IDEAS home Printed from https://ideas.repec.org/a/eee/jomega/v37y2009i1p116-125.html
   My bibliography  Save this article

Quantifying costs of forecast errors: A case study of the warehouse environment

Author

Listed:
  • Sanders, Nada R.
  • Graman, Gregory A.

Abstract

Our study evaluates the impact of forecast errors on organizational cost by simulating a labor-intensive warehouse environment using realistic cost data from a case study. Unlike past studies that measure forecast error in terms of forecast standard deviation, our study also considers the impact of forecast bias, and the complex interaction between these variables. Two cases of organizational cost curves are considered, with differing and asymmetric structures. Results find forecast bias to have a considerably greater impact on organizational cost than forecast standard deviation. Particularly damaging is a high bias in the presence of high forecast standard deviation. Although biasing the forecast in the least costly direction is shown to yield lower costs, sensitivity analysis shows that increasing bias beyond the optimum point rapidly increases costs. 'Overshooting' the optimal amount of bias appears to be more damaging than not biasing the forecast at all. Given that managers often deliberately bias their forecasts, this finding underscores the importance of having a good understanding of organizational cost structures before arbitrarily introducing bias. This finding also suggests that managers should exercise caution when introducing bias, particularly for forecasts that inherently have large errors. These findings have important implications for organizational decision making beyond the simulated warehouse, as high forecast errors are endemic to many labor-intensive organizations.

Suggested Citation

  • Sanders, Nada R. & Graman, Gregory A., 2009. "Quantifying costs of forecast errors: A case study of the warehouse environment," Omega, Elsevier, vol. 37(1), pages 116-125, February.
  • Handle: RePEc:eee:jomega:v:37:y:2009:i:1:p:116-125
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0305-0483(06)00133-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Charles C. Holt & Franco Modigliani & Herbert A. Simon, 1955. "A Linear Decision Rule for Production and Employment Scheduling," Management Science, INFORMS, vol. 2(1), pages 1-30, October.
    2. T. S. Lee & Everett E. Adam, Jr., 1986. "Forecasting Error Evaluation in Material Requirements Planning (MRP) Production-Inventory Systems," Management Science, INFORMS, vol. 32(9), pages 1186-1205, September.
    3. Gerard Cachon, 2001. "Managing a Retailer's Shelf Space, Inventory, and Transportation," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 211-229, July.
    4. Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
    5. Ward Whitt, 2006. "Staffing a Call Center with Uncertain Arrival Rate and Absenteeism," Production and Operations Management, Production and Operations Management Society, vol. 15(1), pages 88-102, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Robbins, Thomas R. & Harrison, Terry P., 2010. "A stochastic programming model for scheduling call centers with global Service Level Agreements," European Journal of Operational Research, Elsevier, vol. 207(3), pages 1608-1619, December.
    2. Wan, Xiang & Sanders, Nadia R., 2017. "The negative impact of product variety: Forecast bias, inventory levels, and the role of vertical integration," International Journal of Production Economics, Elsevier, vol. 186(C), pages 123-131.
    3. Danese, Pamela & Kalchschmidt, Matteo, 2011. "The role of the forecasting process in improving forecast accuracy and operational performance," International Journal of Production Economics, Elsevier, vol. 131(1), pages 204-214, May.
    4. Kouki, Chaaben & Babai, M. Zied & Jemai, Zied & Minner, Stefan, 2016. "A coordinated multi-item inventory system for perishables with random lifetime," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 226-237.
    5. Tempelmeier, Horst & Bantel, Oliver, 2015. "Integrated optimization of safety stock and transportation capacity," European Journal of Operational Research, Elsevier, vol. 247(1), pages 101-112.
    6. Saravanan Kesavan & Susan J. Lambert & Joan C. Williams & Pradeep K. Pendem, 2022. "Doing Well by Doing Good: Improving Retail Store Performance with Responsible Scheduling Practices at the Gap, Inc," Management Science, INFORMS, vol. 68(11), pages 7818-7836, November.
    7. Jean-Bernard Chatelain & Kirsten Ralf, 2020. "How macroeconomists lost control of stabilization policy: towards dark ages," The European Journal of the History of Economic Thought, Taylor & Francis Journals, vol. 27(6), pages 938-982, November.
    8. Alex Bangash & Ramesh Bollapragada & Rachelle Klein & Narayan Raman & Herbert B. Shulman & Donald R. Smith, 2004. "Inventory Requirements Planning at Lucent Technologies," Interfaces, INFORMS, vol. 34(5), pages 342-352, October.
    9. Banu Sungur & Cemal Özgüven & Yasemin Kariper, 2017. "Shift scheduling with break windows, ideal break periods, and ideal waiting times," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 203-222, June.
    10. Singhal, Jaya & Singhal, Kalyan, 1996. "Alternate approaches to solving the Holt et al. model and to performing sensitivity analysis," European Journal of Operational Research, Elsevier, vol. 91(1), pages 89-98, May.
    11. Judy L Klein, 2015. "The Cold War Hot House for Modeling Strategies at the Carnegie Institute of Technology," Working Papers Series 19, Institute for New Economic Thinking.
    12. Nazare, Felipe & Street, Alexandre, 2023. "Solving multistage stochastic linear programming via regularized linear decision rules: An application to hydrothermal dispatch planning," European Journal of Operational Research, Elsevier, vol. 309(1), pages 345-358.
    13. Mie Augier & Michael Prietula, 2007. "Perspective---Historical Roots of the A Behavioral Theory of the Firm Model at GSIA," Organization Science, INFORMS, vol. 18(3), pages 507-522, June.
    14. Jens O. Brunner & Jonathan F. Bard & Jan M. Köhler, 2013. "Bounded flexibility in days‐on and days‐off scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(8), pages 678-701, December.
    15. Andersen, Anders Reenberg & Nielsen, Bo Friis & Reinhardt, Line Blander & Stidsen, Thomas Riis, 2019. "Staff optimization for time-dependent acute patient flow," European Journal of Operational Research, Elsevier, vol. 272(1), pages 94-105.
    16. Xie, Jinxing & Zhao, Xiande & Lee, T. S., 2003. "Freezing the master production schedule under single resource constraint and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 83(1), pages 65-84, January.
    17. Defraeye, Mieke & Van Nieuwenhuyse, Inneke, 2016. "Staffing and scheduling under nonstationary demand for service: A literature review," Omega, Elsevier, vol. 58(C), pages 4-25.
    18. Felipe Nazare & Alexandre Street, 2021. "Solving Multistage Stochastic Linear Programming via Regularized Linear Decision Rules: An Application to Hydrothermal Dispatch Planning," Papers 2110.03146, arXiv.org, revised Jan 2023.
    19. María I. Restrepo & Bernard Gendron & Louis-Martin Rousseau, 2016. "Branch-and-Price for Personalized Multiactivity Tour Scheduling," INFORMS Journal on Computing, INFORMS, vol. 28(2), pages 334-350, May.
    20. Graves, Stephen C. & Meal, Harlan C. & Dasu, Sririam. & Qui, Yuping., 1985. "Two-stage production planning in a dynamic environment," Working papers 1698-85., Massachusetts Institute of Technology (MIT), Sloan School of Management.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:37:y:2009:i:1:p:116-125. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.