Performance analysis of a production system with two deteriorating machines and a finite buffer
Author
Abstract
Suggested Citation
DOI: 10.1007/s10100-023-00871-3
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.
- Stanley B. Gershwin & Irvin C. Schick, 1983. "Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers," Operations Research, INFORMS, vol. 31(2), pages 354-380, April.
- Daniel Bergeron & M. Anouar Jamali & Hidehiko Yamamoto, 2010. "Modelling and analysis of manufacturing systems: a review of existing models," International Journal of Product Development, Inderscience Enterprises Ltd, vol. 10(1/2/3), pages 46-61.
- Jingchuan Chen & Zhiyang Jia & Xiaohan Wang, 2022. "Dynamic performance prediction in flexible production lines with two geometric machines," International Journal of Production Research, Taylor & Francis Journals, vol. 60(13), pages 4006-4024, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
- Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.
- Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
- Stefan Helber & Katja Schimmelpfeng & Raik Stolletz & Svenja Lagershausen, 2011.
"Using linear programming to analyze and optimize stochastic flow lines,"
Annals of Operations Research, Springer, vol. 182(1), pages 193-211, January.
- Helber, Stefan & Schimmelpfeng, Katja & Stolletz, Raik & Lagershausen, Svenja, 2008. "Using linear programming to analyze and optimize stochastic flow lines," Hannover Economic Papers (HEP) dp-389, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Chame, Anna & Tsallis, Constantino, 1990. "Criticality of the discrete N-vector ferromagnet in a cubic lattice with a free surface," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 165(1), pages 41-63.
- Barış Tan, 2019. "Production Control with Price, Cost, and Demand Uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 1057-1085, December.
- S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
- Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
- Korporaal, R. & Ridder, A.A.N. & Kloprogge, P. & Dekker, R., 1999. "Capacity planning of prisons in the Netherlands," Econometric Institute Research Papers EI 9909-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Ünsal Özdoğru & Tayfur Altiok, 2015. "Continuous material flow systems: analysis of marine ports handling bulk materials," Annals of Operations Research, Springer, vol. 231(1), pages 79-104, August.
- Dhouib, K. & Gharbi, A. & Landolsi, N., 2009. "Throughput assessment of mixed-model flexible transfer lines with unreliable machines," International Journal of Production Economics, Elsevier, vol. 122(2), pages 619-627, December.
- George Liberopoulos & George Kozanidis & Panagiotis Tsarouhas, 2007. "Performance Evaluation of an Automatic Transfer Line with WIP Scrapping During Long Failures," Manufacturing & Service Operations Management, INFORMS, vol. 9(1), pages 62-83, December.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Sumi Kim & Seongmoon Kim, 2015. "Differentiated waiting time management according to patient class in an emergency care center using an open Jackson network integrated with pooling and prioritizing," Annals of Operations Research, Springer, vol. 230(1), pages 35-55, July.
- Andrea Matta & Francesca Simone, 2016. "Analysis of two-machine lines with finite buffer, operation-dependent and time-dependent failure modes," International Journal of Production Research, Taylor & Francis Journals, vol. 54(6), pages 1850-1862, March.
- Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Gürkan, G., 1997. "Simulation Optimization of Buffer Allocations in Production Lines with Unreliable Machines," Discussion Paper 1997-97, Tilburg University, Center for Economic Research.
More about this item
Keywords
Machine health; Perfect/imperfect repair; Preventive maintenance; Throughput prediction; Two-machine production line;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:32:y:2024:i:3:d:10.1007_s10100-023-00871-3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.