Negotiation mechanisms for an order subcontracting and scheduling problem
Author
Abstract
Suggested Citation
DOI: 10.1016/j.omega.2017.06.005
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wang, Xiuli & Zhu, Qianqian & Cheng, T.C.E., 2015. "Subcontracting price schemes for order acceptance and scheduling," Omega, Elsevier, vol. 54(C), pages 1-10.
- Dudek, Gregor & Stadtler, Hartmut, 2005. "Negotiation-based collaborative planning between supply chains partners," European Journal of Operational Research, Elsevier, vol. 163(3), pages 668-687, June.
- Heydenreich, B. & Müller, R.J. & Uetz, M.J., 2006. "Games and mechanism design in machine scheduling - an introduction," Research Memorandum 022, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Reaidy, Jihad & Massotte, Pierre & Diep, Daniel, 2006. "Comparison of negotiation protocols in dynamic agent-based manufacturing systems," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 117-130, February.
- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- Esmaeilbeigi, Rasul & Charkhgard, Parisa & Charkhgard, Hadi, 2016. "Order acceptance and scheduling problems in two-machine flow shops: New mixed integer programming formulations," European Journal of Operational Research, Elsevier, vol. 251(2), pages 419-431.
- Cai, Xiaoqiang & Chen, Jian & Xiao, Yongbo & Xu, Xiaolin & Yu, Gang, 2013. "Fresh-product supply chain management with logistics outsourcing," Omega, Elsevier, vol. 41(4), pages 752-765.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- Martin A. Lariviere & Evan L. Porteus, 2001. "Selling to the Newsvendor: An Analysis of Price-Only Contracts," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 293-305, May.
- Xiuli Wang & Guodong Huang & Xiuwu Hu & T C Edwin Cheng, 2015. "Order acceptance and scheduling on two identical parallel machines," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(10), pages 1755-1767, October.
- Yossi Bukchin & Eran Hanany, 2007. "Decentralization Cost in Scheduling: A Game-Theoretic Approach," Manufacturing & Service Operations Management, INFORMS, vol. 9(3), pages 263-275, October.
- Wellman, Michael P. & Walsh, William E. & Wurman, Peter R. & MacKie-Mason, Jeffrey K., 2001. "Auction Protocols for Decentralized Scheduling," Games and Economic Behavior, Elsevier, vol. 35(1-2), pages 271-303, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wang, Chao & Lim, Ming K & Zhao, Longfeng & Tseng, Ming-Lang & Chien, Chen-Fu & Lev, Benjamin, 2020. "The evolution of Omega-The International Journal of Management Science over the past 40 years: A bibliometric overview," Omega, Elsevier, vol. 93(C).
- Mohammadali S. Monfared & Sayyed Ehsan Monabbati & Mahsa Mahdipour Azar, 2020. "Bi-objective optimization problems with two decision makers: refining Pareto-optimal front for equilibrium solution," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 567-584, June.
- Basu, Arnab & Jain, Tarun & Hazra, Jishnu, 2018. "Supplier selection under production learning and process improvements," International Journal of Production Economics, Elsevier, vol. 204(C), pages 411-420.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wang, Xiuli & Zhu, Qianqian & Cheng, T.C.E., 2015. "Subcontracting price schemes for order acceptance and scheduling," Omega, Elsevier, vol. 54(C), pages 1-10.
- Tarhan, İstenç & Oğuz, Ceyda, 2022. "A matheuristic for the generalized order acceptance and scheduling problem," European Journal of Operational Research, Elsevier, vol. 299(1), pages 87-103.
- Shih-Hsin Chen & Yeong-Cheng Liou & Yi-Hui Chen & Kun-Ching Wang, 2019. "Order Acceptance and Scheduling Problem with Carbon Emission Reduction and Electricity Tariffs on a Single Machine," Sustainability, MDPI, vol. 11(19), pages 1-16, September.
- Li, Xin & Ventura, Jose A., 2020. "Exact algorithms for a joint order acceptance and scheduling problem," International Journal of Production Economics, Elsevier, vol. 223(C).
- Perea, Federico & Yepes-Borrero, Juan C. & Menezes, Mozart B.C., 2023. "Acceptance Ordering Scheduling Problem: The impact of an order-portfolio on a make-to-order firm’s profitability," International Journal of Production Economics, Elsevier, vol. 264(C).
- R. Micale & C. M. La Fata & M. Enea & G. La Scalia, 2021. "Regenerative scheduling problem in engineer to order manufacturing: an economic assessment," Journal of Intelligent Manufacturing, Springer, vol. 32(7), pages 1913-1925, October.
- Wang, Xiuli & Cheng, T.C.E., 2015. "A heuristic for scheduling jobs on two identical parallel machines with a machine availability constraint," International Journal of Production Economics, Elsevier, vol. 161(C), pages 74-82.
- Zhong, Xueling & Ou, Jinwen & Wang, Guoqing, 2014. "Order acceptance and scheduling with machine availability constraints," European Journal of Operational Research, Elsevier, vol. 232(3), pages 435-441.
- Wang, Xiuli & Xie, Xingzi & Cheng, T.C.E., 2013. "Order acceptance and scheduling in a two-machine flowshop," International Journal of Production Economics, Elsevier, vol. 141(1), pages 366-376.
- Chun-Lung Chen, 2023. "An Iterated Population-Based Metaheuristic for Order Acceptance and Scheduling in Unrelated Parallel Machines with Several Practical Constraints," Mathematics, MDPI, vol. 11(6), pages 1-14, March.
- Xin Li & José A. Ventura & Kevin A. Bunn, 2021. "A joint order acceptance and scheduling problem with earliness and tardiness penalties considering overtime," Journal of Scheduling, Springer, vol. 24(1), pages 49-68, February.
- Belleh Fontem & Megan Price, 2021. "Joint client selection and contract design for a risk-averse commodity broker in a two-echelon supply chain," Annals of Operations Research, Springer, vol. 307(1), pages 111-138, December.
- Simon Thevenin & Nicolas Zufferey & Marino Widmer, 2016. "Order acceptance and scheduling with earliness and tardiness penalties," Journal of Heuristics, Springer, vol. 22(6), pages 849-890, December.
- Lei He & Mathijs Weerdt & Neil Yorke-Smith, 2020. "Time/sequence-dependent scheduling: the design and evaluation of a general purpose tabu-based adaptive large neighbourhood search algorithm," Journal of Intelligent Manufacturing, Springer, vol. 31(4), pages 1051-1078, April.
- Hanane Krim & Nicolas Zufferey & Jean-Yves Potvin & Rachid Benmansour & David Duvivier, 2022. "Tabu search for a parallel-machine scheduling problem with periodic maintenance, job rejection and weighted sum of completion times," Journal of Scheduling, Springer, vol. 25(1), pages 89-105, February.
- Wu, Qing & Mu, Yinping & Feng, Yi, 2015. "Coordinating contracts for fresh product outsourcing logistics channels with power structures," International Journal of Production Economics, Elsevier, vol. 160(C), pages 94-105.
- Mobini, Zahra & van den Heuvel, Wilco & Wagelmans, Albert, 2019.
"Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information,"
European Journal of Operational Research, Elsevier, vol. 277(2), pages 542-560.
- Mobini, Z. & van den Heuvel, W. & Wagelmans, A.P.M., 2014. "Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information," Econometric Institute Research Papers EI2014-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Jorge E. Hernández & Josefa Mula & Raúl Poler & Andrew C. Lyons, 2014. "Collaborative Planning in Multi-tier Supply Chains Supported by a Negotiation-Based Mechanism and Multi-agent System," Group Decision and Negotiation, Springer, vol. 23(2), pages 235-269, March.
- Herbert Hamers & Flip Klijn & Marco Slikker, 2013. "Price of Anarchy in Sequencing Situations and the Impossibility to Coordinate," Working Papers 709, Barcelona School of Economics.
- Xiao, Yiyong & Yuan, Yingying & Zhang, Ren-Qian & Konak, Abdullah, 2015. "Non-permutation flow shop scheduling with order acceptance and weighted tardiness," Applied Mathematics and Computation, Elsevier, vol. 270(C), pages 312-333.
More about this item
Keywords
Negotiation mechanisms; Subcontracting; Scheduling; Performance bound;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:77:y:2018:i:c:p:154-167. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.