IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v138y2002i1p87-102.html
   My bibliography  Save this article

MRP performance effects due to forecast bias and demand uncertainty

Author

Listed:
  • Enns, S. T.

Abstract

No abstract is available for this item.

Suggested Citation

  • Enns, S. T., 2002. "MRP performance effects due to forecast bias and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 138(1), pages 87-102, April.
  • Handle: RePEc:eee:ejores:v:138:y:2002:i:1:p:87-102
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00134-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Adam, Nabil R. & Bertrand, J. Will M. & Morehead, Diane C. & Surkis, Julius, 1993. "Due date assignment procedures with dynamically updated coefficients for multi-level assembly job shops," European Journal of Operational Research, Elsevier, vol. 68(2), pages 212-227, July.
    2. T. S. Lee & Everett E. Adam, Jr., 1986. "Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems," Management Science, INFORMS, vol. 32(9), pages 1186-1205, September.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Faicel Hnaien & Alexandre Dolgui & Desheng Dash Wu, 2016. "Single-period inventory model for one-level assembly system with stochastic lead times and demand," International Journal of Production Research, Taylor & Francis Journals, vol. 54(1), pages 186-203, January.
    2. Blanc, Sebastian M. & Setzer, Thomas, 2015. "Analytical debiasing of corporate cash flow forecasts," European Journal of Operational Research, Elsevier, vol. 243(3), pages 1004-1015.
    3. Sagaert, Yves R. & Kourentzes, Nikolaos & De Vuyst, Stijn & Aghezzaf, El-Houssaine & Desmet, Bram, 2019. "Incorporating macroeconomic leading indicators in tactical capacity planning," International Journal of Production Economics, Elsevier, vol. 209(C), pages 12-19.
    4. Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
    5. Danese, Pamela & Kalchschmidt, Matteo, 2011. "The role of the forecasting process in improving forecast accuracy and operational performance," International Journal of Production Economics, Elsevier, vol. 131(1), pages 204-214, May.
    6. Simon Thevenin & Yossiri Adulyasak & Jean‐François Cordeau, 2021. "Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization," Production and Operations Management, Production and Operations Management Society, vol. 30(2), pages 475-493, February.
    7. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    8. Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    9. Gansterer, Margaretha, 2015. "Aggregate planning and forecasting in make-to-order production systems," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 521-528.
    10. Chen, Chen-Tung & Huang, Sue-Fen, 2006. "Order-fulfillment ability analysis in the supply-chain system with fuzzy operation times," International Journal of Production Economics, Elsevier, vol. 101(1), pages 185-193, May.
    11. Danese, Pamela & Kalchschmidt, Matteo, 2011. "The impact of forecasting on companies' performance: Analysis in a multivariate setting," International Journal of Production Economics, Elsevier, vol. 133(1), pages 458-469, September.
    12. repec:dgr:rugsom:02a42 is not listed on IDEAS
    13. Van den Broeke, Maud & De Baets, Shari & Vereecke, Ann & Baecke, Philippe & Vanderheyden, Karlien, 2019. "Judgmental forecast adjustments over different time horizons," Omega, Elsevier, vol. 87(C), pages 34-45.
    14. R Fildes & B Kingsman, 2011. "Incorporating demand uncertainty and forecast error in supply chain planning models," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 483-500, March.
    15. Klaus Altendorfer & Thomas Felberbauer & Herbert Jodlbauer, 2018. "Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand," Papers 1812.00773, arXiv.org.
    16. Mohebbi, E. & Choobineh, F. & Pattanayak, A., 2007. "Capacity-driven vs. demand-driven material procurement systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 451-466, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Alex Bangash & Ramesh Bollapragada & Rachelle Klein & Narayan Raman & Herbert B. Shulman & Donald R. Smith, 2004. "Inventory Requirements Planning at Lucent Technologies," Interfaces, INFORMS, vol. 34(5), pages 342-352, October.
    2. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    3. Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
    4. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
    5. Klaus Altendorfer & Thomas Felberbauer & Herbert Jodlbauer, 2018. "Effects of forecast errors on optimal utilisation in aggregate production planning with stochastic customer demand," Papers 1812.00773, arXiv.org.
    6. Wallace J. Hopp & Melanie Roof Sturgis, 2001. "A Simple, Robust Leadtime-Quoting Policy," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 321-336, April.
    7. Kerkkänen, Annastiina & Korpela, Jukka & Huiskonen, Janne, 2009. "Demand forecasting errors in industrial context: Measurement and impacts," International Journal of Production Economics, Elsevier, vol. 118(1), pages 43-48, March.
    8. Jianjun Liu & Martin J. Land & Jos A. C. Bokhorst & Qingxin Chen, 2023. "Improving coordination in assembly job shops: redesigning order release and dispatching," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 669-697, September.
    9. Sanders, Nada R. & Graman, Gregory A., 2009. "Quantifying costs of forecast errors: A case study of the warehouse environment," Omega, Elsevier, vol. 37(1), pages 116-125, February.
    10. Danese, Pamela & Kalchschmidt, Matteo, 2011. "The role of the forecasting process in improving forecast accuracy and operational performance," International Journal of Production Economics, Elsevier, vol. 131(1), pages 204-214, May.
    11. Van den Broeke, Maud & De Baets, Shari & Vereecke, Ann & Baecke, Philippe & Vanderheyden, Karlien, 2019. "Judgmental forecast adjustments over different time horizons," Omega, Elsevier, vol. 87(C), pages 34-45.
    12. Andrew F. Siegel & Michael R. Wagner, 2021. "Profit Estimation Error in the Newsvendor Model Under a Parametric Demand Distribution," Management Science, INFORMS, vol. 67(8), pages 4863-4879, August.
    13. R Fildes & B Kingsman, 2011. "Incorporating demand uncertainty and forecast error in supply chain planning models," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(3), pages 483-500, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:138:y:2002:i:1:p:87-102. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.