An integrated simulation–optimization study for consolidating production lines in a configure-to-order production environment
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2013.11.006
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Ertay, Tijen, 1998. "Simulation approach in comparison of a pull system in a cell production system with a push system in a conventional production system according to flexible cost: A case study," International Journal of Production Economics, Elsevier, vol. 56(1), pages 145-155, September.
- Kampf, M. & Kochel, P., 2006. "Simulation-based sequencing and lot size optimisation for a production-and-inventory system with multiple items," International Journal of Production Economics, Elsevier, vol. 104(1), pages 191-200, November.
- Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
- Sharda, Bikram & Akiya, Naoko, 2012. "Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation," International Journal of Production Economics, Elsevier, vol. 136(1), pages 161-171.
- Baykoc, Omer Faruk & Erol, Serpil, 1998. "Simulation modelling and analysis of a JIT production system," International Journal of Production Economics, Elsevier, vol. 55(2), pages 203-212, July.
- Pazour, Jennifer A. & Meller, Russell D., 2013. "The impact of batch retrievals on throughput performance of a carousel system serviced by a storage and retrieval machine," International Journal of Production Economics, Elsevier, vol. 142(2), pages 332-342.
- Huang, Min & Wang, Dingwei & Ip, W. H., 1998. "Simulation study of CONWIP for a cold rolling plant," International Journal of Production Economics, Elsevier, vol. 54(3), pages 257-266, May.
- Sancak, Emre & Salman, F. Sibel, 2011. "Multi-item dynamic lot-sizing with delayed transportation policy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 595-603, June.
- Volling, Thomas & Spengler, Thomas S., 2011. "Modeling and simulation of order-driven planning policies in build-to-order automobile production," International Journal of Production Economics, Elsevier, vol. 131(1), pages 183-193, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Martina BOBALOVA & Veronika NOVOTNA, 2021. "Modeling Of Time Delayed Processes In Business Economics," Proceedings of the INTERNATIONAL MANAGEMENT CONFERENCE, Faculty of Management, Academy of Economic Studies, Bucharest, Romania, vol. 15(1), pages 79-89, November.
- Aqlan, Faisal & Al-Fandi, Lawrence, 2018. "Prioritizing process improvement initiatives in manufacturing environments," International Journal of Production Economics, Elsevier, vol. 196(C), pages 261-268.
- Shishvan, Masoud Soleymani & Benndorf, Jörg, 2019. "Simulation-based optimization approach for material dispatching in continuous mining systems," European Journal of Operational Research, Elsevier, vol. 275(3), pages 1108-1125.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
- Yuan-Shyi Peter Chiu & Victoria Chiu & Tsu-Ming Yeh & Hua-Yao Wu, 2020. "Incorporating Outsourcing Strategy and Quality Assurance into a Multiproduct Manufacturer–Retailer Coordination Replenishing Decision," Mathematics, MDPI, vol. 8(12), pages 1-19, December.
- Baoxi Wang & Zailin Guan & Saif Ullah & Xianhao Xu & Zongdong He, 2017. "Simultaneous order scheduling and mixed-model sequencing in assemble-to-order production environment: a multi-objective hybrid artificial bee colony algorithm," Journal of Intelligent Manufacturing, Springer, vol. 28(2), pages 419-436, February.
- Iman Ghalehkhondabi & Dusan Sormaz & Gary Weckman, 2016. "Multiple customer order decoupling points within a hybrid MTS/MTO manufacturing supply chain with uncertain demands in two consecutive echelons," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 976-997, December.
- Yunting Feng & Yong Geng & Ge Zhao & Mengya Li, 2022. "Carbon Emission Constraint Policy in an OEM and Outsourcing Remanufacturer Supply Chain with Consumer Preferences," IJERPH, MDPI, vol. 19(8), pages 1-16, April.
- Kovcs, Andrs & Brown, Kenneth N. & Tarim, S. Armagan, 2009. "An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups," International Journal of Production Economics, Elsevier, vol. 118(1), pages 282-291, March.
- Ertay, Tijen & Ruan, Da, 2005. "Data envelopment analysis based decision model for optimal operator allocation in CMS," European Journal of Operational Research, Elsevier, vol. 164(3), pages 800-810, August.
- Dukic, Goran & Opetuk, Tihomir & Lerher, Tone, 2015. "A throughput model for a dual-tray Vertical Lift Module with a human order-picker," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 874-881.
- Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
- Ullah Saif & Zailin Guan & Li Zhang & Fei Zhang & Baoxi Wang & Jahanzaib Mirza, 2019. "Multi-objective artificial bee colony algorithm for order oriented simultaneous sequencing and balancing of multi-mixed model assembly line," Journal of Intelligent Manufacturing, Springer, vol. 30(3), pages 1195-1220, March.
- Fernando José Gómez Paredes & Moacir Godinho Filho & Matthias Thürer & Nuno O. Fernandes & Charbel José Chiappeta Jabbour, 2022. "Factors for choosing production control systems in make-to-order shops: a systematic literature review," Journal of Intelligent Manufacturing, Springer, vol. 33(3), pages 639-674, March.
- Lee, Der-Horng & Dong, Meng & Bian, Wen, 2010. "The design of sustainable logistics network under uncertainty," International Journal of Production Economics, Elsevier, vol. 128(1), pages 159-166, November.
- Hachicha, Wafik & Ammeri, Ahmed & Masmoudi, Faouzi & Chachoub, Habib, 2010. "A comprehensive literature classification of simulation optimisation methods," MPRA Paper 27652, University Library of Munich, Germany.
- Yazan K. A. Migdadi & Ahmed A. Khalifa & Abdullah Al-Swidi & Abdulkarem I. Amhamed & Muftah H. El-Naas, 2022. "A Conceptual Framework of Customer Value Proposition of CCU-Formic Acid Product," Sustainability, MDPI, vol. 14(24), pages 1-21, December.
- Diedrich, Katharina & Klingebiel, Katja, 2019. "Smart risk analytics design for proactive early warning," Chapters from the Proceedings of the Hamburg International Conference of Logistics (HICL), in: Kersten, Wolfgang & Blecker, Thorsten & Ringle, Christian M. (ed.), Artificial Intelligence and Digital Transformation in Supply Chain Management: Innovative Approaches for Supply Chains. Proceedings of the Hamburg Int, volume 27, pages 559-585, Hamburg University of Technology (TUHH), Institute of Business Logistics and General Management.
- Noroozi, Sayeh & Wikner, Joakim, 2017. "Sales and operations planning in the process industry: A literature review," International Journal of Production Economics, Elsevier, vol. 188(C), pages 139-155.
- Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
- Ilgin, Mehmet Ali & Gupta, Surendra M., 2011. "Performance improvement potential of sensor embedded products in environmental supply chains," Resources, Conservation & Recycling, Elsevier, vol. 55(6), pages 580-592.
- Köchel, Peter & Thiem, Stefanie, 2011. "Search for good policies in a single-warehouse, multi-retailer system by particle swarm optimisation," International Journal of Production Economics, Elsevier, vol. 133(1), pages 319-325, September.
- Carlson, John G.H. & Yao, Andrew C., 2008. "Simulating an agile, synchronized manufacturing system," International Journal of Production Economics, Elsevier, vol. 112(2), pages 714-722, April.
More about this item
Keywords
Simulation; Optimization; Process layout; Product layout; Dynamic batch size; Configure-to-order production; Server manufacturing;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:148:y:2014:i:c:p:51-61. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.