A Combined Capacity Planning and Simulation Approach for the Optimization of AGV Systems in Complex Production Logistics Environments
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Ping Lou & Yutong Zhong & Jiwei Hu & Chuannian Fan & Xiao Chen, 2023. "Digital-Twin-Driven AGV Scheduling and Routing in Automated Container Terminals," Mathematics, MDPI, vol. 11(12), pages 1-25, June.
- Li, Jianzhi & González, Miguel & Zhu, Yun, 2009. "A hybrid simulation optimization method for production planning of dedicated remanufacturing," International Journal of Production Economics, Elsevier, vol. 117(2), pages 286-301, February.
- Georgiadis, Patroklos & Athanasiou, Efstratios, 2013. "Flexible long-term capacity planning in closed-loop supply chains with remanufacturing," European Journal of Operational Research, Elsevier, vol. 225(1), pages 44-58.
- Andres F. Osorio & Sally C. Brailsford & Honora K. Smith & Sonia P. Forero-Matiz & Bernardo A. Camacho-Rodríguez, 2017. "Simulation-optimization model for production planning in the blood supply chain," Health Care Management Science, Springer, vol. 20(4), pages 548-564, December.
- Huthaifa AL-Khazraji & Colin Cole & William Guo, 2021. "Optimization and Simulation of Dynamic Performance of Production–Inventory Systems with Multivariable Controls," Mathematics, MDPI, vol. 9(5), pages 1-13, March.
- Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Diaz, Juan Esteban & Handl, Julia & Xu, Dong-Ling, 2018. "Integrating meta-heuristics, simulation and exact techniques for production planning of a failure-prone manufacturing system," European Journal of Operational Research, Elsevier, vol. 266(3), pages 976-989.
- Zhang, Abraham & Wang, Jason X. & Farooque, Muhammad & Wang, Yulan & Choi, Tsan-Ming, 2021. "Multi-dimensional circular supply chain management: A comparative review of the state-of-the-art practices and research," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 155(C).
- Romauch, Martin & Hartl, Richard F., 2017. "Capacity planning for cluster tools in the semiconductor industry," International Journal of Production Economics, Elsevier, vol. 194(C), pages 167-180.
- Samani, Mohammad Reza Ghatreh & Hosseini-Motlagh, Seyyed-Mahdi & Homaei, Shamim, 2020. "A reactive phase against disruptions for designing a proactive platelet supply network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 140(C).
- Zhen-Zheng Zhang & Zong-Jun Wang & Li-Wen Liu, 2015. "Retail Services and Pricing Decisions in a Closed-Loop Supply Chain with Remanufacturing," Sustainability, MDPI, vol. 7(3), pages 1-24, February.
- Chua, Geoffrey A. & Senga, Juan Ramon L., 2022. "Blood supply interventions during disasters: Efficiency measures and strategies to mitigate volatility," Socio-Economic Planning Sciences, Elsevier, vol. 84(C).
- Yunting Feng & Yong Geng & Ge Zhao & Mengya Li, 2022. "Carbon Emission Constraint Policy in an OEM and Outsourcing Remanufacturer Supply Chain with Consumer Preferences," IJERPH, MDPI, vol. 19(8), pages 1-16, April.
- Muris Lage Junior & Moacir Godinho Filho, 2017. "Master disassembly scheduling in a remanufacturing system with stochastic routings," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 25(1), pages 123-138, March.
- Rajesh, R., 2017. "Technological capabilities and supply chain resilience of firms: A relational analysis using Total Interpretive Structural Modeling (TISM)," Technological Forecasting and Social Change, Elsevier, vol. 118(C), pages 161-169.
- Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
- Federico Cosenz & Guido Noto, 2016. "Applying System Dynamics Modelling to Strategic Management: A Literature Review," Systems Research and Behavioral Science, Wiley Blackwell, vol. 33(6), pages 703-741, November.
- He, Yuanjie, 2015. "Acquisition pricing and remanufacturing decisions in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 163(C), pages 48-60.
- Lin, Junyi & Naim, Mohamed M. & Tang, Ou, 2024. "In-house or outsourcing? The impact of remanufacturing strategies on the dynamics of component remanufacturing systems under lifecycle demand and returns," European Journal of Operational Research, Elsevier, vol. 315(3), pages 965-979.
- Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
- Mota, Bruna & Gomes, Maria Isabel & Carvalho, Ana & Barbosa-Povoa, Ana Paula, 2018. "Sustainable supply chains: An integrated modeling approach under uncertainty," Omega, Elsevier, vol. 77(C), pages 32-57.
- Lee, Der-Horng & Dong, Meng & Bian, Wen, 2010. "The design of sustainable logistics network under uncertainty," International Journal of Production Economics, Elsevier, vol. 128(1), pages 159-166, November.
- Fabián Silva-Aravena & Irlanda Ceballos-Fuentealba & Eduardo Álvarez-Miranda, 2020. "Inventory Management at a Chilean Hospital Pharmacy: Case Study of a Dynamic Decision-Aid Tool," Mathematics, MDPI, vol. 8(11), pages 1-20, November.
- He, Yuanjie, 2017. "Supply risk sharing in a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 39-52.
- Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
- Ilgin, Mehmet Ali & Gupta, Surendra M., 2011. "Performance improvement potential of sensor embedded products in environmental supply chains," Resources, Conservation & Recycling, Elsevier, vol. 55(6), pages 580-592.
More about this item
Keywords
capacity planning; production logistics; discrete event simulation; AGV; simulation experiments; Industry 4.0;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jlogis:v:8:y:2024:i:4:p:121-:d:1523310. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.