IDEAS home Printed from https://ideas.repec.org/a/spr/annopr/v286y2020i1d10.1007_s10479-017-2650-9.html
   My bibliography  Save this article

A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints

Author

Listed:
  • Amir Hossein Nobil

    (Islamic Azad University)

  • Amir Hosein Afshar Sedigh

    (University of Otago)

  • Leopoldo Eduardo Cárdenas-Barrón

    (Tecnológico de Monterrey)

Abstract

This paper develops a multiproduct economic production quantity inventory model for a vendor–buyer system in which several products are manufactured on a single machine. The vendor delivers the products to customer in small batches. The number of orders must be a discrete value. Moreover, benefitting from a just-in-time policy, the buyer decides the size of the delivered batches. Due to the fact that several products are manufactured on one machine, this makes that the production capacity be considered as a constraint. The aim of this study is to determine the optimal cycle length and the number of delivered batches for each product so that the total inventory cost is minimized. The problem under study is modeled as a mixed integer nonlinear programing problem considering maximum number of orders, capacity and budget constraints. Three different methods are developed and employed to solve this problem: an exact method, a heuristic algorithm and a hybrid genetic algorithm. Based on the results, the three algorithms have near efficiency with different running times. The results shows that the heuristic algorithm obtains a good solution in a short time and the hybrid genetic algorithm finds solutions with higher quality in an acceptable time. Finally, a sensitivity analysis is done to evaluate the effect of changes in the parameters of problem.

Suggested Citation

  • Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
  • Handle: RePEc:spr:annopr:v:286:y:2020:i:1:d:10.1007_s10479-017-2650-9
    DOI: 10.1007/s10479-017-2650-9
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10479-017-2650-9
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10479-017-2650-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Donald Erlenkotter, 1989. "Note---An Early Classic Misplaced: Ford W. Harris's Economic Order Quantity Model of 1915," Management Science, INFORMS, vol. 35(7), pages 898-900, July.
    2. Cardenas-Barron, Leopoldo Eduardo, 2001. "The economic production quantity (EPQ) with shortage derived algebraically," International Journal of Production Economics, Elsevier, vol. 70(3), pages 289-292, April.
    3. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    4. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2012. "A three layer multi-item production–inventory model for multiple suppliers and retailers," Economic Modelling, Elsevier, vol. 29(6), pages 2704-2710.
    5. Kenneth R. Baker, 1970. "Note--On Madigan's Approach to the Deterministic Multi-Product Production and Inventory Problem," Management Science, INFORMS, vol. 16(9), pages 636-638, May.
    6. Pal, S. & Goswami, A. & Chaudhuri, K. S., 1993. "A deterministic inventory model for deteriorating items with stock-dependent demand rate," International Journal of Production Economics, Elsevier, vol. 32(3), pages 291-299, November.
    7. Sujit De & Shib Sana, 2015. "Backlogging EOQ model for promotional effort and selling price sensitive demand- an intuitionistic fuzzy approach," Annals of Operations Research, Springer, vol. 233(1), pages 57-76, October.
    8. Biswajit Sarkar & Sharmila Saren & Leopoldo Cárdenas-Barrón, 2015. "An inventory model with trade-credit policy and variable deterioration for fixed lifetime products," Annals of Operations Research, Springer, vol. 229(1), pages 677-702, June.
    9. Donald Erlenkotter, 1990. "Ford Whitman Harris and the Economic Order Quantity Model," Operations Research, INFORMS, vol. 38(6), pages 937-946, December.
    10. Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
    11. Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
    12. Ata Allah Taleizadeh & Seyed Jafar Sadjadi & Seyed Taghi Akhavan Niaki, 2011. "Multiproduct EPQ model with single machine, backordering and immediate rework process," European Journal of Industrial Engineering, Inderscience Enterprises Ltd, vol. 5(4), pages 388-411.
    13. Pasandideh, Seyed Hamid Reza & Niaki, Seyed Taghi Akhavan & Nobil, Amir Hossein & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost," International Journal of Production Economics, Elsevier, vol. 169(C), pages 203-214.
    14. Wee, Hui Ming & Widyadana, Gede Agus, 2013. "Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales," International Journal of Production Economics, Elsevier, vol. 143(2), pages 574-579.
    15. Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
    16. Mark Daskin & Collette Coullard & Zuo-Jun Shen, 2002. "An Inventory-Location Model: Formulation, Solution Algorithm and Computational Results," Annals of Operations Research, Springer, vol. 110(1), pages 83-106, February.
    17. H. Wang & H. Pham, 1999. "Some maintenance models and availability withimperfect maintenance in production systems," Annals of Operations Research, Springer, vol. 91(0), pages 305-318, January.
    18. Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
    19. Jiafu Tang & Kai-Leung Yung & Iko Kaku & Jianbo Yang, 2008. "The scheduling of deliveries in a production-distribution system with multiple buyers," Annals of Operations Research, Springer, vol. 161(1), pages 5-23, July.
    20. Brojeswar Pal & Shib Sana & Kripasindhu Chaudhuri, 2013. "Maximising profits for an EPQ model with unreliable machine and rework of random defective items," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(3), pages 582-594.
    21. Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
    22. Yuan-Shyi Peter Chiu & Chih-An Katherine Lin & Huei-Hsin Chang & Victoria Chiu, 2010. "Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 16(4), pages 373-388, July.
    23. Seyed Mohsen Mousavi & Ardeshir Bahreininejad & S. Nurmaya Musa & Farazila Yusof, 2017. "A modified particle swarm optimization for solving the integrated location and inventory control problems in a two-echelon supply chain network," Journal of Intelligent Manufacturing, Springer, vol. 28(1), pages 191-206, January.
    24. Jack Rogers, 1958. "A Computational Approach to the Economic Lot Scheduling Problem," Management Science, INFORMS, vol. 4(3), pages 264-291, April.
    25. Erlenkotter, Donald, 2014. "Ford Whitman Harris's economical lot size model," International Journal of Production Economics, Elsevier, vol. 155(C), pages 12-15.
    26. C. Loren Doll & D. Clay Whybark, 1973. "An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem," Management Science, INFORMS, vol. 20(1), pages 50-55, September.
    27. Yu-Chung Tsao, 2015. "A piecewise nonlinear optimization for a production-inventory model under maintenance, variable setup costs, and trade credits," Annals of Operations Research, Springer, vol. 233(1), pages 465-481, October.
    28. Jinn-Tsair Teng & Leopoldo Cárdenas-Barrón & Kuo-Ren Lou & Hui Wee, 2013. "Optimal economic order quantity for buyer–distributor–vendor supply chain with backlogging derived without derivatives," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(5), pages 986-994.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gerardo Treviño-Garza & Krystel K. Castillo-Villar & Leopoldo Eduardo Cárdenas-Barrón, 2015. "Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(9), pages 1705-1716, July.
    2. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    3. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Behrouz Afshar-Nadjafi, 2020. "Lot-sizing problem for a defective processing system with categorized items, backordering and pricing policy," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(4), pages 255-265, August.
    4. S. Ganesan & R. Uthayakumar, 2023. "An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1121-1152, September.
    5. Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
    6. Holmbom, Martin & Segerstedt, Anders, 2014. "Economic Order Quantities in production: From Harris to Economic Lot Scheduling Problems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 82-90.
    7. Erlenkotter, Donald, 2014. "Ford Whitman Harris's economical lot size model," International Journal of Production Economics, Elsevier, vol. 155(C), pages 12-15.
    8. Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
    9. Ashoke Kumar Bera & Dipak Kumar Jana, 2017. "Multi-item imperfect production inventory model in Bi-fuzzy environments," OPSEARCH, Springer;Operational Research Society of India, vol. 54(2), pages 260-282, June.
    10. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    11. Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
    12. Naoufel Cheikhrouhou & Biswajit Sarkar & Baishakhi Ganguly & Asif Iqbal Malik & Rafael Batista & Young Hae Lee, 2018. "Optimization of sample size and order size in an inventory model with quality inspection and return of defective items," Annals of Operations Research, Springer, vol. 271(2), pages 445-467, December.
    13. Chiu, Singa Wang & Wu, Cheng-Sian & Tseng, Chao-Tang, 2019. "Incorporating an expedited rate, rework, and a multi-shipment policy into a multi-item stock refilling system," Operations Research Perspectives, Elsevier, vol. 6(C).
    14. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    15. Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
    16. Andriolo, Alessandro & Battini, Daria & Grubbström, Robert W. & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A century of evolution from Harris׳s basic lot size model: Survey and research agenda," International Journal of Production Economics, Elsevier, vol. 155(C), pages 16-38.
    17. Rung-Hung Su & Ming-Wei Weng & Yung-Fu Huang, 2020. "Innovative maintenance problem in a two-stage production-inventory system with imperfect processes," Annals of Operations Research, Springer, vol. 287(1), pages 379-401, April.
    18. Salvietti, Luciano & Smith, Neale R., 2008. "A profit-maximizing economic lot scheduling problem with price optimization," European Journal of Operational Research, Elsevier, vol. 184(3), pages 900-914, February.
    19. Pasandideh, Seyed Hamid Reza & Niaki, Seyed Taghi Akhavan & Nobil, Amir Hossein & Cárdenas-Barrón, Leopoldo Eduardo, 2015. "A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost," International Journal of Production Economics, Elsevier, vol. 169(C), pages 203-214.
    20. Wagner, Bret J. & Davis, Darwin J., 2002. "A search heuristic for the sequence-dependent economic lot scheduling problem," European Journal of Operational Research, Elsevier, vol. 141(1), pages 133-146, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:286:y:2020:i:1:d:10.1007_s10479-017-2650-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.