IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v37y1991i4p444-453.html
   My bibliography  Save this article

Variance Effects in Cyclic Production Systems

Author

Listed:
  • Debashish Sarkar

    (AT&T Bell Laboratories, Room 3K332, Crawfords Corner Road, Holmdel, New Jersey 07733-1988)

  • Willard I. Zangwill

    (Graduate School of Business, University of Chicago, 1101 East 58th Street, Chicago, Illinois 60637)

Abstract

Utilizing a cyclic queue system, this paper investigates the effect of variance on a multi-item production facility. The variance of setup time, service rate and arrival rate is shown to have a powerful and sometimes paradoxical influence. Reduction in setup time, for example, is usually presumed to reduce inventory. We demonstrate that inventory can blow up if setup time is cut. Another paradoxical effect of variance is on processing rate. Speeding up the processing rate should reduce the material waiting to be processed. Again we show that the opposite can hold. Other properties of variance are examined, such as its relationship to KAIZEN and Just-In-Time production practices, and especially its property of impairing capacity.

Suggested Citation

  • Debashish Sarkar & Willard I. Zangwill, 1991. "Variance Effects in Cyclic Production Systems," Management Science, INFORMS, vol. 37(4), pages 444-453, April.
  • Handle: RePEc:inm:ormnsc:v:37:y:1991:i:4:p:444-453
    DOI: 10.1287/mnsc.37.4.444
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.37.4.444
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.37.4.444?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Robert B. Cooper & Shun-Chen Niu & Mandyam M. Srinivasan, 1998. "When Does Forced Idle Time Improve Performance in Polling Models?," Management Science, INFORMS, vol. 44(8), pages 1079-1086, August.
    2. Steven J. Erlebacher & Medini R. Singh, 1999. "Optimal Variance Structures and Performance Improvement of Synchronous Assembly Lines," Operations Research, INFORMS, vol. 47(4), pages 601-618, August.
    3. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
    4. Subba Rao, S. & Gunasekaran, A. & Goyal, S. K. & Martikainen, T., 1998. "Waiting line model applications in manufacturing," International Journal of Production Economics, Elsevier, vol. 54(1), pages 1-28, January.
    5. So, Kut C. & Zheng, Xiaona, 2003. "Impact of supplier's lead time and forecast demand updating on retailer's order quantity variability in a two-level supply chain," International Journal of Production Economics, Elsevier, vol. 86(2), pages 169-179, November.
    6. Li, Bo & Arreola-Risa, Antonio, 2017. "Financial risk, inventory decision and process improvement for a firm with random capacity," European Journal of Operational Research, Elsevier, vol. 260(1), pages 183-194.
    7. Mahender P. Singh & Mandyam M. Srinivasan, 2007. "Performance Bounds for Flexible Systems Requiring Setups," Management Science, INFORMS, vol. 53(6), pages 991-1004, June.
    8. David M. Markowitz & Lawrence M. Wein, 2001. "Heavy Traffic Analysis of Dynamic Cyclic Policies: A Unified Treatment of the Single Machine Scheduling Problem," Operations Research, INFORMS, vol. 49(2), pages 246-270, April.
    9. Samaddar, Subhashish, 2001. "The effect of setup time reduction on its variance," Omega, Elsevier, vol. 29(3), pages 243-247, June.
    10. Subhashish Samaddar & Thomas Whalen, 2008. "Improving Performance in Cyclic Production Systems by Using Forced Variable Idle Setup Time," Manufacturing & Service Operations Management, INFORMS, vol. 10(2), pages 173-180, August.
    11. Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
    12. Samaddar, Subhashish & Hill, Craig A., 2007. "Controlling adverse effect on work in process inventory while reducing machine setup time," European Journal of Operational Research, Elsevier, vol. 180(1), pages 249-261, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:37:y:1991:i:4:p:444-453. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.