MIP models and a matheuristic algorithm for an identical parallel machine scheduling problem under multiple copies of shared resources constraints
Author
Abstract
Suggested Citation
DOI: 10.1007/s11750-018-00494-x
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Guimarães, Luis & Klabjan, Diego & Almada-Lobo, Bernardo, 2013. "Pricing, relaxing and fixing under lot sizing and scheduling," European Journal of Operational Research, Elsevier, vol. 230(2), pages 399-411.
- Alagoz, Oguzhan & Azizoglu, Meral, 2003. "Rescheduling of identical parallel machines under machine eligibility constraints," European Journal of Operational Research, Elsevier, vol. 149(3), pages 523-532, September.
- Nait Tahar, Djamel & Yalaoui, Farouk & Chu, Chengbin & Amodeo, Lionel, 2006. "A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 63-73, February.
- Fanjul-Peyro, Luis & Perea, Federico & Ruiz, Rubén, 2017. "Models and matheuristics for the unrelated parallel machine scheduling problem with additional resources," European Journal of Operational Research, Elsevier, vol. 260(2), pages 482-493.
- Billaut, Jean-Charles & Della Croce, Federico & Grosso, Andrea, 2015. "A single machine scheduling problem with two-dimensional vector packing constraints," European Journal of Operational Research, Elsevier, vol. 243(1), pages 75-81.
- Kangbok Lee & Joseph Leung & Michael Pinedo, 2013. "Makespan minimization in online scheduling with machine eligibility," Annals of Operations Research, Springer, vol. 204(1), pages 189-222, April.
- Gedik, Ridvan & Rainwater, Chase & Nachtmann, Heather & Pohl, Ed A., 2016. "Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals," European Journal of Operational Research, Elsevier, vol. 251(2), pages 640-650.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kennedy A. G. Araújo & Tibérius O. Bonates & Bruno A. Prata & Anselmo R. Pitombeira-Neto, 2021. "Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(3), pages 660-693, October.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Mohammad Mahdi Ahmadian & Amir Salehipour, 2021. "The just-in-time job-shop scheduling problem with distinct due-dates for operations," Journal of Heuristics, Springer, vol. 27(1), pages 175-204, April.
- Bentao Su & Naiming Xie & Yingjie Yang, 2021. "Hybrid genetic algorithm based on bin packing strategy for the unrelated parallel workgroup scheduling problem," Journal of Intelligent Manufacturing, Springer, vol. 32(4), pages 957-969, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Marco Ghirardi & Fabio Salassa, 2022. "A simple and effective algorithm for the maximum happy vertices problem," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 30(1), pages 181-193, April.
- Bentao Su & Naiming Xie, 2020. "Single workgroup scheduling problem with variable processing personnel," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(2), pages 671-684, June.
- Framinan, Jose M. & Perez-Gonzalez, Paz, 2018. "Order scheduling with tardiness objective: Improved approximate solutions," European Journal of Operational Research, Elsevier, vol. 266(3), pages 840-850.
- Michael Geurtsen & Jelle Adan & Alp Akçay, 2024. "Integrated maintenance and production scheduling for unrelated parallel machines with setup times," Flexible Services and Manufacturing Journal, Springer, vol. 36(3), pages 1046-1079, September.
- Fleszar, Krzysztof & Hindi, Khalil S., 2018. "Algorithms for the unrelated parallel machine scheduling problem with a resource constraint," European Journal of Operational Research, Elsevier, vol. 271(3), pages 839-848.
- Parreño, F. & Alvarez-Valdes, R., 2021. "Mathematical models for a cutting problem in the glass manufacturing industry," Omega, Elsevier, vol. 103(C).
- Nascimento, Paulo Jorge & Silva, Cristóvão & Antunes, Carlos Henggeler & Moniz, Samuel, 2024. "Optimal decomposition approach for solving large nesting and scheduling problems of additive manufacturing systems," European Journal of Operational Research, Elsevier, vol. 317(1), pages 92-110.
- Feifeng Zheng & Yuhong Chen & Ming Liu & Yinfeng Xu, 2022. "Competitive analysis of online machine rental and online parallel machine scheduling problems with workload fence," Journal of Combinatorial Optimization, Springer, vol. 44(2), pages 1060-1076, September.
- Hesham K. Alfares, 2022. "Plant shutdown maintenance workforce team assignment and job scheduling," Journal of Scheduling, Springer, vol. 25(3), pages 321-338, June.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- Ali Kordmostafapour & Javad Rezaeian & Iraj Mahdavi & Mahdi Yar Farjad, 2022. "Scheduling unrelated parallel machine problem with multi-mode processing times and batch delivery cost," OPSEARCH, Springer;Operational Research Society of India, vol. 59(4), pages 1438-1470, December.
- Elham Ziar & Mehdi Seifbarghy & Mahdi Bashiri & Benny Tjahjono, 2023. "An efficient environmentally friendly transportation network design via dry ports: a bi-level programming approach," Annals of Operations Research, Springer, vol. 322(2), pages 1143-1166, March.
- Oliveira, Beatriz Brito & Carravilla, Maria Antónia & Oliveira, José Fernando & Toledo, Franklina M.B., 2014. "A relax-and-fix-based algorithm for the vehicle-reservation assignment problem in a car rental company," European Journal of Operational Research, Elsevier, vol. 237(2), pages 729-737.
- Jun-Ho Lee & Hyun-Jung Kim, 2021. "A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 992-1026, December.
- Boonmee, Atiwat & Sethanan, Kanchana, 2016. "A GLNPSO for multi-level capacitated lot-sizing and scheduling problem in the poultry industry," European Journal of Operational Research, Elsevier, vol. 250(2), pages 652-665.
- Roshanaei, Vahid & Booth, Kyle E.C. & Aleman, Dionne M. & Urbach, David R. & Beck, J. Christopher, 2020. "Branch-and-check methods for multi-level operating room planning and scheduling," International Journal of Production Economics, Elsevier, vol. 220(C).
- Singh, Nitish & Dang, Quang-Vinh & Akcay, Alp & Adan, Ivo & Martagan, Tugce, 2022. "A matheuristic for AGV scheduling with battery constraints," European Journal of Operational Research, Elsevier, vol. 298(3), pages 855-873.
- Kennedy A. G. Araújo & Tibérius O. Bonates & Bruno A. Prata & Anselmo R. Pitombeira-Neto, 2021. "Heterogeneous prestressed precast beams multiperiod production planning problem: modeling and solution methods," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 29(3), pages 660-693, October.
- Geurtsen, M. & Didden, Jeroen B.H.C. & Adan, J. & Atan, Z. & Adan, I., 2023. "Production, maintenance and resource scheduling: A review," European Journal of Operational Research, Elsevier, vol. 305(2), pages 501-529.
- Lee, Cheng-Hsiung & Liao, Ching-Jong & Chung, Tsui-Ping, 2014. "Scheduling with multi-attribute setup times on two identical parallel machines," International Journal of Production Economics, Elsevier, vol. 153(C), pages 130-138.
More about this item
Keywords
Matheuristic; Genetic algorithm; Identical parallel machine scheduling problem; Sequence-dependent setup times; Machine eligibility restrictions; Multiple copies of shared resources;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:topjnl:v:27:y:2019:i:1:d:10.1007_s11750-018-00494-x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.