Scheduling of deadlock and failure-prone automated manufacturing systems via hybrid heuristic search

Author

Listed:
  • Jian Chao Luo
  • Ke Yi Xing
  • Meng Chu Zhou
  • Xiao Ling Li
  • Xin Nian Wang

Abstract

This work focuses on the scheduling problem of deadlock and failure-prone automated manufacturing systems, and presents a new scheduling method by combining a robust supervisory control policy and hybrid heuristic search. It aims to minimise makespan, i.e. the completion time of the last part. Based on the extended reach ability graph of the system, it establishes a new heuristic function and two dispatching rules to guide the search process for a schedule. By embedding a robust supervisory control policy into the search process, it develops a polynomial robust dynamic window search algorithm. Failure and repair events of unreliable resources may occur during the execution of a schedule obtained by the proposed algorithm and may make the schedule infeasible. To reduce the influence caused by them and ensure all parts to be finished, this work proposes two event-driven strategies. The first one suspends the execution of the parts requiring failed resources and those to be started until all failed resources are repaired and permits only those parts that have already been processed on working machines to be completed. The second one invokes the proposed algorithm to obtain a new schedule at the vertex generated after a resource failure or repair event and executes the new schedule. Both strategies are effective while the latter performs better at the expense of more computation.

Suggested Citation

  • Jian Chao Luo & Ke Yi Xing & Meng Chu Zhou & Xiao Ling Li & Xin Nian Wang, 2017. "Scheduling of deadlock and failure-prone automated manufacturing systems via hybrid heuristic search," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3283-3293, June.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:11:p:3283-3293
    DOI: 10.1080/00207543.2017.1306132
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2017.1306132
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2017.1306132?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Akturk, M. Selim & Gorgulu, Elif, 1999. "Match-up scheduling under a machine breakdown," European Journal of Operational Research, Elsevier, vol. 112(1), pages 81-97, January.
    2. Aytug, Haldun & Lawley, Mark A. & McKay, Kenneth & Mohan, Shantha & Uzsoy, Reha, 2005. "Executing production schedules in the face of uncertainties: A review and some future directions," European Journal of Operational Research, Elsevier, vol. 161(1), pages 86-110, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Qi, Xiangtong & Bard, Jonathan F. & Yu, Gang, 2006. "Disruption management for machine scheduling: The case of SPT schedules," International Journal of Production Economics, Elsevier, vol. 103(1), pages 166-184, September.
    2. Weibo Liu & Yan Jin & Mark Price, 2017. "New scheduling algorithms and digital tool for dynamic permutation flowshop with newly arrived order," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3234-3248, June.
    3. Alexey Matveev & Varvara Feoktistova & Ksenia Bolshakova, 2016. "On Global Near Optimality of Special Periodic Protocols for Fluid Polling Systems with Setups," Journal of Optimization Theory and Applications, Springer, vol. 171(3), pages 1055-1070, December.
    4. Faicel Hnaien & Taha Arbaoui, 2023. "Minimizing the makespan for the two-machine flow shop scheduling problem with random breakdown," Annals of Operations Research, Springer, vol. 328(2), pages 1437-1460, September.
    5. Lamas, Patricio & Goycoolea, Marcos & Pagnoncelli, Bernardo & Newman, Alexandra, 2024. "A target-time-windows technique for project scheduling under uncertainty," European Journal of Operational Research, Elsevier, vol. 314(2), pages 792-806.
    6. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
    7. Boysen, Nils & Briskorn, Dirk & Schwerdfeger, Stefan, 2019. "Matching supply and demand in a sharing economy: Classification, computational complexity, and application," European Journal of Operational Research, Elsevier, vol. 278(2), pages 578-595.
    8. Han, Xiao-le & Lu, Zhi-qiang & Xi, Li-feng, 2010. "A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1327-1340, December.
    9. Gang Xuan & Win-Chin Lin & Shuenn-Ren Cheng & Wei-Lun Shen & Po-An Pan & Chih-Ling Kuo & Chin-Chia Wu, 2022. "A Robust Single-Machine Scheduling Problem with Two Job Parameter Scenarios," Mathematics, MDPI, vol. 10(13), pages 1-17, June.
    10. Narjes Sabeghi & Hamed Reza Tareghian, 2020. "Using the generalized maximum covering location model to control a project’s progress," Computational Management Science, Springer, vol. 17(1), pages 1-21, January.
    11. Amir Mokhtari & Jane M. Van Doren, 2019. "An Agent‐Based Model for Pathogen Persistence and Cross‐Contamination Dynamics in a Food Facility," Risk Analysis, John Wiley & Sons, vol. 39(5), pages 992-1021, May.
    12. Black, Gary W. & McKay, Kenneth N. & Morton, Thomas E., 2006. "Aversion scheduling in the presence of risky jobs," European Journal of Operational Research, Elsevier, vol. 175(1), pages 338-361, November.
    13. Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
    14. Shichang Xiao & Shudong Sun & Jionghua (Judy) Jin, 2017. "Surrogate Measures for the Robust Scheduling of Stochastic Job Shop Scheduling Problems," Energies, MDPI, vol. 10(4), pages 1-26, April.
    15. Jian Yang & Xiangtong Qi & Gang Yu, 2005. "Disruption management in production planning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 420-442, August.
    16. Guarnaschelli, Armando & Chiotti, Omar & Salomone, Hector E., 2013. "An approach based on constraint satisfaction problems to disruptive event management in supply chains," International Journal of Production Economics, Elsevier, vol. 144(1), pages 223-242.
    17. Akkan, Can & Erdem Külünk, M. & Koçaş, Cenk, 2016. "Finding robust timetables for project presentations of student teams," European Journal of Operational Research, Elsevier, vol. 249(2), pages 560-576.
    18. Marco Wurster & Marius Michel & Marvin Carl May & Andreas Kuhnle & Nicole Stricker & Gisela Lanza, 2022. "Modelling and condition-based control of a flexible and hybrid disassembly system with manual and autonomous workstations using reinforcement learning," Journal of Intelligent Manufacturing, Springer, vol. 33(2), pages 575-591, February.
    19. Yin, Yunqiang & Cheng, T.C.E. & Wang, Du-Juan, 2016. "Rescheduling on identical parallel machines with machine disruptions to minimize total completion time," European Journal of Operational Research, Elsevier, vol. 252(3), pages 737-749.
    20. Victory Ikpe & Mohammad Shamsuddoha, 2024. "Functional Model of Supply Chain Waste Reduction and Control Strategies for Retailers—The USA Retail Industry," Logistics, MDPI, vol. 8(1), pages 1-17, February.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:11:p:3283-3293. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.