IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v269y2018i1p227-243.html
   My bibliography  Save this article

Water-integrated scheduling of batch process plants: Modelling approach and application in technology selection

Author

Listed:
  • Pulluru, Sai Jishna
  • Akkerman, Renzo

Abstract

Efficient water management is becoming increasingly important in production systems, but companies often do not have any concrete strategies to implement. While there are numerous technological options for improving water efficiency in process plants, there is a lack of effective decision support to integrate water aspects in operational decision making. This paper is based on the premise that inclusion of water reuse and related technological decisions during scheduling of production operations is essential for reduction of industrial water consumption. We develop a water-integrated scheduling approach based on mathematical programming to capture the main characteristics of water flows in batch process plants. We model water quality with a practical and generic classification scheme to effectively include water reuse and treatment possibilities. The approach is able to quantify tradeoffs between production efficiency and water efficiency. We also illustrate the use of our approach in the evaluation of water reuse and regeneration technologies for typical process industry settings. Overall, our approach is able to integrate water reuse and regeneration in a relatively efficient manner, and can help reduce industrial water consumption in process industries.

Suggested Citation

  • Pulluru, Sai Jishna & Akkerman, Renzo, 2018. "Water-integrated scheduling of batch process plants: Modelling approach and application in technology selection," European Journal of Operational Research, Elsevier, vol. 269(1), pages 227-243.
  • Handle: RePEc:eee:ejores:v:269:y:2018:i:1:p:227-243
    DOI: 10.1016/j.ejor.2017.07.009
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377221717306367
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ejor.2017.07.009?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Christodoulos Floudas & Xiaoxia Lin, 2005. "Mixed Integer Linear Programming in Process Scheduling: Modeling, Algorithms, and Applications," Annals of Operations Research, Springer, vol. 139(1), pages 131-162, October.
    2. Stefansson, Hlynur & Sigmarsdottir, Sigrun & Jensson, Pall & Shah, Nilay, 2011. "Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry," European Journal of Operational Research, Elsevier, vol. 215(2), pages 383-392, December.
    3. Julien, Benoit, 1994. "Water quality management with imprecise information," European Journal of Operational Research, Elsevier, vol. 76(1), pages 15-27, July.
    4. Sadiq, Rehan & Tesfamariam, Solomon, 2007. "Probability density functions based weights for ordered weighted averaging (OWA) operators: An example of water quality indices," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1350-1368, November.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Raja Awais Liaqait & Shermeen Hamid & Salman Sagheer Warsi & Azfar Khalid, 2021. "A Critical Analysis of Job Shop Scheduling in Context of Industry 4.0," Sustainability, MDPI, vol. 13(14), pages 1-19, July.
    2. Casey Chung & Milind Dawande & Divakar Rajamani & Chelliah Sriskandarajah, 2011. "A Short-Range Scheduling Model for Blockbuster's Order-Processing Operation," Interfaces, INFORMS, vol. 41(5), pages 466-484, October.
    3. Manuel E. SANSALVADOR & José M. BROTONS, 2017. "The Application of OWAs in Expertise Processes: The Development of a Model for the Quantification of Hidden Quality Costs," ECONOMIC COMPUTATION AND ECONOMIC CYBERNETICS STUDIES AND RESEARCH, Faculty of Economic Cybernetics, Statistics and Informatics, vol. 51(3), pages 73-90.
    4. Zhang, Y.M. & Lu, H.W. & Nie, X.H. & He, L. & Du, P., 2014. "An interactive inexact fuzzy bounded programming approach for agricultural water quality management," Agricultural Water Management, Elsevier, vol. 133(C), pages 104-111.
    5. Lara, Cristiana L. & Koenemann, Jochen & Nie, Yisu & de Souza, Cid C., 2023. "Scalable timing-aware network design via lagrangian decomposition," European Journal of Operational Research, Elsevier, vol. 309(1), pages 152-169.
    6. Yanina Fumero & Gabriela Corsano & Jorge Montagna, 2012. "Planning and scheduling of multistage multiproduct batch plants operating under production campaigns," Annals of Operations Research, Springer, vol. 199(1), pages 249-268, October.
    7. Ioannis Fragkos & Bert De Reyck, 2016. "Improving the Maritime Transshipment Operations of the Noble Group," Interfaces, INFORMS, vol. 46(3), pages 203-217, April.
    8. Chung, S.H. & Lau, H.C.W. & Choy, K.L. & Ho, G.T.S. & Tse, Y.K., 2010. "Application of genetic approach for advanced planning in multi-factory environment," International Journal of Production Economics, Elsevier, vol. 127(2), pages 300-308, October.
    9. Leachman, Robert C. & Johnston, Lenrick & Li, Shan & Shen, Zuo-Jun, 2014. "An automated planning engine for biopharmaceutical production," European Journal of Operational Research, Elsevier, vol. 238(1), pages 327-338.
    10. Cummings, Thomas & Adamson, Richard & Sugden, Andrew & Willis, Mark J., 2017. "Retrospective and predictive optimal scheduling of nitrogen liquefier units and the effect of renewable generation," Applied Energy, Elsevier, vol. 208(C), pages 158-170.
    11. M Tavana & M A Sodenkamp, 2010. "A fuzzy multi-criteria decision analysis model for advanced technology assessment at Kennedy Space Center," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(10), pages 1459-1470, October.
    12. Weidong Li & Olli-Pekka Hilmola & Yulia Panova, 2019. "Container Sea Ports and Dry Ports: Future CO 2 Emission Reduction Potential in China," Sustainability, MDPI, vol. 11(6), pages 1-21, March.
    13. Mustafa, Faizan E & Ahmed, Ijaz & Basit, Abdul & Alvi, Um-E-Habiba & Malik, Saddam Hussain & Mahmood, Atif & Ali, Paghunda Roheela, 2023. "A review on effective alarm management systems for industrial process control: Barriers and opportunities," International Journal of Critical Infrastructure Protection, Elsevier, vol. 41(C).
    14. Voll, Philip & Jennings, Mark & Hennen, Maike & Shah, Nilay & Bardow, André, 2015. "The optimum is not enough: A near-optimal solution paradigm for energy systems synthesis," Energy, Elsevier, vol. 82(C), pages 446-456.
    15. Farahmand, H. & Doorman, G.L., 2012. "Balancing market integration in the Northern European continent," Applied Energy, Elsevier, vol. 96(C), pages 316-326.
    16. Moradi, Sohrab & Limaei, Soleiman Mohammadi, 2018. "Multi-objective game theory model and fuzzy programing approach for sustainable watershed management," Land Use Policy, Elsevier, vol. 71(C), pages 363-371.
    17. Laia, R. & Pousinho, H.M.I. & Melíco, R. & Mendes, V.M.F., 2016. "Bidding strategy of wind-thermal energy producers," Renewable Energy, Elsevier, vol. 99(C), pages 673-681.
    18. Stefansson, Hlynur & Sigmarsdottir, Sigrun & Jensson, Pall & Shah, Nilay, 2011. "Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry," European Journal of Operational Research, Elsevier, vol. 215(2), pages 383-392, December.
    19. Moo-Sung Sohn & Jiwoong Choi & Hoseog Kang & In-Chan Choi, 2017. "Multiobjective Production Planning at LG Display," Interfaces, INFORMS, vol. 47(4), pages 279-291, August.
    20. Bohle, Carlos & Maturana, Sergio & Vera, Jorge, 2010. "A robust optimization approach to wine grape harvesting scheduling," European Journal of Operational Research, Elsevier, vol. 200(1), pages 245-252, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:269:y:2018:i:1:p:227-243. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.