IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v91y2004i1p75-90.html
   My bibliography  Save this article

A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies

Author

Listed:
  • Geraghty, John
  • Heavey, Cathal

Abstract

No abstract is available for this item.

Suggested Citation

  • Geraghty, John & Heavey, Cathal, 2004. "A comparison of Hybrid Push/Pull and CONWIP/Pull production inventory control policies," International Journal of Production Economics, Elsevier, vol. 91(1), pages 75-90, September.
  • Handle: RePEc:eee:proeco:v:91:y:2004:i:1:p:75-90
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(03)00210-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Pandey, P. C. & Khokhajaikiat, Porntep, 1996. "Performance modeling of multistage production systems operating under hybrid push/pull control," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 115-126, June.
    2. Pandey, P. C. & Khokhajaikiat, Porntep, 1996. "Performance modeling of multistage production systems operating under hybrid push/pull control," International Journal of Production Economics, Elsevier, vol. 43(1), pages 17-28, May.
    3. Takahashi, Katsuhiko & Soshiroda, Michio, 1996. "Comparing integration strategies in production ordering systems," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 83-89, June.
    4. Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
    5. Lee J. Krajewski & Barry E. King & Larry P. Ritzman & Danny S. Wong, 1987. "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, INFORMS, vol. 33(1), pages 39-57, January.
    6. E G A Gaury & J P C Kleijnen & H Pierreval, 2001. "A methodology to customize pull control systems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 52(7), pages 789-799, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yang, Taho & Fu, Hsin-Pin & Yang, Kuang-Yi, 2007. "An evolutionary-simulation approach for the optimization of multi-constant work-in-process strategy--A case study," International Journal of Production Economics, Elsevier, vol. 107(1), pages 104-114, May.
    2. Park, Chan-Woo & Lee, Hyo-Seong, 2013. "Performance evaluation of a multi-product CONWIP assembly system with correlated external demands," International Journal of Production Economics, Elsevier, vol. 144(1), pages 334-344.
    3. Othmane Benmoussa, 2022. "Improving Replenishment Flows Using Simulation Results: A Case Study," Logistics, MDPI, vol. 6(2), pages 1-26, May.
    4. Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
    5. Gosavi, Abhijit & Gosavi, Aparna A., 2024. "CONWIP control in the digitized world: The case of the cyber-physical jobshop," International Journal of Production Economics, Elsevier, vol. 270(C).
    6. Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
    7. Pettersen, Jan-Arne & Segerstedt, Anders, 2009. "Restricted work-in-process: A study of differences between Kanban and CONWIP," International Journal of Production Economics, Elsevier, vol. 118(1), pages 199-207, March.
    8. van der Zee, D.J., 2006. "Modeling decision making and control in manufacturing simulation," International Journal of Production Economics, Elsevier, vol. 100(1), pages 155-167, March.
    9. Chiang, Nai-Yuan & Lin, Yiqing & Long, Quan, 2020. "Efficient propagation of uncertainties in manufacturing supply chains: Time buckets, L-leap, and multilevel Monte Carlo methods," Operations Research Perspectives, Elsevier, vol. 7(C).
    10. Onyeocha, Chukwunonyelum Emmanuel & Wang, Jiayi & Khoury, Joseph & Geraghty, John, 2015. "A comparison of HK-CONWIP and BK-CONWIP control strategies in a multi-product manufacturing system," Operations Research Perspectives, Elsevier, vol. 2(C), pages 137-149.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mary Jane Lenard & Pervaiz Alam & David Booth & Gregory Madey, 2001. "Decision‐making capabilities of a hybrid system applied to the auditor's going‐concern assessment," Intelligent Systems in Accounting, Finance and Management, John Wiley & Sons, Ltd., vol. 10(1), pages 1-23, March.
    2. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
    3. George Varlas & Michael Vidalis & Stelios Koukoumialos & Alexandros Diamantidis, 2021. "Optimal inventory control policies of a two-stage push–pull production inventory system with lost sales under stochastic production, transportation, and external demand," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(3), pages 799-832, October.
    4. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
    5. Plaza, Malgorzata & David, Iulian & Shirazi, Farid, 2018. "Management of inventory under market fluctuations the case of a Canadian high tech company," International Journal of Production Economics, Elsevier, vol. 205(C), pages 215-227.
    6. Jonsson, Patrik, 2008. "Exploring problems related to the materials planning user environment," International Journal of Production Economics, Elsevier, vol. 113(1), pages 383-400, May.
    7. Sanchez, Susan M. & Moeeni, Farhad & Sanchez, Paul J., 2006. "So many factors, so little time...Simulation experiments in the frequency domain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 149-165, September.
    8. Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
    9. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    10. Gaury, E.G.A. & Pierreval, H. & Kleijnen, J.P.C., 1998. "New species of hybrid pull systems," Discussion Paper 1998-31, Tilburg University, Center for Economic Research.
    11. Fleisch, Elgar & Tellkamp, Christian, 2005. "Inventory inaccuracy and supply chain performance: a simulation study of a retail supply chain," International Journal of Production Economics, Elsevier, vol. 95(3), pages 373-385, March.
    12. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    13. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
    14. Hirakawa, Yasuhiro, 1996. "Performance of a multistage hybrid push/pull production control system," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 129-135, June.
    15. repec:dgr:rugsom:02a42 is not listed on IDEAS
    16. Ishii, Kazuyoshi & Imori, Shigeki, 1996. "A production ordering system for two-item, two-stage, capacity-constraint production and inventory model," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 119-128, June.
    17. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    18. Oke, Adegoke & Szwejczewski, Marek, 2005. "The relationship between UK manufacturers' inventory levels and supply, internal and market factors," International Journal of Production Economics, Elsevier, vol. 93(1), pages 151-160, January.
    19. Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    20. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
    21. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:91:y:2004:i:1:p:75-90. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.