Contact information of Elsevier
Serial Information
Download restrictions: Full text for ScienceDirect subscribers only
Editor: Stefan Minner
Series handle: RePEc:eee:proeco
ISSN: 09255273
Citations RSS feed: at CitEc
Impact factors
Access and download statisticsTop item:
Corrections
All material on this site has been provided by the respective publishers and authors. You can help
correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco. See general information about how to correct material in RePEc.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Content
January 2003, Volume 81-82, Issue 1
- 415-429 The detailed coordination problem in a two-level assembly system with stochastic lead times
by Tang, Ou & Grubbstrom, Robert W.
- 431-441 Partnership and negotiation support by joint optimal ordering/setup policies for JIT
by Kelle, Peter & Al-khateeb, Faisal & Anders Miller, Pam
- 443-459 Optimal control of a distributed service system with moving resources: Application to the fleet sizing and allocation problem
by Kochel, Peter & Kunze, Sophie & Nielander, Ulf
- 461-468 Restricted time-remembering policies for the inventory rationing problem
by Melchiors, Philip
- 469-481 Economic lot scheduling on multiple production lines with resource constraints
by Pesenti, Raffaele & Ukovich, Walter
- 483-494 A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems
by Grubbstrom, Robert W. & Wang, Zhiping
- 495-511 Joint replenishment multiproduct inventory problem with continuous production and discrete demands
by Rempala, Ryszarda
- 513-524 A stochastic inventory model of dual sourced supply chain with lead-time reduction
by Ryu, Si Wook & Lee, Kyung Keun
- 525-531 Optimal stopping and restarting production times for an EOQ model with deteriorating items and time-dependent partial backlogging
by Skouri, K. & Papachristos, S.
- 533-544 Competitive and cooperative policies for the vendor-buyer system
by Bylka, Stanislaw
- 545-553 Approximate optimization of a two-level distribution inventory system
by Axsater, Sven
- 555-558 A model of crop planning under uncertainty in agricultural management
by Itoh, Takeshi & Ishii, Hiroaki & Nanseki, Teruaki
- 559-564 Minimum number of warehouses for storing simultaneously compatible products
by Kalfakakou, Ria & Katsavounis, Stefanos & Tsouros, Kostas
- 565-571 A model for evaluating supplier-owned inventory strategy
by Piplani, Rajesh & Viswanathan, S.
- 573-588 Capacitated two-indenture models for repairable item systems
by Zijm, W. Henk & Avsar, Zeynep Muge
- 589-595 Prediction of the demand of the railway sleepers: A simulation model for replacement strategies
by Yun, Won Young & Ferreira, Luis
- 597-607 A model to evaluate inventory costs in a remanufacturing environment
by Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik
- 2015-2213 Manufacturing strategy and competitiveness
by Demeter, Krisztina
December 2002, Volume 80, Issue 3
- 201-212 Transshipments: An emerging inventory recourse to achieve supply chain leagility
by Herer, Yale T. & Tzur, Michal & Yucesan, Enver
- 213-230 Optimization of the machining economics problem under the failure replacement strategy
by Shabtay, Dvir & Kaspi, Moshe
- 231-248 A two-stage model for the design of supply chain networks
by Cakravastia, Andi & Toha, Isa S. & Nakamura, Nobuto
- 249-263 Quantifying the benefits of breaking bulk in retail operations
by Ketzenberg, Michael & Metters, Richard & Vargas, Vicente
- 265-277 A robustness study of a multi-echelon inventory model via simulation
by Tee, Yeu-San & Rossetti, Manuel D.
- 279-294 Non-parametric production analysis in non-competitive environments
by Cherchye, Laurens & Kuosmanen, Timo & Post, Thierry
November 2002, Volume 80, Issue 2
November 2002, Volume 80, Issue 1
- 1-2 Innovation of technology management
by Tuominen, Markku & Torkkeli, Marko
- 3-10 SMART: System for the development, management and support of strategic alliances
by Bitran, Iain & Bitran, Joseph & Conn, Steffen & Nagel, Arie & Nicholls, Harry
- 11-29 The e-skip-gen effect. The emergence of a cybercentric management model and the F2B market segment for industry
by Gordon, Lansing Alexander
- 31-37 Innovation quality--a conceptual framework
by Haner, Udo-Ernst
- 39-47 Attaining world-class R&D by benchmarking buyer-supplier relationships
by Hurmelinna, Pia & Peltola, Satu & Tuimala, Jarno & Virolainen, Veli-Matti
- 49-55 Knowledge creation through a project review process in software production
by Kess, P. & Haapasalo, H.
- 57-64 The role of tacit knowledge in innovation processes of small technology companies
by Koskinen, Kaj U. & Vanharanta, Hannu
- 65-83 Dynamic capability view in terms of real options
by Kylaheiko, K. & Sandstrom, J. & Virkkunen, V.
- 85-103 Role of careful customer need assessment in product innovation management--empirical analysis
by Karkkainen, H. & Elfvengren, K.
- 105-117 Success factors regarding the implementation of ICT investment projects
by Milis, Koen & Mercken, Roger
- 119-128 Applying quality award criteria in R&D project assessment
by Ojanen, Ville & Piippo, Petteri & Tuominen, Markku
October 2002, Volume 79, Issue 3
- 163-169 Scheduling jobs with values exponentially deteriorating over time
by Voutsinas, Theodore G. & Pappis, Costas P.
- 171-183 The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
by Chang, Pei-Chann & Hsieh, Jih-Chang & Lin, Shui-Geng
- 185-196 A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems
by Chung, Chia-Shin & Flynn, James & Kirca, Omer
- 197-208 A comprehensive bibliography on justification of advanced manufacturing systems
by Raafat, Feraidoon
- 209-230 Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems
by Sleptchenko, A. & van der Heijden, M. C. & van Harten, A.
- 231-260 New product warranty: A literature review
by Murthy, D. N. P. & Djamaludin, I.
- 261-278 Capacity utilisation and profitability: A decomposition of short-run profit efficiency
by Coelli, Tim & Grifell-Tatje, Emili & Perelman, Sergio
- 279-299 The impact of management accounting, product structure, product mix algorithm, and planning horizon on manufacturing performance
by Lea, Bih-Ru & Fredendall, Lawrence D.
- 303-316 A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders
by Lau, Amy Hing-Ling & Lau, Hon-Shiang
September 2002, Volume 79, Issue 2
- 85-92 Economic design of control chart for trended processes
by Cai, D. Q. & Xie, M. & Goh, T. N. & Tang, X. Y.
- 93-100 Process optimization via neural network metamodeling
by Chambers, M. & Mount-Campbell, C. A.
- 101-111 A fuzzy multiple objective programming approach for the selection of a flexible manufacturing system
by Karsak, E. Ertugrul & Kuzgunkaya, Onur
- 113-120 Real-time dynamic shop floor scheduling using Evolutionary Algorithms
by Kaschel, J. & Teich, Tobias & Zacher, Bernd
- 121-141 A continuous time inventory model for a product recovery system with multiple options
by Kleber, Rainer & Minner, Stefan & Kiesmuller, Gudrun
- 143-159 MAIC: A data and knowledge-based system for supporting the maintenance of chemical plant
by Pieri, Giovani & Klein, Michel R. & Milanese, Mario
September 2002, Volume 79, Issue 1
- 1-14 Filling a gap in traditional transaction cost economics: : Towards transaction benefits-based analysis
by Blomqvist, K. & Kylaheiko, K. & Virolainen, V. -M.
- 15-31 A cost model of industrial maintenance for profitability analysis and benchmarking
by Komonen, Kari
- 33-43 The role of cost management in network relationships
by Kulmala, Harri I. & Paranko, Jari & Uusi-Rauva, Erkki
- 45-55 A cost and operations based product heterogeneity index
by Ocampo y Vilas, Carlos & Vandaele, Nico
- 57-66 The effects of customization on spare part business: A case study in the metal industry
by Suomala, Petri & Sievanen, Matti & Paranko, Jari
- 67-73 On the non-optimality of the average cost approach for inventory models with remanufacturing
by Teunter, Ruud & van der Laan, Erwin
- 75-82 Activity-based costing and process modeling for cost-conscious product design: A case study in a manufacturing company
by Tornberg, Katja & Jamsen, Miikka & Paranko, Jari
August 2002, Volume 78, Issue 3
- 223-237 An approach to the design of a manufacturing cell under economic considerations
by Cabrera-Rios, Mauricio & Mount-Campbell, Clark A. & Irani, Shahrukh A.
- 239-253 Inventory models with random yield in a random environment
by Erdem, Asli Sencer & Ozekici, Suleyman
- 255-270 An optimization model for refinery production scheduling
by Gothe-Lundgren, Maud & T. Lundgren, Jan & A. Persson, Jan
- 271-285 Modelling flow and jobbing shops as a queueing network for workload control
by Haskose, A. & Kingsman, B. G. & Worthington, D.
- 287-293 Stationary optimal lengths for the plant renewal problem
by Luciano, E. & Peccati, L.
- 295-310 Developing a new world class model for small and medium sized make-to-order companies
by Muda, Shaladdin & Hendry, Linda
- 311-322 Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products
by Pongcharoen, P. & Hicks, C. & Braiden, P. M. & Stewardson, D. J.
- 323-334 Planning and replanning the master production schedule under demand uncertainty
by Tang, Ou & Grubbstrom, Robert W.
- 335-343 How to release orders in order to minimise system inventory and system nervousness?
by van Donselaar, K. H. & Gubbels, B. J.
July 2002, Volume 78, Issue 2
- 119-131 Input-output models for the analysis of a local/global supply chain
by Albino, Vito & Izzo, Carmen & Kuhtz, Silvana
- 133-144 Transfer function analysis of forecasting induced bullwhip in supply chains
by Dejonckheere, J. & Disney, S. M. & Lambrecht, M. R. & Towill, D. R.
- 145-152 A model for supply planning under lead time uncertainty
by Dolgui, Alexandre & Ould-Louly, Mohamed-Aly
- 153-161 Inventory management in supply chains: a reinforcement learning approach
by Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo
- 163-175 Supply chain simulation - a tool for education, enhancement and endeavour
by Holweg, Matthias & Bicheno, John
- 177-185 Lateral coordination in a logistics outsourcing relationship
by Huiskonen, Janne & Pirttila, Timo
- 187-195 An analytic approach to production capacity allocation and supply chain design
by Korpela, Jukka & Kylaheiko, Kalevi & Lehmusvaara, Antti & Tuominen, Markku
- 197-206 Environmental control for process improvement and process efficiency in supply chain management - the case of the meat chain
by Schiefer, Gerhard
- 207-220 Planning and optimization of hub-and-spoke transportation networks of cooperative third-party logistics providers
by Zapfel, Gunther & Wasner, Michael
July 2002, Volume 78, Issue 1
- 1-11 Incentive plans for productive efficiency, innovation and learning
by Agrell, Per J. & Bogetoft, Peter & Tind, Jorgen
- 13-28 Valuation of product-mix flexibility using real options
by Bengtsson, Jens & Olhager, Jan
- 29-35 Assessment of quality and maturity level of R&D
by Berg, Pekka & Leinonen, Mikko & Leivo, Virpi & Pihlajamaa, Jussi
- 37-44 The impact of worker differences on production system output
by Buzacott, John A.
- 45-55 Risk analysis and assessment in network environments: A dyadic case study
by Hallikas, Jukka & Virolainen, Veli-Matti & Tuominen, Markku
- 57-67 Total productivity measurement based on partial productivity ratios
by Hannula, Mika
- 69-78 Analyzing productivity with the enabler-effect map
by Lillrank, Paul & Holopainen, Sami & Paavola, Teemu
- 79-90 The problem of managing product development engineers: Can the balanced scorecard be an answer?
by Sandstrom, Jaana & Toivanen, Jouko
- 91-98 Representation and calculation of economic uncertainties: Intervals, fuzzy numbers, and probabilities
by Schjaer-Jacobsen, Hans
- 99-107 Improving the reliability of the customer order fulfilment process in a product identification company
by Turner, T. J. & Mendibil, K. & Bititci, U. S. & Daisley, P. & Breen, T. H. J.
- 109-116 Valuing exploration and production projects by means of option pricing theory
by Zettl, Martin
June 2002, Volume 77, Issue 3
- 189-190 Igls 2000
by Grubbstrom, Robert W. & Hinterhuber, Hans H.
- 191-203 The technology dimension of strategic leadership : The leadership challenge for production economists
by Hinterhuber, Hans H. & Friedrich, Stephan A.
- 205-218 Team roles in business process re-engineering
by Launonen, Martti & Kess, Pekka
- 219-229 Success factors for cooperative ventures in innovation and production systems
by Marxt, Christian & Link, Patrick
- 231-245 Performance simulation of supply chain designs
by Persson, Fredrik & Olhager, Jan
- 247-257 Make vs. buy decisions: A process incorporating multi-attribute decision-making
by Platts, K. W. & Probert, D. R. & Canez, L.
- 259-269 Integrated design and production of multi-storey timber frame houses - production effects caused by customer-oriented design
by Stehn, Lars & Bergstrom, Max
- 271-284 The contribution of technology selection to core competencies
by Torkkeli, Marko & Tuominen, Markku
- 285-298 Performance improvement theory
by Vits, Jeroen & Gelders, Ludo
- 299-313 A framework for maintenance concept development
by Waeyenbergh, Geert & Pintelon, Liliane
May 2002, Volume 77, Issue 2
- 95-111 Coordinating pricing and inventory replenishment policies for one wholesaler and one or more geographically dispersed retailers
by Boyaci, Tamer & Gallego, Guillermo
- 113-130 Incorporating transportation costs into inventory replenishment decisions
by Swenseth, Scott R. & Godfrey, Michael R.
- 131-143 Determining manufacturing batch sizes for a lumpy delivery system with trend demand
by Diponegoro, Ahmad & Sarker, Bhaba R.
- 145-158 A possibilistic decision support system for imprecise mathematical programming problems
by Jensen, Hector A. & Maturana, Sergio
- 159-171 A list-based threshold accepting method for job shop scheduling problems
by Tarantilis, C. D. & Kiranoudis, C. T.
- 173-185 RETRACTED: A comparison of different methods for estimating the average inventory level in a (Q,R) system with backorders
by Lau, Amy Hing-Ling & Lau, Hon-Shiang
May 2002, Volume 77, Issue 1
- 1-15 Supply chain coordination with uncertain just-in-time delivery
by Zimmer, Kirstin
- 17-23 Economic design of -control charts with Weibull in-control times when there are multiple assignable causes
by Chen, Yun-Shiow & Yang, Yit-Ming
- 25-38 Determining load patterns for the delivery of assembly components under JIT systems
by Kim, Kap Hwan & Kim, Jae-Boum
- 39-51 Hierarchical simulation of complex production systems by coupling of models
by Zulch, Gert & Jonsson, Uwe & Fischer, Jorg
- 53-61 On the relaxation of multi-level dynamic lot-sizing models
by Voros, Jozsef
- 63-70 Resource allocation in a few industries: Determinants and trends
by Segelod, Esbjorn
- 71-83 New heuristics to minimize total completion time in m-machine flowshops
by Allahverdi, Ali & Aldowaisan, Tariq
- 85-87 Note on: Economic production quantity model for items with imperfect quality - a practical approach
by Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo
- 89-90 Note on: An optimal batch size for a production system operating under periodic delivery policy
by Sarker, Ruhul A.
- 91-91 Note: Reply to R.A. Sarker
by Goyal, S. K.
April 2002, Volume 76, Issue 3
- 219-228 Grouping of parts and machines in presence of alternative process routes by genetic algorithm
by Uddin, Muhammad Kutub & Shanker, Kripa
- 229-242 The dual-phase learning-forgetting model
by Jaber, M. Y. & Kher, H. V.
- 243-256 Product due date assignment for complex assemblies
by Song, D. P. & Hicks, C. & Earl, C. F.
- 257-264 The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
by Ben-Daya, Mohamed
- 265-279 Parallel machine scheduling to minimize total tardiness
by Yalaoui, Farouk & Chu, Chengbin
- 281-292 A management design approach to a simple flexible assembly system
by Nakase, Nobuaki & Yamada, Tetsuo & Matsui, Masayuki
- 293-312 Technical efficiency and productivity change of China's iron and steel industry
by Ma, Jinlong & Evans, David G. & Fuller, Robert J. & Stewart, Donald F.
March 2002, Volume 76, Issue 2
- 111-120 Exact solution of inventory replenishment policy for a linear trend in demand - two-equation model
by Lo, Wen-Yang & Tsai, Chih-Hung & Li, Rong-Kwei
- 121-133 Designing performance analysis and IDEF0 for enterprise modelling in BPR
by Kim, Soung-Hie & Jang, Ki-Jin
- 135-145 The impact of flexible process capability on the product-process matrix: an empirical examination
by Ariss, Sonny S. & Zhang, Qingyu
- 147-157 Optimal job-shop scheduling with random operations and cost objectives
by Golenko-Ginzburg, Dimitri & Gonik, Aharon
- 159-176 Supply chains within industrial districts: A theoretical framework
by Carbonara, Nunzia & Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo
- 177-188 Bias in Malmquist index and cost function productivity measurement in banking
by Lozano-Vivas, Ana & Humphrey, David B.
- 189-199 Variable sampling interval control charts with an improved switching rule
by Bai, D. S. & Lee, K. T.
- 201-215 An overview of recent literature on spare parts inventories
by Kennedy, W. J. & Wayne Patterson, J. & Fredendall, Lawrence D.
March 2002, Volume 76, Issue 1
- 1-12 A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales
by Ouyang, Liang-Yuh & Chang, Hung-Chi
- 13-25 Analytic expressions for the optimal dwell point in an automated storage/retrieval system
by van den Berg, Jeroen P.
- 27-38 The impact of management and employees on cellular manufacturing implementation
by Olorunniwo, Festus & Udo, Godwin
- 39-51 Determining key capabilities of a firm using analytic hierarchy process
by Hafeez, Khalid & Zhang, YanBing & Malak, Naila
- 53-59 Investment and production costs for fishmeal plants in developing and developed countries
by Zugarramurdi, A. & Parin, M. A. & Carrizo, G. A. & Gadaleta, L. & Lupin, H. M.
- 61-85 Knowledge capital and performance heterogeneity: : A firm-level innovation study
by Loof, Hans & Heshmati, Almas
- 87-98 Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems
by Forza, Cipriano & Salvador, Fabrizio
- 99-108 A fuzzy logic based methodology to rank shop floor dispatching rules
by Petroni, Alberto & Rizzi, Antonio
February 2002, Volume 75, Issue 3
- 231-243 Layout design for a paper reel warehouse: A two-stage heuristic approach
by Lai, K. K. & Xue, Jue & Zhang, Guoqing
- 245-256 Technological innovation and employment: Data from a decade in Spain
by Sacristan Diaz, Macarena & Quiros Tomas, F. Javier
- 257-266 On the necessity of a disposal option for returned items that can be remanufactured
by Teunter, Ruud H. & Vlachos, Dimitrios
- 267-285 An integrated model for part-operation allocation and investments in CNC technology
by Bokhorst, Jos A. C. & Slomp, Jannes & Suresh, Nallan C.
- 287-304 Modeling manufacturing and marketing options in international operations
by Hadjinicola, George C. & Kumar, K. Ravi
- 305-322 The evolution of a cellular manufacturing system - a longitudinal case study
by Molleman, Eric & Slomp, Jannes & Rolefes, Samantha
January 2002, Volume 75, Issue 1-2
- 1-6 Information technology/information systems in 21st century manufacturing
by Gunasekaran, A. & McGaughey, Ronald
- 7-19 Analysis of information flows to enhance the coordination of production processes
by Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara
- 21-31 Evolution of brokering paradigms in e-commerce enabled manufacturing
by Sarkis, Joseph & Sundarraj, R. P.
- 33-45 The use of the Internet in Hong Kong: Manufacturing vs. service
by Cheng, Chun Hung & Cheung, Waiman & Chang, Man Kit
- 47-55 Application of SAP R/3 in on-line inventory control
by Mandal, Purnendu & Gunasekaran, A.
- 57-68 Defining a framework for information systems requirements for agile manufacturing
by Coronado M., Adrian E. & Sarhadi, Mansoor & Millar, Colin
- 69-81 Agent-based e-commerce in case of mass customization
by Turowski, Klaus
- 83-96 Successful implementation of ERP projects: Evidence from two case studies
by Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A.
- 97-112 IT governance and management in large Australian organisations
by Sohal, Amrik S. & Fitzpatrick, Paul
- 113-126 A framework to develop an enterprise information portal for contract manufacturing
by Chan, Michael F. S. & Chung, Walter W. C.
- 127-134 Information technology enabled meta-management for virtual organizations
by Khalil, Omar & Wang, Shouhong
- 135-146 Business-to-business data sharing: A source for integration of supply chains
by Stefansson, Gunnar
- 147-159 The virtual manufacturing paradigm: The impact of IT/IS outsourcing on manufacturing strategy
by Offodile, O. Felix & Abdel-Malek, Layek L.
- 161-172 A real-time information system for multivariate statistical process control
by Singh, Rahul & Gilbreath, Glenn
- 173-183 Web-based knowledge management for sharing product data in virtual enterprises
by Yoo, Sang Bong & Kim, Yeongho
- 185-197 E-commerce and its impact on operations management
by Gunasekaran, A. & Marri, H. B. & McGaughey, R. E. & Nebhwani, M. D.
- 199-211 Applying concepts of fuzzy cognitive mapping to model: The IT/IS investment evaluation process
by Irani, Zahir & Sharif, Amir & Love, Peter E. D. & Kahraman, Cengiz
- 213-228 Managing IT infrastructure standardisation in the networked manufacturing firm
by Akkermans, H. A. & van der Horst, H.
December 2001, Volume 74, Issue 1-3
- 1-4 Productive systems: Strategy, control, and management
by Artiba, Abdelhakim
- 5-20 A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context
by Vicens, E. & Alemany, M. E. & Andres, C. & Guarch, J. J.
- 21-32 Multi-site planning: A transshipment problem
by Guinet, Alain
- 33-48 An integrated production planning and scheduling system for hybrid flowshop organizations
by Riane, F. & Artiba, A. & Iassinovski, S.
- 49-61 The finite horizon economic lot sizing problem in job shops: : the multiple cycle approach
by Ouenniche, J. & Bertrand, J. W. M.
- 63-75 A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
by Artigues, Christian & Roubellat, Francois
- 77-83 Exact distribution of the makespan in a two machines flow shop with two kinds of jobs
by Baptiste, Pierre & Jacquemard, Claude
- 85-91 Optimal solution for a two-product dynamic scheduling problem in a just-in-time environment
by Benyoucef, Lyes & Frein, Yannick & Penz, Bernard
- 93-101 A bicriterion approach to deal with a constrained single-objective problem
by Dhaenens-Flipo, Clarisse
- 103-113 On the optimal release time of jobs with random processing times, with extensions to other criteria
by Elmaghraby, Salah E.
- 115-123 Production indices obtained by a myopic policy for non-Markovian dynamics
by Hongler, Max-Olivier & Ciprut, Philippe
- 125-134 Job shop scheduling with alternative process plans
by Thomalla, Christoph S.
- 135-146 A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line
by Cavory, G. & Dupas, R. & Goncalves, G.
- 147-155 Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment
by Dohi, Tadashi & Okamura, Hiroyuki & Osaki, Shunji
- 157-161 Optimal just-in-time buffer inventory for regular preventive maintenance
by Salameh, M. K. & Ghattas, R. E.
- 163-173 Buffer allocation and required availability in a transfer line with unreliable machines
by Sorensen, Kenneth & Janssens, Gerrit K.
- 175-182 Manufacturing cells design with flexible routing capability in presence of unreliable machines
by Diallo, Mohamadou & Pierreval, Henri & Quilliot, Alain
- 183-189 Spare provisioning strategy for preventively replaced systems subjected to random failure
by Chelbi, Anis & Ait-Kadi, Daoud
- 191-200 Economic design of a Vp chart
by De Magalhaes, Maysa S. & Epprecht, Eugenio K. & Costa, Antonio F. B.
- 201-212 The role of qualitative methods in production management research
by Beach, R. & Muhlemann, A. P. & Price, D. H. R. & Paterson, A. & Sharp, J. A.
- 213-224 Manufacturing flexibility and real options: A review
by Bengtsson, Jens
- 225-238 Virtual enterprise - organisation, evolution and control
by Martinez, M. T. & Fouletier, P. & Park, K. H. & Favrel, J.
- 239-259 A network approach to operate agile manufacturing systems
by Frayret, Jean-Marc & D&rsquo & Amours, Sophie & Montreuil, Benoit & Cloutier, Louis
- 261-268 Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions
by van Ooijen, H. P. G. & Bertrand, J. W. M.
- 269-277 Optimal moves of the material handling system in a robotic cell
by Brauner, Nadia & Finke, Gerd
- 279-292 Automatic notation of the physical structure of a flexible manufacturing system
by Tacquard, Claudine & Martineau, Patrick
- 293-301 Pattern generating procedure for the cutting stock problem
by Suliman, Saad M. A.
- 303-312 The self-consistent parametric inference algorithm (SPI): Optimisation in continuous search space
by Bodmann, Bardo E. J. & Gomez, Arthur T.
October 2001, Volume 73, Issue 3
- 203-215 An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction
by Woo, York Y. & Hsu, Shu-Lu & Wu, Soushan
- 217-226 An inventory control model using fuzzy logic
by Samanta, B. & Al-Araimi, S. A.
- 227-240 Coordinated replenishments with alternative supply sources in two-level supply chains
by Ng, C. T. & Li, Leon Y. O. & Chakhlevitch, K.
- 241-249 Optimal multiple delivery schedule for demand in logistic model
by Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo
- 251-259 Quality management and high performance work practices: Do they coexist?
by Bayo-Moriones, Alberto & Merino-Diaz de Cerio, Javier