Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tan, Baris, 1998. "Effects of variability on the due-time performance of a continuous materials flow production system in series," International Journal of Production Economics, Elsevier, vol. 54(1), pages 87-100, January.
- Stefan Helber & Hanifa Jusić, 2004. "A New Decomposition Approach for Non-Cyclic Continuous Material Flow Lines with a Merging Flow of Material," Annals of Operations Research, Springer, vol. 125(1), pages 117-139, January.
- Yeralan, Sencer & Franck, Wallace E. & Quasem, Mohammad A., 1986. "A continuous materials flow production line model with station breakdown," European Journal of Operational Research, Elsevier, vol. 27(3), pages 289-300, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi, 2015. "The two-machine one-buffer continuous time model with restart policy," Annals of Operations Research, Springer, vol. 231(1), pages 33-64, August.
- Wei, Shuaichong & Nourelfath, Mustapha & Nahas, Nabil, 2023. "Analysis of a production line subject to degradation and preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
- Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha & Gershwin, Stanley B., 2017. "Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 61-72.
- Liu, Jialu & Yang, Sheng & Wu, Aiguo & Hu, S. Jack, 2012. "Multi-state throughput analysis of a two-stage manufacturing system with parallel unreliable machines and a finite buffer," European Journal of Operational Research, Elsevier, vol. 219(2), pages 296-304.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
- Shi, Chuan & Gershwin, Stanley B., 2016. "Part sojourn time distribution in a two-machine line," European Journal of Operational Research, Elsevier, vol. 248(1), pages 146-158.
- Zhang, Ning & Qi, Faqun & Zhang, Chengjie & Zhou, Hongming, 2022. "Joint optimization of condition-based maintenance policy and buffer capacity for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Kucuksayacigil, Fikri & Roni, Mohammad & Eksioglu, Sandra D. & Bhuiyan, Tanveer H. & Chen, Qiushi, 2022. "Optimal control to handle variations in moisture content and reactor in-feed rate," Energy, Elsevier, vol. 248(C).
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
- Kolb, Oliver & Göttlich, Simone, 2015. "A continuous buffer allocation model using stochastic processes," European Journal of Operational Research, Elsevier, vol. 242(3), pages 865-874.
- Hatice Ucar Guner & Alper Murat & Ratna Babu Chinnam, 2024. "Performance analysis of a production system with two deteriorating machines and a finite buffer," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 32(3), pages 621-651, September.
- Andrea Matta & Francesca Simone, 2016. "Analysis of two-machine lines with finite buffer, operation-dependent and time-dependent failure modes," International Journal of Production Research, Taylor & Francis Journals, vol. 54(6), pages 1850-1862, March.
- Barış Tan & Stanley Gershwin, 2011. "Modelling and analysis of Markovian continuous flow systems with a finite buffer," Annals of Operations Research, Springer, vol. 182(1), pages 5-30, January.
- Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
- Marcello Colledani & Stanley Gershwin, 2013. "A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines," Annals of Operations Research, Springer, vol. 209(1), pages 5-40, October.
- Cruz, F.R.B. & Van Woensel, T. & Smith, J. MacGregor, 2010. "Buffer and throughput trade-offs in M/G/1/K queueing networks: A bi-criteria approach," International Journal of Production Economics, Elsevier, vol. 125(2), pages 224-234, June.
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
- Barış Tan & Stanley Gershwin, 2011. "Modelling and analysis of Markovian continuous flow systems with a finite buffer," Annals of Operations Research, Springer, vol. 182(1), pages 5-30, January.
- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- Sorensen, Kenneth & Janssens, Gerrit K., 2001. "Buffer allocation and required availability in a transfer line with unreliable machines," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 163-173, December.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Belmansour, Ahmed-Tidjani & Nourelfath, Mustapha, 2010. "An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes," Reliability Engineering and System Safety, Elsevier, vol. 95(11), pages 1193-1201.
- Farhood Rismanchian & Young Hoon Lee, 2018. "Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation," Operational Research, Springer, vol. 18(1), pages 75-95, April.
- Nikolai Stein & Jan Meller & Christoph M. Flath, 2018. "Big data on the shop-floor: sensor-based decision-support for manual processes," Journal of Business Economics, Springer, vol. 88(5), pages 593-616, July.
- Sorensen, Kenneth & Janssens, Gerrit K., 2004. "A Petri net model of a continuous flow transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 152(1), pages 248-262, January.
- Kiesmüller, G.P. & Sachs, F.E., 2020. "Spare parts or buffer? How to design a transfer line with unreliable machines," European Journal of Operational Research, Elsevier, vol. 284(1), pages 121-134.
- Jung Baek & Ho Lee & Se Lee & Soohan Ahn, 2013. "A MAP-modulated fluid flow model with multiple vacations," Annals of Operations Research, Springer, vol. 202(1), pages 19-34, January.
- Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha & Gershwin, Stanley B., 2017. "Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 61-72.
- Marcello Colledani & Stanley Gershwin, 2013. "A decomposition method for approximate evaluation of continuous flow multi-stage lines with general Markovian machines," Annals of Operations Research, Springer, vol. 209(1), pages 5-40, October.
- Kalir, Adar A. & Sarin, Subhash C., 2009. "A method for reducing inter-departure time variability in serial production lines," International Journal of Production Economics, Elsevier, vol. 120(2), pages 340-347, August.
More about this item
Keywords
Continuous-flow systems Fluid flow models Markovian production systems Level crossing analysis Performance evaluation;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:120:y:2009:i:2:p:327-339. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.