IDEAS home Printed from https://ideas.repec.org/a/eee/oprepe/v6y2019ics2214716018303166.html
   My bibliography  Save this article

Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system

Author

Listed:
  • Chiu, Singa Wang
  • Wu, Cheng-Sian
  • Tseng, Chao-Tang

Abstract

Facing harsh competition in global marketplaces, management must construct the best possible supply chains to meet client requirements of quality, timely, and diverse products. To accelerate the fabrication rate can help shorten the length of the refilling cycle, and the reworking of repairable defectives can retain the requisite quality standard as well as reduce cost in production. Seeking to build an integrated fabrication-delivery model to help satisfy client timely multiproduct needs with quality goods and minimum cost, this study explores a multi-item stock refilling system incorporating an expedited rate, rework, and multiple shipments plan. An explicit mathematical model is developed to clearly represent various features of the problem. Analytical derivations are used to find the relevant cost function of the system. Applying the Hessian matrix equations to the cost function obtained from our model, the optimal length of the refilling cycle and frequency of delivery can be concurrently determined. This particular model and its analytical results reveal the individual and joint impact of various features on the problem, and can assist operational managers in determining a strategy regarding the expedited rate, controlling requisite product quality levels, and planning the most economic frequency of delivery.

Suggested Citation

  • Chiu, Singa Wang & Wu, Cheng-Sian & Tseng, Chao-Tang, 2019. "Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system," Operations Research Perspectives, Elsevier, vol. 6(C).
  • Handle: RePEc:eee:oprepe:v:6:y:2019:i:c:s2214716018303166
    DOI: 10.1016/j.orp.2019.100115
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S2214716018303166
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.orp.2019.100115?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    2. Caiazza, Rosa & Volpe, Tiziana & Stanton, John L., 2016. "Global supply chain: The consolidators’ role," Operations Research Perspectives, Elsevier, vol. 3(C), pages 1-4.
    3. Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
    4. F. J. Arcelus & G. Srinivasan, 1987. "Inventory Policies Under Various Optimizing Criteria and Variable Markup Rates," Management Science, INFORMS, vol. 33(6), pages 756-762, June.
    5. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    6. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    7. Yves Pochet & Laurence A. Wolsey, 1991. "Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes," Management Science, INFORMS, vol. 37(1), pages 53-67, January.
    8. B C Giri & T Maiti, 2012. "Supply chain model for a deteriorating product with time-varying demand and production rate," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 63(5), pages 665-673, May.
    9. Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
    10. ter Haseborg, Fokko, 1982. "On the optimality of joint ordering policies in a multi-product dynamic lot size model with individual and joint set-up costs," European Journal of Operational Research, Elsevier, vol. 9(1), pages 47-55, January.
    11. Flapper, Simme Douwe P. & Teunter, Ruud H., 2004. "Logistic planning of rework with deteriorating work-in-process," International Journal of Production Economics, Elsevier, vol. 88(1), pages 51-59, March.
    12. Alexandra IoanaFLOREA (IONESCU) & Răzvan-Andrei CORBOŞ & Ruxandra Irina POPESCU & Andreea ZAMFIR, 2016. "From The Factory Floor To The Shop Floor – Improved Supply Chain For Sustainable Competitive Advantage With Item-Level Rfid In Retail," ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, Faculty of Economic Cybernetics, Statistics and Informatics, vol. 50(4), pages 119-134.
    13. Settanni, Ettore & Harrington, Tomás Seosamh & Srai, Jagjit Singh, 2017. "Pharmaceutical supply chain models: A synthesis from a systems view of operations research," Operations Research Perspectives, Elsevier, vol. 4(C), pages 74-95.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chiu, Singa Wang & Chen, Hui-Cun & Wu, Hua-Yao & Chiu, Yuan-Shyi Peter, 2020. "A hybrid finite production rate system featuring random breakdown and rework," Operations Research Perspectives, Elsevier, vol. 7(C).
    2. Singa Wang Chiu & Liang-Wei You & Tsu-Ming Yeh & Tiffany Chiu, 2020. "The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision," Mathematics, MDPI, vol. 8(9), pages 1-18, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chiu, Yuan-Shyi Peter & Chiu, Victoria & Lin, Hong-Dar & Chang, Huei-Hsin, 2019. "Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance," Operations Research Perspectives, Elsevier, vol. 6(C).
    2. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    3. Nita H. Shah & Dushyantkumar G. Patel & Digeshkumar B. Shah, 2018. "EPQ model for returned/reworked inventories during imperfect production process under price-sensitive stock-dependent demand," Operational Research, Springer, vol. 18(2), pages 343-359, July.
    4. Kerem Akartunalı & Ioannis Fragkos & Andrew J. Miller & Tao Wu, 2016. "Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 28(4), pages 766-780, November.
    5. Robinson, Powell & Narayanan, Arunachalam & Sahin, Funda, 2009. "Coordinated deterministic dynamic demand lot-sizing problem: A review of models and algorithms," Omega, Elsevier, vol. 37(1), pages 3-15, February.
    6. Nadjib Brahimi & Tarik Aouam, 2016. "Multi-item production routing problem with backordering: a MILP approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(4), pages 1076-1093, February.
    7. Boutarfa, Y. & Senoussi, A. & Brahimi, N. & Aouam, T., 2024. "Integration and substitution in hybrid manufacturing and refurbishing systems," International Journal of Production Economics, Elsevier, vol. 274(C).
    8. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    9. Rizk, Nafee & Martel, Alain & Ramudhin, Amar, 2006. "A Lagrangean relaxation algorithm for multi-item lot-sizing problems with joint piecewise linear resource costs," International Journal of Production Economics, Elsevier, vol. 102(2), pages 344-357, August.
    10. Tao Wu, 2022. "Predictive Search for Capacitated Multi-Item Lot Sizing Problems," INFORMS Journal on Computing, INFORMS, vol. 34(1), pages 385-406, January.
    11. Narayanan, Arunachalam & Robinson, Powell, 2010. "Efficient and effective heuristics for the coordinated capacitated lot-size problem," European Journal of Operational Research, Elsevier, vol. 203(3), pages 583-592, June.
    12. Wei, Mingyuan & Qi, Mingyao & Wu, Tao & Zhang, Canrong, 2019. "Distance and matching-induced search algorithm for the multi-level lot-sizing problem with substitutable bill of materials," European Journal of Operational Research, Elsevier, vol. 277(2), pages 521-541.
    13. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
    14. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
    15. Kerem Akartunalı & Andrew Miller, 2012. "A computational analysis of lower bounds for big bucket production planning problems," Computational Optimization and Applications, Springer, vol. 53(3), pages 729-753, December.
    16. Valentini, Giovanni & Zavanella, Lucio, 2003. "The consignment stock of inventories: industrial case and performance analysis," International Journal of Production Economics, Elsevier, vol. 81(1), pages 215-224, January.
    17. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
    18. Donghui Yang & Yan Wang & Shue Mei, 2021. "How to balance online healthcare platforms and offline systems? A supply chain management perspective," Managerial and Decision Economics, John Wiley & Sons, Ltd., vol. 42(2), pages 502-515, March.
    19. Padilla Tinoco, Silvia Valeria & Creemers, Stefan & Boute, Robert N., 2017. "Collaborative shipping under different cost-sharing agreements," European Journal of Operational Research, Elsevier, vol. 263(3), pages 827-837.
    20. Jenny Carolina Saldana Cortés, 2011. "Programación semidefinida aplicada a problemas de cantidad económica de pedido," Documentos CEDE 8735, Universidad de los Andes, Facultad de Economía, CEDE.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:oprepe:v:6:y:2019:i:c:s2214716018303166. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/operations-research-perspectives .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.