IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v149y2003i3p523-532.html
   My bibliography  Save this article

Rescheduling of identical parallel machines under machine eligibility constraints

Author

Listed:
  • Alagoz, Oguzhan
  • Azizoglu, Meral

Abstract

No abstract is available for this item.

Suggested Citation

  • Alagoz, Oguzhan & Azizoglu, Meral, 2003. "Rescheduling of identical parallel machines under machine eligibility constraints," European Journal of Operational Research, Elsevier, vol. 149(3), pages 523-532, September.
  • Handle: RePEc:eee:ejores:v:149:y:2003:i:3:p:523-532
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(02)00499-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Akturk, M. Selim & Gorgulu, Elif, 1999. "Match-up scheduling under a machine breakdown," European Journal of Operational Research, Elsevier, vol. 112(1), pages 81-97, January.
    2. James C. Bean & John R. Birge & John Mittenthal & Charles E. Noon, 1991. "Matchup Scheduling with Multiple Resources, Release Dates and Disruptions," Operations Research, INFORMS, vol. 39(3), pages 470-483, June.
    3. Ali Tamer Unal & Reha Uzsoy & Ali Kiran, 1997. "Rescheduling on a single machine with part-type dependent setup times and deadlines," Annals of Operations Research, Springer, vol. 70(0), pages 93-113, April.
    4. Guo, Bo & Nonaka, Yasuo, 1999. "Rescheduling and optimization of schedules considering machine failures," International Journal of Production Economics, Elsevier, vol. 60(1), pages 503-513, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Emine Akyol Ozer & Tugba Sarac, 2019. "MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 27(1), pages 94-124, April.
    2. Aytug, Haldun & Lawley, Mark A. & McKay, Kenneth & Mohan, Shantha & Uzsoy, Reha, 2005. "Executing production schedules in the face of uncertainties: A review and some future directions," European Journal of Operational Research, Elsevier, vol. 161(1), pages 86-110, February.
    3. Herroelen, Willy & Leus, Roel, 2005. "Project scheduling under uncertainty: Survey and research potentials," European Journal of Operational Research, Elsevier, vol. 165(2), pages 289-306, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qi, Xiangtong & Bard, Jonathan F. & Yu, Gang, 2006. "Disruption management for machine scheduling: The case of SPT schedules," International Journal of Production Economics, Elsevier, vol. 103(1), pages 166-184, September.
    2. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
    3. Wenchang Luo & Rylan Chin & Alexander Cai & Guohui Lin & Bing Su & An Zhang, 2022. "A tardiness-augmented approximation scheme for rejection-allowed multiprocessor rescheduling," Journal of Combinatorial Optimization, Springer, vol. 44(1), pages 690-722, August.
    4. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
    5. Yin, Yunqiang & Cheng, T.C.E. & Wang, Du-Juan, 2016. "Rescheduling on identical parallel machines with machine disruptions to minimize total completion time," European Journal of Operational Research, Elsevier, vol. 252(3), pages 737-749.
    6. Liu, Zhixin & Lu, Liang & Qi, Xiangtong, 2018. "Cost allocation in rescheduling with machine unavailable period," European Journal of Operational Research, Elsevier, vol. 266(1), pages 16-28.
    7. Nicholas G. Hall & Chris N. Potts, 2004. "Rescheduling for New Orders," Operations Research, INFORMS, vol. 52(3), pages 440-453, June.
    8. Nicholas G. Hall & Chris N. Potts, 2010. "Rescheduling for Job Unavailability," Operations Research, INFORMS, vol. 58(3), pages 746-755, June.
    9. Jürgen Kuster & Dietmar Jannach & Gerhard Friedrich, 2010. "Applying Local Rescheduling in response to schedule disruptions," Annals of Operations Research, Springer, vol. 180(1), pages 265-282, November.
    10. M Ozlen & M Azizoğlu, 2011. "Rescheduling unrelated parallel machines with total flow time and total disruption cost criteria," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 152-164, January.
    11. Aytug, Haldun & Lawley, Mark A. & McKay, Kenneth & Mohan, Shantha & Uzsoy, Reha, 2005. "Executing production schedules in the face of uncertainties: A review and some future directions," European Journal of Operational Research, Elsevier, vol. 161(1), pages 86-110, February.
    12. Cowling, Peter & Johansson, Marcus, 2002. "Using real time information for effective dynamic scheduling," European Journal of Operational Research, Elsevier, vol. 139(2), pages 230-244, June.
    13. Herroelen, Willy & Leus, Roel, 2005. "Project scheduling under uncertainty: Survey and research potentials," European Journal of Operational Research, Elsevier, vol. 165(2), pages 289-306, September.
    14. Nicholas G. Hall & Zhixin Liu & Chris N. Potts, 2007. "Rescheduling for Multiple New Orders," INFORMS Journal on Computing, INFORMS, vol. 19(4), pages 633-645, November.
    15. Seddik, Yasmina & Hanzálek, Zdenek, 2017. "Match-up scheduling of mixed-criticality jobs: Maximizing the probability of jobs execution," European Journal of Operational Research, Elsevier, vol. 262(1), pages 46-59.
    16. Zhao, Chuan-Li & Tang, Heng-Yong, 2010. "Scheduling deteriorating jobs under disruption," International Journal of Production Economics, Elsevier, vol. 125(2), pages 294-299, June.
    17. Jian Chao Luo & Ke Yi Xing & Meng Chu Zhou & Xiao Ling Li & Xin Nian Wang, 2017. "Scheduling of deadlock and failure-prone automated manufacturing systems via hybrid heuristic search," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3283-3293, June.
    18. Ajay Surendrarao Bhongade & Prakash Manohar Khodke & Ateekh Ur Rehman & Manoj Dattatray Nikam & Prathamesh Dattatray Patil & Pramod Suryavanshi, 2023. "Managing Disruptions in a Flow-Shop Manufacturing System," Mathematics, MDPI, vol. 11(7), pages 1-22, April.
    19. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    20. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:149:y:2003:i:3:p:523-532. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.