Make to Order or Make to Stock: Model and Application
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.48.2.241.255
Download full text from publisher
References listed on IDEAS
- Uday S. Karmarkar, 1987. "Lot Sizes, Lead Times and In-Process Inventories," Management Science, INFORMS, vol. 33(3), pages 409-418, March.
- W. Popp, 1965. "Simple And Combined Inventory Policies, Production to Stock or to Order?," Management Science, INFORMS, vol. 11(9), pages 868-873, July.
- Awi Federgruen & Ziv Katalan, 1999. "The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System," Management Science, INFORMS, vol. 45(7), pages 980-994, July.
- Wallace J. Hopp & Mark L. Spearman & Rachel Q. Zhang, 1997. "Easily Implementable Inventory Control Policies," Operations Research, INFORMS, vol. 45(3), pages 327-340, June.
- Carlson, Robert C. & Hodder, James E. & Jucker, James V., 1987. "Simple solution procedures for nonlinear programming problems that are derivative decomposable," European Journal of Operational Research, Elsevier, vol. 31(1), pages 118-126, July.
- S. L. Albin, 1982. "On Poisson Approximations for Superposition Arrival Processes in Queues," Management Science, INFORMS, vol. 28(2), pages 126-137, February.
- Paul H. Zipkin, 1986. "Models for Design and Control of Stochastic, Multi-Item Batch Production Systems," Operations Research, INFORMS, vol. 34(1), pages 91-104, February.
- Lode Li, 1992. "The Role of Inventory in Delivery-Time Competition," Management Science, INFORMS, vol. 38(2), pages 182-197, February.
- Charles R. Sox & L. Joseph Thomas & John O. McClain, 1997. "Coordinating Production and Inventory to Improve Service," Management Science, INFORMS, vol. 43(9), pages 1189-1197, September.
- Williams, T. M., 1984. "Special products and uncertainty in production/inventory systems," European Journal of Operational Research, Elsevier, vol. 15(1), pages 46-54, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Arreola-Risa, Antonio, 1996. "Integrated multi-item production-inventory systems," European Journal of Operational Research, Elsevier, vol. 89(2), pages 326-340, March.
- Tielemans, Peter F. J. & Kuik, Roelof, 1996. "An exploration of models that minimize leadtime through batching of arrived orders," European Journal of Operational Research, Elsevier, vol. 95(2), pages 374-389, December.
- Kuik, Roelof & Tielemans, Peter F. J., 2004. "Expected time in system analysis of a single-machine multi-item processing center," European Journal of Operational Research, Elsevier, vol. 156(2), pages 287-304, July.
- Kuik, Roelof & Tielemans, Peter F. J., 1998. "Analysis of expected queueing delays for decision making in production planning," European Journal of Operational Research, Elsevier, vol. 110(3), pages 658-681, November.
- Awi Federgruen & Ziv Katalan, 1999. "The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System," Management Science, INFORMS, vol. 45(7), pages 980-994, July.
- Soman, Chetan Anil & Donk, Dirk Pieter van & Gaalman, Gerard, 2002. "Combined make-to-order and make-to-stock in a food production system," Research Report 02A49, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
- Zhang, Zhe George & Kim, Ilhyung & Springer, Mark & Cai, Gangshu (George) & Yu, Yugang, 2013. "Dynamic pooling of make-to-stock and make-to-order operations," International Journal of Production Economics, Elsevier, vol. 144(1), pages 44-56.
- Soman, Chetan Anil & van Donk, Dirk Pieter & Gaalman, Gerard, 2004. "Combined make-to-order and make-to-stock in a food production system," International Journal of Production Economics, Elsevier, vol. 90(2), pages 223-235, July.
- Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
- repec:dgr:rugsom:02a49 is not listed on IDEAS
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
- Tang, Loon Ching & Lee, Loo Hay, 2005. "A simple recovery strategy for economic lot scheduling problem: A two-product case," International Journal of Production Economics, Elsevier, vol. 98(1), pages 97-107, October.
- Sato, Yutaro & Maeda, Hiroyuki & Toshima, Ryusei & Nagasawa, Keisuke & Morikawa, Katsumi & Takahashi, Katsuhiko, 2023. "Switching decisions in a hybrid MTS/MTO production system comprising multiple machines considering setup," International Journal of Production Economics, Elsevier, vol. 263(C).
- Ananth. V. Iyer, 2002. "Inventory cost impact of order processing priorities based on demand uncertainty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(4), pages 376-390, June.
- Ghose, Sanjoy & Liu, John J. & Bhatnagar, Amit & Kurata, Hisashi, 2005. "Modeling the role of retail price formats, and retailer competition types on production schedule strategy," European Journal of Operational Research, Elsevier, vol. 164(1), pages 173-184, July.
- Thangam, A. & Uthayakumar, R., 2008. "A two-level supply chain with partial backordering and approximated Poisson demand," European Journal of Operational Research, Elsevier, vol. 187(1), pages 228-242, May.
- Soman, Chetan Anil & Pieter van Donk, Dirk & Gaalman, Gerard, 2006. "Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand," International Journal of Production Economics, Elsevier, vol. 104(2), pages 441-453, December.
- Hau L. Lee & Kamran Moinzadeh, 1987. "Operating characteristics of a two‐echelon inventory system for repairable and consumable items under batch ordering and shipment policy," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(3), pages 365-380, June.
- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
More about this item
Keywords
Inventory/Production; Approximations/Heuristics; Multi-Item; Stochastic Batch Production System;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:48:y:2002:i:2:p:241-256. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.