IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v180y2007i1p249-261.html
   My bibliography  Save this article

Controlling adverse effect on work in process inventory while reducing machine setup time

Author

Listed:
  • Samaddar, Subhashish
  • Hill, Craig A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Samaddar, Subhashish & Hill, Craig A., 2007. "Controlling adverse effect on work in process inventory while reducing machine setup time," European Journal of Operational Research, Elsevier, vol. 180(1), pages 249-261, July.
  • Handle: RePEc:eee:ejores:v:180:y:2007:i:1:p:249-261
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00259-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Willard I. Zangwill, 1987. "From EOQ Towards ZI," Management Science, INFORMS, vol. 33(10), pages 1209-1223, October.
    2. Robert B. Cooper & Shun-Chen Niu & Mandyam M. Srinivasan, 1998. "When Does Forced Idle Time Improve Performance in Polling Models?," Management Science, INFORMS, vol. 44(8), pages 1079-1086, August.
    3. Subhashish Samaddar, 1996. "The Limits of Japanese Production Systems," Interfaces, INFORMS, vol. 26(4), pages 66-68, August.
    4. Willard I. Zangwill, 1992. "The Limits of Japanese Production Theory," Interfaces, INFORMS, vol. 22(5), pages 14-25, October.
    5. Debashish Sarkar & Willard I. Zangwill, 1991. "Variance Effects in Cyclic Production Systems," Management Science, INFORMS, vol. 37(4), pages 444-453, April.
    6. Anne M. Spence & Evan L. Porteus, 1987. "Setup Reduction and Increased Effective Capacity," Management Science, INFORMS, vol. 33(10), pages 1291-1301, October.
    7. Samaddar, Subhashish, 2001. "The effect of setup time reduction on its variance," Omega, Elsevier, vol. 29(3), pages 243-247, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Subhashish Samaddar & Thomas Whalen, 2008. "Improving Performance in Cyclic Production Systems by Using Forced Variable Idle Setup Time," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 173-180, August.
    2. Samaddar, Subhashish, 2001. "The effect of setup time reduction on its variance," Omega, Elsevier, vol. 29(3), pages 243-247, June.
    3. White, Richard E. & Prybutok, Victor, 2001. "The relationship between JIT practices and type of production system," Omega, Elsevier, vol. 29(2), pages 113-124, April.
    4. Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
    5. Banerjee, Avijit & Pyreddy, Vijay R. & Kim, Seung Lae, 1996. "Investment policy for multiple product setup reduction under budgetary and capacity constraints," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 321-327, August.
    6. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
    7. Matsuyama, Keisuke, 1995. "Inventory policy with time-dependent setup cost," International Journal of Production Economics, Elsevier, vol. 42(2), pages 149-160, December.
    8. Nye, T. J. & Jewkes, E. M. & Dilts, D. M., 2001. "Optimal investment in setup reduction in manufacturing systems with WIP inventories," European Journal of Operational Research, Elsevier, vol. 135(1), pages 128-141, November.
    9. Hong, Jae-Dong & Kim, Seung-Lae & Hayya, Jack C., 1996. "Dynamic setup reduction in production lot sizing with nonconstant deterministic demand," European Journal of Operational Research, Elsevier, vol. 90(1), pages 182-196, April.
    10. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    11. Robert B. Cooper & Shun-Chen Niu & Mandyam M. Srinivasan, 1998. "When Does Forced Idle Time Improve Performance in Polling Models?," Management Science, INFORMS, vol. 44(8), pages 1079-1086, August.
    12. Diaby, Moustapha, 2000. "Integrated batch size and setup reduction decisions in multi-product, dynamic manufacturing environments," International Journal of Production Economics, Elsevier, vol. 67(3), pages 219-233, October.
    13. Diaby, Moustapha, 1995. "Optimal setup time reduction for a single product with dynamic demands," European Journal of Operational Research, Elsevier, vol. 85(3), pages 532-540, September.
    14. Chandrashekar, Ashok & Callarman, Thomas E., 1998. "A modelling study of the effects of continuous incremental improvement in the case of a process shop," European Journal of Operational Research, Elsevier, vol. 109(1), pages 111-121, August.
    15. Darwish, M.A., 2008. "EPQ models with varying setup cost," International Journal of Production Economics, Elsevier, vol. 113(1), pages 297-306, May.
    16. Fazel, Farzaneh & Fischer, Klaus P. & Gilbert, Erika W., 1998. "JIT purchasing vs. EOQ with a price discount: An analytical comparison of inventory costs," International Journal of Production Economics, Elsevier, vol. 54(1), pages 101-109, January.
    17. Awi Federgruen & Ziv Katalan, 1998. "Determining Production Schedules Under Base-Stock Policies in Single Facility Multi-Item Production Systems," Operations Research, INFORMS, vol. 46(6), pages 883-898, December.
    18. Sherali, Hanif D. & Van Goubergen, Dirk & Van Landeghem, Hendrik, 2008. "A quantitative approach for scheduling activities to reduce set-up in multiple machine lines," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1224-1237, June.
    19. Steven J. Erlebacher & Medini R. Singh, 1999. "Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines," Operations Research, INFORMS, vol. 47(4), pages 601-618, August.
    20. Pereira, Javier & Paulre, Bernard, 2001. "Flexibility in manufacturing systems: A relational and a dynamic approach," European Journal of Operational Research, Elsevier, vol. 130(1), pages 70-82, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:180:y:2007:i:1:p:249-261. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.