Li, 2022. "Carbon Emission Constraint Policy in an OEM and Outsourcing Remanufacturer Supply Chain with Consumer Preferences," IJERPH, MDPI, vol. 19(8), pages 1-16, April.
    11. Azadeh, K. & de Koster, M.B.M. & Roy, D., 2017. "Robotized Warehouse Systems: Developments and Research Opportunities," ERIM Report Series Research in Management ERS-2017-009-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    12. Wikner, Joakim & Naim, Mohamed M. & Spiegler, Virginia L.M. & Lin, Junyi, 2017. "IOBPCS based models and decoupling thinking," International Journal of Production Economics, Elsevier, vol. 194(C), pages 153-166.
    13. Kovcs, Andrs & Brown, Kenneth N. & Tarim, S. Armagan, 2009. "An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups," International Journal of Production Economics, Elsevier, vol. 118(1), pages 282-291, March.
    14. Ertay, Tijen & Ruan, Da, 2005. "Data envelopment analysis based decision model for optimal operator allocation in CMS," European Journal of Operational Research, Elsevier, vol. 164(3), pages 800-810, August.
    15. Dukic, Goran & Opetuk, Tihomir & Lerher, Tone, 2015. "A throughput model for a dual-tray Vertical Lift Module with a human order-picker," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 874-881.
    16. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    17. Ullah Saif & Zailin Guan & Li Zhang & Fei Zhang & Baoxi Wang & Jahanzaib Mirza, 2019. "Multi-objective artificial bee colony algorithm for order oriented simultaneous sequencing and balancing of multi-mixed model assembly line," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1195-1220, March.
    18. Staeblein, Thomas & Aoki, Katsuki, 2015. "Planning and scheduling in the automotive industry: A comparison of industrial practice at German and Japanese makers," International Journal of Production Economics, Elsevier, vol. 162(C), pages 258-272.
    19. Ben Ali, M. & D’Amours, S. & Gaudreault, J. & Carle, M-A., 2018. "Configuration and evaluation of an integrated demand management process using a space-filling design and Kriging metamodeling," Operations Research Perspectives, Elsevier, vol. 5(C), pages 45-58.
    20. Thorben Krueger & Achim Koberstein & Norbert Bittner, 2022. "Anticipating technical car sequencing rules in the master production scheduling of mixed-model assembly lines," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 351-407, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:148:y:2014:i:c:p:51-61. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.