An integrated approach for earthwork allocation, sequencing and routing
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2014.04.036
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Gouveia, Luis & Vo[ss], Stefan, 1995. "A classification of formulations for the (time-dependent) traveling salesman problem," European Journal of Operational Research, Elsevier, vol. 83(1), pages 69-82, May.
- Raj Kapur Shah & Nashwan Dawood, 2011. "An innovative approach for generation of a time location plan in road construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 29(5), pages 435-448.
- Hare, Warren L. & Koch, Valentin R. & Lucet, Yves, 2011. "Models and algorithms to improve earthwork operations in road design using mixed integer linear programming," European Journal of Operational Research, Elsevier, vol. 215(2), pages 470-480, December.
- Henderson, Darrall & Vaughan, Diane E. & Jacobson, Sheldon H. & Wakefield, Ron R. & Sewell, Edward C., 2003. "Solving the shortest route cut and fill problem using simulated annealing," European Journal of Operational Research, Elsevier, vol. 145(1), pages 72-84, February.
- Ramazan, Salih, 2007. "The new Fundamental Tree Algorithm for production scheduling of open pit mines," European Journal of Operational Research, Elsevier, vol. 177(2), pages 1153-1166, March.
- A Lim & B Rodrigues & J Zhang, 2005. "Tabu search embedded simulated annealing for the shortest route cut and fill problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(7), pages 816-824, July.
- Underwood, Robert & Tolwinski, Boleslaw, 1998. "A mathematical programming viewpoint for solving the ultimate pit problem," European Journal of Operational Research, Elsevier, vol. 107(1), pages 96-107, May.
- Jean-Claude Picard & Maurice Queyranne, 1978. "The Time-Dependent Traveling Salesman Problem and Its Application to the Tardiness Problem in One-Machine Scheduling," Operations Research, INFORMS, vol. 26(1), pages 86-110, February.
- Lamghari, Amina & Dimitrakopoulos, Roussos, 2012. "A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty," European Journal of Operational Research, Elsevier, vol. 222(3), pages 642-652.
- Chi Ming Tam & Thomas Tong & Bill Wong, 2007. "An integrated system for earthmoving planning," Construction Management and Economics, Taylor & Francis Journals, vol. 25(11), pages 1127-1137.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Burdett, RL, 2016. "Optimisation models for expanding a railway's theoretical capacity," European Journal of Operational Research, Elsevier, vol. 251(3), pages 783-797.
- Hare, Warren & Lucet, Yves & Rahman, Faisal, 2015. "A mixed-integer linear programming model to optimize the vertical alignment considering blocks and side-slopes in road construction," European Journal of Operational Research, Elsevier, vol. 241(3), pages 631-641.
- Hüseyin Güden & Haldun Süral, 2017. "A polynomial algorithm for the earthwork allocation problem with borrow and waste site selection," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(9), pages 1085-1093, September.
- Burdett, Robert L., 2015. "Multi-objective models and techniques for analysing the absolute capacity of railway networks," European Journal of Operational Research, Elsevier, vol. 245(2), pages 489-505.
- Burdett, Robert L & Corry, Paul & Yarlagadda, Prasad & Cook, David & Birgan, Sean & McPhail, Steven M, 2023. "A mathematical framework for regional hospital case mix planning and capacity appraisal," Operations Research Perspectives, Elsevier, vol. 10(C).
- Mauro Dell’Amico & Guenther Fuellerer & Gerhard Höfinger & Manuel Iori & Stefano Novellani, 2016. "A Decision Support System for Highway Construction: The Autostrada Pedemontana Lombarda," Interfaces, INFORMS, vol. 46(3), pages 245-263, April.
- Park, Chung & Lee, Jungpyo & Sohn, So Young, 2019. "Recommendation of feeder bus routes using neural network embedding-based optimization," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 329-341.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rafael Epstein & Marcel Goic & Andrés Weintraub & Jaime Catalán & Pablo Santibáñez & Rodolfo Urrutia & Raúl Cancino & Sergio Gaete & Augusto Aguayo & Felipe Caro, 2012. "Optimizing Long-Term Production Plans in Underground and Open-Pit Copper Mines," Operations Research, INFORMS, vol. 60(1), pages 4-17, February.
- Amina Lamghari & Roussos Dimitrakopoulos & Jacques Ferland, 2015. "A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines," Journal of Global Optimization, Springer, vol. 63(3), pages 555-582, November.
- Silva, Marcos Melo & Subramanian, Anand & Vidal, Thibaut & Ochi, Luiz Satoru, 2012. "A simple and effective metaheuristic for the Minimum Latency Problem," European Journal of Operational Research, Elsevier, vol. 221(3), pages 513-520.
- Chatterjee, Snehamoy & Sethi, Manas Ranjan & Asad, Mohammad Waqar Ali, 2016. "Production phase and ultimate pit limit design under commodity price uncertainty," European Journal of Operational Research, Elsevier, vol. 248(2), pages 658-667.
- Furini, Fabio & Persiani, Carlo Alfredo & Toth, Paolo, 2016. "The Time Dependent Traveling Salesman Planning Problem in Controlled Airspace," Transportation Research Part B: Methodological, Elsevier, vol. 90(C), pages 38-55.
- King, Barry & Goycoolea, Marcos & Newman, A., 2017. "Optimizing the open pit-to-underground mining transition," European Journal of Operational Research, Elsevier, vol. 257(1), pages 297-309.
- Rivera, Juan Carlos & Murat Afsar, H. & Prins, Christian, 2016. "Mathematical formulations and exact algorithm for the multitrip cumulative capacitated single-vehicle routing problem," European Journal of Operational Research, Elsevier, vol. 249(1), pages 93-104.
- F. Angel-Bello & Y. Cardona-Valdés & A. Álvarez, 2019. "Mixed integer formulations for the multiple minimum latency problem," Operational Research, Springer, vol. 19(2), pages 369-398, June.
- Jean-François Cordeau & Gianpaolo Ghiani & Emanuela Guerriero, 2014. "Analysis and Branch-and-Cut Algorithm for the Time-Dependent Travelling Salesman Problem," Transportation Science, INFORMS, vol. 48(1), pages 46-58, February.
- Jélvez, Enrique & Morales, Nelson & Nancel-Penard, Pierre & Cornillier, Fabien, 2020. "A new hybrid heuristic algorithm for the Precedence Constrained Production Scheduling Problem: A mining application," Omega, Elsevier, vol. 94(C).
- N. A. Arellano-Arriaga & J. Molina & S. E. Schaeffer & A. M. Álvarez-Socarrás & I. A. Martínez-Salazar, 2019. "A bi-objective study of the minimum latency problem," Journal of Heuristics, Springer, vol. 25(3), pages 431-454, June.
- Samavati, Mehran & Essam, Daryl & Nehring, Micah & Sarker, Ruhul, 2017. "A methodology for the large-scale multi-period precedence-constrained knapsack problem: an application in the mining industry," International Journal of Production Economics, Elsevier, vol. 193(C), pages 12-20.
- W. Lambert & A. Newman, 2014. "Tailored Lagrangian Relaxation for the open pit block sequencing problem," Annals of Operations Research, Springer, vol. 222(1), pages 419-438, November.
- Kinable, Joris & Cire, Andre A. & van Hoeve, Willem-Jan, 2017. "Hybrid optimization methods for time-dependent sequencing problems," European Journal of Operational Research, Elsevier, vol. 259(3), pages 887-897.
- Gilani, Seyyed-Omid & Sattarvand, Javad & Hajihassani, Mohsen & Abdullah, Shahrum Shah, 2020. "A stochastic particle swarm based model for long term production planning of open pit mines considering the geological uncertainty," Resources Policy, Elsevier, vol. 68(C).
- Zeng, Lanyan & Liu, Shi Qiang & Kozan, Erhan & Corry, Paul & Masoud, Mahmoud, 2021. "A comprehensive interdisciplinary review of mine supply chain management," Resources Policy, Elsevier, vol. 74(C).
- Lamghari, Amina & Dimitrakopoulos, Roussos, 2016. "Network-flow based algorithms for scheduling production in multi-processor open-pit mines accounting for metal uncertainty," European Journal of Operational Research, Elsevier, vol. 250(1), pages 273-290.
- Albert Einstein Fernandes Muritiba & Tibérius O. Bonates & Stênio Oliveira Da Silva & Manuel Iori, 2021. "Branch-and-Cut and Iterated Local Search for the Weighted k -Traveling Repairman Problem: An Application to the Maintenance of Speed Cameras," Transportation Science, INFORMS, vol. 55(1), pages 139-159, 1-2.
- Cacchiani, Valentina & Contreras-Bolton, Carlos & Toth, Paolo, 2020. "Models and algorithms for the Traveling Salesman Problem with Time-dependent Service times," European Journal of Operational Research, Elsevier, vol. 283(3), pages 825-843.
- Miranda-Bront, Juan José & Méndez-Díaz, Isabel & Zabala, Paula, 2014. "Facets and valid inequalities for the time-dependent travelling salesman problem," European Journal of Operational Research, Elsevier, vol. 236(3), pages 891-902.
More about this item
Keywords
Earthworks; Road design; Terrain modelling; Meta-heuristics;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:238:y:2014:i:3:p:741-759. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.