IDEAS home Printed from https://ideas.repec.org/a/eee/oprepe/v7y2020ics2214716019301897.html
   My bibliography  Save this article

A hybrid finite production rate system featuring random breakdown and rework

Author

Listed:
  • Chiu, Singa Wang
  • Chen, Hui-Cun
  • Wu, Hua-Yao
  • Chiu, Yuan-Shyi Peter

Abstract

To reduce the order response time or achieve optimal utilization, manufacturers often include an outsourcing alternative in their production plans. Further, undesirable machine breakdowns and nonconforming items produced during the in-house processes must also be effectively managed/corrected to adhere to the fabrication schedules and meet the desired quality level. This study addresses the aforementioned concerns by examining a hybrid finite production rate (FPR) system featuring: breakdown that follows the Poisson distribution, and rework/repair of all the nonconforming goods produced. A portion of the batch size is outsourced to an external supplier, who guarantees quality but at a higher unit cost than that incurred in-house. A mathematical model is explicitly built to represent the features of the proposed hybrid FPR system. We use the optimization approach and an algorithm to determine the optimal replenishing runtime that minimizes total costs; results are demonstrated through a numerical example and sensitivity analyses. Diverse crucial system information available to assist manufacturers in production planning includes the individual and joint influence of rework, outsourcing, and breakdown on: (a) variable rework cost; (b) the optimal runtime; (c) total system cost; (d) utilization; (e) detail of system's cost elements; and (f) other important system parameters.

Suggested Citation

  • Chiu, Singa Wang & Chen, Hui-Cun & Wu, Hua-Yao & Chiu, Yuan-Shyi Peter, 2020. "A hybrid finite production rate system featuring random breakdown and rework," Operations Research Perspectives, Elsevier, vol. 7(C).
  • Handle: RePEc:eee:oprepe:v:7:y:2020:i:c:s2214716019301897
    DOI: 10.1016/j.orp.2020.100142
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S2214716019301897
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.orp.2020.100142?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yossef Spiegel, 1993. "Horizontal Subcontracting," RAND Journal of Economics, The RAND Corporation, vol. 24(4), pages 570-590, Winter.
    2. Keith Skowronski & W.C. Benton, 2018. "The Influence of Intellectual Property Rights on Poaching in Manufacturing Outsourcing," Production and Operations Management, Production and Operations Management Society, vol. 27(3), pages 531-552, March.
    3. Chiu, Singa Wang & Liang, Gang-Ming & Chiu, Yuan-Shyi Peter & Chiu, Tiffany, 2019. "Production planning incorporating issues of reliability and backlogging with service level constraint," Operations Research Perspectives, Elsevier, vol. 6(C).
    4. Mohammad Mohammadi, 2017. "The Tradeoff between Outsourcing and Using More Factories in a Distributed Flow Shop System," ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, Faculty of Economic Cybernetics, Statistics and Informatics, vol. 51(4), pages 279-295.
    5. Herbert Hamers & Flip Klijn & Marco Slikker, 2019. "Implementation of optimal schedules in outsourcing with identical suppliers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 89(2), pages 173-187, April.
    6. Gan, Shu-San & Pujawan, I Nyoman & Suparno, & Widodo, Basuki, 2018. "Pricing decisions for short life-cycle product in a closed-loop supply chain with random yield and random demands," Operations Research Perspectives, Elsevier, vol. 5(C), pages 174-190.
    7. Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji, 2001. "Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 147-155, December.
    8. Zhang, Bin & Du, Shaofu, 2010. "Multi-product newsboy problem with limited capacity and outsourcing," European Journal of Operational Research, Elsevier, vol. 202(1), pages 107-113, April.
    9. Abdel-Malek, Layek & Asadathorn, Nutthapol, 1996. "An analytical approach to process planning with rework option," International Journal of Production Economics, Elsevier, vol. 46(1), pages 511-520, December.
    10. Saari, Juhamatti & Odelius, Johan, 2018. "Detecting operation regimes using unsupervised clustering with infected group labelling to improve machine diagnostics and prognostics," Operations Research Perspectives, Elsevier, vol. 5(C), pages 232-244.
    11. Chiu, Singa Wang & Wu, Cheng-Sian & Tseng, Chao-Tang, 2019. "Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system," Operations Research Perspectives, Elsevier, vol. 6(C).
    12. Brojeswar Pal & Shib Sana & Kripasindhu Chaudhuri, 2013. "Maximising profits for an EPQ model with unreliable machine and rework of random defective items," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(3), pages 582-594.
    13. Candace A. Yano & Elizabeth J. Durango-Cohen & Liad Wagman, 2017. "Outsourcing in place: Should a retailer sell its store-brand factory?," IISE Transactions, Taylor & Francis Journals, vol. 49(4), pages 442-459, April.
    14. Anatoly Nazarov & János Sztrik & Anna Kvach & Tamás Bérczes, 2019. "Asymptotic analysis of finite-source M/M/1 retrial queueing system with collisions and server subject to breakdowns and repairs," Annals of Operations Research, Springer, vol. 277(2), pages 213-229, June.
    15. Chiu, Yuan-Shyi Peter & Chiu, Victoria & Lin, Hong-Dar & Chang, Huei-Hsin, 2019. "Meeting multiproduct demand with a hybrid inventory replenishment system featuring quality reassurance," Operations Research Perspectives, Elsevier, vol. 6(C).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Yuan-Shyi Peter Chiu & Victoria Chiu & Tsu-Ming Yeh & Hua-Yao Wu, 2020. "Incorporating Outsourcing Strategy and Quality Assurance into a Multiproduct Manufacturer–Retailer Coordination Replenishing Decision," Mathematics, MDPI, vol. 8(12), pages 1-19, December.
    2. Mofidi, Seyed Shahab & Pazour, Jennifer A. & Roy, Debjit, 2018. "Proactive vs. reactive order-fulfillment resource allocation for sea-based logistics," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 66-84.
    3. Yutian Chen, 2010. "Strategic Outsourcing between Rivals," Annals of Economics and Finance, Society for AEF, vol. 11(2), pages 301-311, November.
    4. Gunasekaran, Angappa & Irani, Zahir & Choy, King-Lun & Filippi, Lionel & Papadopoulos, Thanos, 2015. "Performance measures and metrics in outsourcing decisions: A review for research and applications," International Journal of Production Economics, Elsevier, vol. 161(C), pages 153-166.
    5. Mukunda Choudhury & Sujit Kumar De & Gour Chandra Mahata, 2023. "A pollution-sensitive multistage production-inventory model for deteriorating items considering expiration date under Stackelberg game approach," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 25(10), pages 11847-11884, October.
    6. Zhang, Bin, 2012. "Multi-tier binary solution method for multi-product newsvendor problem with multiple constraints," European Journal of Operational Research, Elsevier, vol. 218(2), pages 426-434.
    7. Singa Wang Chiu & Liang-Wei You & Tsu-Ming Yeh & Tiffany Chiu, 2020. "The Collective Influence of Component Commonality, Adjustable-Rate, Postponement, and Rework on Multi-Item Manufacturing Decision," Mathematics, MDPI, vol. 8(9), pages 1-18, September.
    8. M. Jaber & Z. Givi, 2015. "Imperfect production process with learning and forgetting effects," Computational Management Science, Springer, vol. 12(1), pages 129-152, January.
    9. Niu, Baozhuang & Xu, Jingwen & Lee, Carman K.M. & Chen, Lei, 2019. "Order timing and tax planning when selling to a rival in a low-tax emerging market," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 123(C), pages 165-179.
    10. Marziyeh Karimi & Amir Hossein Niknamfar & Seyed Hamid Reza Pasandideh, 2017. "Two-stage single period inventory management for a manufacturing vendor under green-supplier supply chain," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(4), pages 704-718, December.
    11. Dachs, Bernhard & Kinkel, Steffen & Jäger, Angela, 2019. "Bringing it all back home? Backshoring of manufacturing activities and the adoption of Industry 4.0 technologies," Journal of World Business, Elsevier, vol. 54(6), pages 1-1.
    12. Pinar Keskinocak & Seçil Savaşaneril, 2008. "Collaborative procurement among competing buyers," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(6), pages 516-540, September.
    13. Wei, Liqun & Zhang, Jianxiong, 2021. "Strategic substitutes or complements? The relationship between capacity sharing and postponement flexibility," European Journal of Operational Research, Elsevier, vol. 294(1), pages 138-148.
    14. B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
    15. Hunold, Matthias & Muthers, Johannes, 2019. "Spatial competition and price discrimination with capacity constraints," International Journal of Industrial Organization, Elsevier, vol. 67(C).
    16. Walter Elberfeld, 2001. "Explaining Intraindustry Differences in the Extent of Vertical Integration," Journal of Institutional and Theoretical Economics (JITE), Mohr Siebeck, Tübingen, vol. 157(3), pages 465-477, September.
    17. Yang, Cheng-Hu & Wang, Hai-Tang & Ma, Xin & Talluri, Srinivas, 2023. "A data-driven newsvendor problem: A high-dimensional and mixed-frequency method," International Journal of Production Economics, Elsevier, vol. 266(C).
    18. Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
    19. Laura Rondi & Paola Valbonesi, 2017. "Pre- and post-award outsourcing: Temporary partnership versus subcontracting in public procurement," "Marco Fanno" Working Papers 0211, Dipartimento di Scienze Economiche "Marco Fanno".
    20. Reimann, Marc, 2011. "Speculative production and anticipative reservation of reactive capacity by a multi-product newsvendor," European Journal of Operational Research, Elsevier, vol. 211(1), pages 35-46, May.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:oprepe:v:7:y:2020:i:c:s2214716019301897. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.journals.elsevier.com/operations-research-perspectives .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.