Spare parts or buffer? How to design a transfer line with unreliable machines
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2019.12.005
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Elisa Gebennini & Andrea Grassi, 2015. "Discrete-time model for two-machine one-buffer transfer lines with buffer bypass and two capacity levels," IISE Transactions, Taylor & Francis Journals, vol. 47(7), pages 715-727, July.
- Elisa Gebennini & Stanley Gershwin, 2013. "Modeling waste production into two-machine–one-buffer transfer lines," IISE Transactions, Taylor & Francis Journals, vol. 45(6), pages 591-604.
- Da Silveira, Giovani & Borenstein, Denis & Fogliatto, Flavio S., 2001. "Mass customization: Literature review and research directions," International Journal of Production Economics, Elsevier, vol. 72(1), pages 1-13, June.
- Tan, Baris, 1998. "Effects of variability on the due-time performance of a continuous materials flow production system in series," International Journal of Production Economics, Elsevier, vol. 54(1), pages 87-100, January.
- Ribeiro, M.A. & Silveira, J.L. & Qassim, R.Y., 2007. "Joint optimisation of maintenance and buffer size in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 176(1), pages 405-413, January.
- George Liberopoulos, 2018. "Performance evaluation of a production line operated under an echelon buffer policy," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 161-177, March.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Kyriakidis, E.G. & Dimitrakos, T.D., 2006. "Optimal preventive maintenance of a production system with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 168(1), pages 86-99, January.
- Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
- Tan, Baris, 1997. "Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures," European Journal of Operational Research, Elsevier, vol. 101(3), pages 560-576, September.
- Elisa Gebennini & Andrea Grassi & Cesare Fantuzzi & Stanley Gershwin & Irvin Schick, 2013. "Discrete time model for two-machine one-buffer transfer lines with restart policy," Annals of Operations Research, Springer, vol. 209(1), pages 41-65, October.
- Sarah Hudson & Tom McNamara & Sabry Shaaban, 2015. "Unbalanced lines: where are we now?," International Journal of Production Research, Taylor & Francis Journals, vol. 53(6), pages 1895-1911, March.
- Kahan, Tomer & Bukchin, Yossi & Menassa, Roland & Ben-Gal, Irad, 2009. "Backup strategy for robots' failures in an automotive assembly system," International Journal of Production Economics, Elsevier, vol. 120(2), pages 315-326, August.
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Helber, Stefan, 1998. "Decomposition of unreliable assembly/disassembly networks with limited buffer capacity and random processing times," European Journal of Operational Research, Elsevier, vol. 109(1), pages 24-42, August.
- Stanley B. Gershwin, 1987. "An Efficient Decomposition Method for the Approximate Evaluation of Tandem Queues with Finite Storage Space and Blocking," Operations Research, INFORMS, vol. 35(2), pages 291-305, April.
- Lopes, Thiago Cantos & Sikora, C.G.S. & Molina, Rafael Gobbi & Schibelbain, Daniel & Rodrigues, L.C.A. & Magatão, Leandro, 2017. "Balancing a robotic spot welding manufacturing line: An industrial case study," European Journal of Operational Research, Elsevier, vol. 263(3), pages 1033-1048.
- Van der Duyn Schouten, F. A. & Vanneste, S. G., 1995. "Maintenance optimization of a production system with buffer capacity," European Journal of Operational Research, Elsevier, vol. 82(2), pages 323-338, April.
- Patrik Alfredsson & Jos Verrijdt, 1999. "Modeling Emergency Supply Flexibility in a Two-Echelon Inventory System," Management Science, INFORMS, vol. 45(10), pages 1416-1431, October.
- Nabil Nahas, 2017. "Buffer allocation and preventive maintenance optimization in unreliable production lines," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 85-93, January.
- Kranenburg, A.A. & Van Houtum, G.J., 2007. "Effect of commonality on spare parts provisioning costs for capital goods," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 221-227, July.
- Fogliatto, Flavio S. & da Silveira, Giovani J.C. & Borenstein, Denis, 2012. "The mass customization decade: An updated review of the literature," International Journal of Production Economics, Elsevier, vol. 138(1), pages 14-25.
- J. G. Shanthikumar & C. C. Tien, 1983. "An Algorithmic Solution to Two-Stage Transfer Lines with Possible Scrapping of Units," Management Science, INFORMS, vol. 29(9), pages 1069-1086, September.
- Gudrun P. Kiesmüller & Julia Zimmermann, 2018. "The influence of spare parts provisioning on buffer size in a production system," IISE Transactions, Taylor & Francis Journals, vol. 50(5), pages 367-380, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Cai, Yue & Teunter, Ruud H. & de Jonge, Bram, 2023. "A data-driven approach for condition-based maintenance optimization," European Journal of Operational Research, Elsevier, vol. 311(2), pages 730-738.
- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sachs, F.E. & Helber, S. & Kiesmüller, G.P., 2022. "Evaluation of Unreliable Flow Lines with Limited Buffer Capacities and Spare Part Provisioning," European Journal of Operational Research, Elsevier, vol. 302(2), pages 544-559.
- Maria Chiara Magnanini & Tullio Tolio, 2020. "Switching- and hedging- point policy for preventive maintenance with degrading machines: application to a two-machine line," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 241-271, June.
- Dimitrakos, T.D. & Kyriakidis, E.G., 2008. "A semi-Markov decision algorithm for the maintenance of a production system with buffer capacity and continuous repair times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 752-762, February.
- Yifan Zhou & Chao Yuan & Tian Ran Lin & Lin Ma, 2021. "Maintenance policy structure investigation and optimisation of a complex production system with intermediate buffers," Journal of Risk and Reliability, , vol. 235(3), pages 458-473, June.
- Ribeiro, M.A. & Silveira, J.L. & Qassim, R.Y., 2007. "Joint optimisation of maintenance and buffer size in a manufacturing system," European Journal of Operational Research, Elsevier, vol. 176(1), pages 405-413, January.
- Karamatsoukis, C.C. & Kyriakidis, E.G., 2010. "Optimal maintenance of two stochastically deteriorating machines with an intermediate buffer," European Journal of Operational Research, Elsevier, vol. 207(1), pages 297-308, November.
- Zhang, Ning & Qi, Faqun & Zhang, Chengjie & Zhou, Hongming, 2022. "Joint optimization of condition-based maintenance policy and buffer capacity for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Shuyuan Gan & Bolun Wang & Zhifang Song, 2021. "A Combined Maintenance Strategy Considering Spares, Buffer, and Quality," Journal of Risk and Reliability, , vol. 235(3), pages 431-445, June.
- Beixin Xia & Binghai Zhou & Ci Chen & Lifeng Xi, 2016. "A generalized-exponential decomposition method for the analysis of inhomogeneous assembly/disassembly systems with unreliable machines and finite buffers," Journal of Intelligent Manufacturing, Springer, vol. 27(4), pages 765-779, August.
- Belmansour, Ahmed-Tidjani & Nourelfath, Mustapha, 2010. "An aggregation method for performance evaluation of a tandem homogenous production line with machines having multiple failure modes," Reliability Engineering and System Safety, Elsevier, vol. 95(11), pages 1193-1201.
- Farhood Rismanchian & Young Hoon Lee, 2018. "Moment-based approximations for first- and second-order transient performance measures of an unreliable workstation," Operational Research, Springer, vol. 18(1), pages 75-95, April.
- Jean-Sébastien Tancrez, 2020. "A decomposition method for assembly/disassembly systems with blocking and general distributions," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 272-296, June.
- Na Liu & Pui-Sze Chow & Hongshan Zhao, 2020. "Challenges and critical successful factors for apparel mass customization operations: recent development and case study," Annals of Operations Research, Springer, vol. 291(1), pages 531-563, August.
- Dehayem Nodem, F.I. & Kenné, J.P. & Gharbi, A., 2011. "Simultaneous control of production, repair/replacement and preventive maintenance of deteriorating manufacturing systems," International Journal of Production Economics, Elsevier, vol. 134(1), pages 271-282, November.
- Konstantinos S. Boulas & Georgios D. Dounias & Chrissoleon T. Papadopoulos, 2023. "A hybrid evolutionary algorithm approach for estimating the throughput of short reliable approximately balanced production lines," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 823-852, February.
- Sandrin, Enrico & Trentin, Alessio & Forza, Cipriano, 2018. "Leveraging high-involvement practices to develop mass customization capability: A contingent configurational perspective," International Journal of Production Economics, Elsevier, vol. 196(C), pages 335-345.
- A. Azadeh & M. Sheikhalishahi & S. Mortazavi & E. Ahmadi Jooghi, 2017. "Joint quality control and preventive maintenance strategy: a unique taguchi approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 123-134, March.
- A. Arrighetti & F. Landini, 2018. "Eterogeneità delle imprese e stagnazione del capitalismo italiano," Economics Department Working Papers 2018-EP01, Department of Economics, Parma University (Italy).
- Rahimi-Ghahroodi, S. & Al Hanbali, A. & Vliegen, I.M.H. & Cohen, M.A., 2019. "Joint optimization of spare parts inventory and service engineers staffing with full backlogging," International Journal of Production Economics, Elsevier, vol. 212(C), pages 39-50.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
More about this item
Keywords
Manufacturing systems; Transfer lines; Stochastic models; Spare parts;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:284:y:2020:i:1:p:121-134. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.