Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance
Author
Abstract
Suggested Citation
DOI: 10.1080/13873954.2010.511199
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jamal, A. M. M. & Sarker, Bhaba R., 1993. "An optimal batch size for a production system operating under a just-in-time delivery system," International Journal of Production Economics, Elsevier, vol. 32(2), pages 255-260, September.
- Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
- Siajadi, Hans & Ibrahim, Raafat N. & Lochert, Paul B., 2006. "Joint economic lot size in distribution system with multiple shipment policy," International Journal of Production Economics, Elsevier, vol. 102(2), pages 302-316, August.
- Agnihothri, Saligrama R. & Kenett, Ron S., 1995. "The impact of defects on a process with rework," European Journal of Operational Research, Elsevier, vol. 80(2), pages 308-327, January.
- M. Berg & M. J. M. Posner & H. Zhao, 1994. "Production-Inventory Systems with Unreliable Machines," Operations Research, INFORMS, vol. 42(1), pages 111-118, February.
- Liu, John J. & Yang, Ping, 1996. "Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs," European Journal of Operational Research, Elsevier, vol. 91(3), pages 517-527, June.
- T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
- Yang, P. C. & Wee, H. M., 2002. "A single-vendor and multiple-buyers production-inventory policy for a deteriorating item," European Journal of Operational Research, Elsevier, vol. 143(3), pages 570-581, December.
- Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
- Abraham Grosfeld-Nir & Yigal Gerchak, 2002. "Multistage Production to Order with Rework Capability," Management Science, INFORMS, vol. 48(5), pages 652-664, May.
- Khouja, Moutaz, 2003. "Optimizing inventory decisions in a multi-stage multi-customer supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 39(3), pages 193-208, May.
- Singa Wang Chiu, 2008. "An optimization problem of manufacturing systems with stochastic machine breakdown and rework process," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 24(3), pages 203-219, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Gerardo Treviño-Garza & Krystel K. Castillo-Villar & Leopoldo Eduardo Cárdenas-Barrón, 2015. "Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(9), pages 1705-1716, July.
- Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
- Chiu, Singa Wang & Wu, Cheng-Sian & Tseng, Chao-Tang, 2019. "Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system," Operations Research Perspectives, Elsevier, vol. 6(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
- Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
- Chung, Chun-Jen & Wee, Hui-Ming, 2008. "Green-component life-cycle value on design and reverse manufacturing in semi-closed supply chain," International Journal of Production Economics, Elsevier, vol. 113(2), pages 528-545, June.
- Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
- Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
- Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
- Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
- Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
- Muhammad Waqas Iqbal & Muhammad Babar Ramzan & Asif Iqbal Malik, 2022. "Food Preservation within Multi-Echelon Supply Chain Considering Single Setup and Multi-Deliveries of Unequal Lot Size," Sustainability, MDPI, vol. 14(11), pages 1-30, June.
- Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
- Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
- Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
- Goyal, Suresh Kumar & Chang, Chun-Tao, 2009. "Optimal ordering and transfer policy for an inventory with stock dependent demand," European Journal of Operational Research, Elsevier, vol. 196(1), pages 177-185, July.
- Süleyman Demirel & Roman Kapuscinski & Man Yu, 2018. "Strategic Behavior of Suppliers in the Face of Production Disruptions," Management Science, INFORMS, vol. 64(2), pages 533-551, February.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Chen, Tsung-Hui & Tsao, Yu-Chung, 2014. "Optimal lot-sizing integration policy under learning and rework effects in a manufacturer–retailer chain," International Journal of Production Economics, Elsevier, vol. 155(C), pages 239-248.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:nmcmxx:v:16:y:2010:i:4:p:373-388. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/NMCM20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.