IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v55y1998i2p203-212.html
   My bibliography  Save this article

Simulation modelling and analysis of a JIT production system

Author

Listed:
  • Baykoc, Omer Faruk
  • Erol, Serpil

Abstract

No abstract is available for this item.

Suggested Citation

  • Baykoc, Omer Faruk & Erol, Serpil, 1998. "Simulation modelling and analysis of a JIT production system," International Journal of Production Economics, Elsevier, vol. 55(2), pages 203-212, July.
  • Handle: RePEc:eee:proeco:v:55:y:1998:i:2:p:203-212
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00061-9
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Meral, Sedef & Erkip, Nesim, 1991. "Simulation analysis of a JIT production line," International Journal of Production Economics, Elsevier, vol. 24(1-2), pages 147-156, November.
    2. Gunasekaran, A. & Goyal, S. K. & Martikainen, T. & Yli-Olli, P., 1993. "Modelling and analysis of just-in-time manufacturing systems," International Journal of Production Economics, Elsevier, vol. 32(1), pages 23-37, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Aqlan, Faisal & Lam, Sarah S. & Ramakrishnan, Sreekanth, 2014. "An integrated simulation–optimization study for consolidating production lines in a configure-to-order production environment," International Journal of Production Economics, Elsevier, vol. 148(C), pages 51-61.
    2. Ozbayrak, M. & Akgun, M., 2006. "The effects of manufacturing control strategies on the cash conversion cycle in manufacturing systems," International Journal of Production Economics, Elsevier, vol. 103(2), pages 535-550, October.
    3. Mohammad Ziaei & Seyed Mojtaba Sajadi & Mohammad Mehdi Tavakoli, 2016. "The performance improvement of water pump manufacturing system via multi-criteria decision-making and simulation (a case study: Iran Godakht Company)," International Journal of Productivity and Quality Management, Inderscience Enterprises Ltd, vol. 17(1), pages 1-15.
    4. Ozbayrak, M. & Akgun, M. & Turker, A. K., 2004. "Activity-based cost estimation in a push/pull advanced manufacturing system," International Journal of Production Economics, Elsevier, vol. 87(1), pages 49-65, January.
    5. Carlson, John G.H. & Yao, Andrew C., 2008. "Simulating an agile, synchronized manufacturing system," International Journal of Production Economics, Elsevier, vol. 112(2), pages 714-722, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Sarper, H. & Henry, M. C., 1996. "Combinatorial evaluation of six dispatching rules in a dynamic two-machine flow shop," Omega, Elsevier, vol. 24(1), pages 73-81, February.
    2. Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
    3. Gaury, E.G.A. & Kleijnen, J.P.C. & Pierreval, H., 1998. "Customized Pull Systems for Single-Product Flow Lines," Discussion Paper 1998-117, Tilburg University, Center for Economic Research.
    4. Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.
    5. Dengiz, Berna & Akbay, Kunter S., 2000. "Computer simulation of a PCB production line: metamodeling approach," International Journal of Production Economics, Elsevier, vol. 63(2), pages 195-205, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:55:y:1998:i:2:p:203-212. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.