Capacity-driven vs. demand-driven material procurement systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Murthy, D.N.P. & Ma, L., 1991. "MRP with uncertainty: a review and some extensions," International Journal of Production Economics, Elsevier, vol. 25(1-3), pages 51-64.
- Zhou, Li & Grubbstrom, R.W.Robert W., 2004. "Analysis of the effect of commonality in multi-level inventory systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 90(2), pages 251-263, July.
- Rom, Walter O. & Tukel, Oya Icmeli & Muscatello, Joseph R., 2002. "MRP in a job shop environment using a resource constrained project scheduling model," Omega, Elsevier, vol. 30(4), pages 275-286, August.
- Plenert, Gerhard, 1999. "Focusing material requirements planning (MRP) towards performance," European Journal of Operational Research, Elsevier, vol. 119(1), pages 91-99, November.
- Clark, Alistair R., 2003. "Optimization approximations for capacity constrained material requirements planning," International Journal of Production Economics, Elsevier, vol. 84(2), pages 115-131, May.
- Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
- Enns, S. T., 2002. "MRP performance effects due to forecast bias and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 138(1), pages 87-102, April.
- Kenneth R. Baker & Michael J. Magazine & Henry L. W. Nuttle, 1986. "The Effect of Commonality on Safety Stock in a Simple Inventory Model," Management Science, INFORMS, vol. 32(8), pages 982-988, August.
- David A. Collier, 1982. "Aggregate Safety Stock Levels and Component Part Commonality," Management Science, INFORMS, vol. 28(11), pages 1296-1303, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
- Louly, Mohamed-Aly & Dolgui, Alexandre, 2013. "Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint," International Journal of Production Economics, Elsevier, vol. 143(1), pages 35-40.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lin, James T. & Chen, Tzu-Li & Lin, Yen-Ting, 2009. "Critical material planning for TFT-LCD production industry," International Journal of Production Economics, Elsevier, vol. 122(2), pages 639-655, December.
- Brun, Alessandro & Capra, Eugenio & Miragliotta, Giovanni, 2009. "VRP revisited: The impact of behavioural costs in balancing standardisation and variety," International Journal of Production Economics, Elsevier, vol. 117(1), pages 16-29, January.
- Hsieh, Ying-Jiun, 2011. "Demand switching criteria for multiple products: An inventory cost analysis," Omega, Elsevier, vol. 39(2), pages 130-137, April.
- Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
- Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de EconomÃa de la Empresa.
- Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
- Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
- Yeu-Shiang Huang & Hau-Wen Lo & Jyh-Wen Ho, 2021. "Effects of component commonality and perishability on inventory control in assemble-to-order systems," Operational Research, Springer, vol. 21(1), pages 205-229, March.
- Albert Y. Ha, 2000. "Stock Rationing in an M/E k /1 Make-to-Stock Queue," Management Science, INFORMS, vol. 46(1), pages 77-87, January.
- Ma, Shihua & Wang, Wei & Liu, Liming, 2002. "Commonality and postponement in multistage assembly systems," European Journal of Operational Research, Elsevier, vol. 142(3), pages 523-538, November.
- Eva Labro, 2004. "The Cost Effects of Component Commonality: A Literature Review Through a Management-Accounting Lens," Manufacturing & Service Operations Management, INFORMS, vol. 6(4), pages 358-367, June.
- Narendra Agrawal & Morris A. Cohen, 2001. "Optimal material control in an assembly system with component commonality," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(5), pages 409-429, August.
- Ulrich W. Thonemann & Margaret L. Brandeau, 2000. "Optimal Commonality in Component Design," Operations Research, INFORMS, vol. 48(1), pages 1-19, February.
- Atan, Zümbül & Ahmadi, Taher & Stegehuis, Clara & Kok, Ton de & Adan, Ivo, 2017. "Assemble-to-order systems: A review," European Journal of Operational Research, Elsevier, vol. 261(3), pages 866-879.
- Mohebbi, E. & Choobineh, F., 2005. "The impact of component commonality in an assemble-to-order environment under supply and demand uncertainty," Omega, Elsevier, vol. 33(6), pages 472-482, December.
- Perera, H. S. C. & Nagarur, Nagen & Tabucanon, Mario T., 1999. "Component part standardization: A way to reduce the life-cycle costs of products," International Journal of Production Economics, Elsevier, vol. 60(1), pages 109-116, April.
- Wenyuan Wang & Daniel Y. Mo & Yue Wang & Mitchell M. Tseng, 2019. "Assessing the cost structure of component reuse in a product family for remanufacturing," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 575-587, February.
- Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
- Hong, Yoo Suk & Huh, Woonghee Tim & Kang, Changmuk, 2017. "Sourcing assemble-to-order inventories under supplier risk uncertainty," Omega, Elsevier, vol. 66(PA), pages 1-14.
- Betts, John M. & Johnston, Robert B., 2005. "Just-in-time component replenishment decisions for assemble-to-order manufacturing under capital constraint and stochastic demand," International Journal of Production Economics, Elsevier, vol. 95(1), pages 51-70, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:107:y:2007:i:2:p:451-466. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.