Performance analysis of a production system with two deteriorating machines and a finite buffer
Author
Abstract
Suggested Citation
DOI: 10.1007/s10100-023-00871-3
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Daniel Bergeron & M. Anouar Jamali & Hidehiko Yamamoto, 2010. "Modelling and analysis of manufacturing systems: a review of existing models," International Journal of Product Development, Inderscience Enterprises Ltd, vol. 10(1/2/3), pages 46-61.
- Stanley B. Gershwin & Irvin C. Schick, 1983. "Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers," Operations Research, INFORMS, vol. 31(2), pages 354-380, April.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Jingchuan Chen & Zhiyang Jia & Xiaohan Wang, 2022. "Dynamic performance prediction in flexible production lines with two geometric machines," International Journal of Production Research, Taylor & Francis Journals, vol. 60(13), pages 4006-4024, July.
- Tan, BarIs & Gershwin, Stanley B., 2009. "Analysis of a general Markovian two-stage continuous-flow production system with a finite buffer," International Journal of Production Economics, Elsevier, vol. 120(2), pages 327-339, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
- Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
- Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2011. "Resource allocation in dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 215(3), pages 670-678, December.
- Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
- Chame, Anna & Tsallis, Constantino, 1990. "Criticality of the discrete N-vector ferromagnet in a cubic lattice with a free surface," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 165(1), pages 41-63.
- S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
- Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
- Korporaal, R. & Ridder, A.A.N. & Kloprogge, P. & Dekker, R., 1999. "Capacity planning of prisons in the Netherlands," Econometric Institute Research Papers EI 9909-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Sumi Kim & Seongmoon Kim, 2015. "Differentiated waiting time management according to patient class in an emergency care center using an open Jackson network integrated with pooling and prioritizing," Annals of Operations Research, Springer, vol. 230(1), pages 35-55, July.
- Papadopoulos, H. T. & Vidalis, M. I., 2001. "Minimizing WIP inventory in reliable production lines," International Journal of Production Economics, Elsevier, vol. 70(2), pages 185-197, March.
- Mehmet Savsar, 2016. "Reliability and availability analysis of a manufacturing line system," Journal of Applied and Physical Sciences, Prof. Vakhrushev Alexander, vol. 2(3), pages 96-106.
- Widom, B. & Clarke, A.S., 1990. "Line tension at the wetting transition," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 168(1), pages 149-159.
- Gürkan, G. & Ozge, A.Y., 1996. "Sample-Path Optimization of Buffer Allocations in a Tandem Queue - Part I : Theoretical Issues," Other publications TiSEM 77da022b-635b-46fd-bf4a-f, Tilburg University, School of Economics and Management.
- Osorio, Carolina & Bierlaire, Michel, 2009. "An analytic finite capacity queueing network model capturing the propagation of congestion and blocking," European Journal of Operational Research, Elsevier, vol. 196(3), pages 996-1007, August.
- Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009.
"Sequencing mixed-model assembly lines: Survey, classification and model critique,"
European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.
- Nils Boysen & Malte Fliedner & Armin Scholl, 2007. "Sequencing mixed-model assembly lines: Survey, classification and model critique," Jena Research Papers in Business and Economics - Working and Discussion Papers (Expired!) 02/2007, Friedrich-Schiller-University Jena, School of Economics and Business Administration.
- Cruz, F.R.B. & Van Woensel, T. & Smith, J. MacGregor, 2010. "Buffer and throughput trade-offs in M/G/1/K queueing networks: A bi-criteria approach," International Journal of Production Economics, Elsevier, vol. 125(2), pages 224-234, June.
- Suliman, S. M. A., 2000. "A mathematical model for a buffered two-stage manufacturing cell with an unreliable transfer device," International Journal of Production Economics, Elsevier, vol. 63(1), pages 69-81, January.
- Jeffrey M. Alden & Lawrence D. Burns & Theodore Costy & Richard D. Hutton & Craig A. Jackson & David S. Kim & Kevin A. Kohls & Jonathan H. Owen & Mark A. Turnquist & David J. Vander Veen, 2006. "General Motors Increases Its Production Throughput," Interfaces, INFORMS, vol. 36(1), pages 6-25, February.
More about this item
Keywords
Machine health; Perfect/imperfect repair; Preventive maintenance; Throughput prediction; Two-machine production line;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:cejnor:v:32:y:2024:i:3:d:10.1007_s10100-023-00871-3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.