The economic production lot-sizing problem with imperfect production processes and imperfect maintenance
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- אסתר טולידנו, 1998. "מקבלי דמי אבטלה, 1997," Working Papers 415, National Insurance Institute of Israel.
- אסתר טולדנו, 1997. "מקבלי דמי אבטלה בשנת 1996," Working Papers 521, National Insurance Institute of Israel.
- Pham, Hoang & Wang, Hongzhou, 1996. "Imperfect maintenance," European Journal of Operational Research, Elsevier, vol. 94(3), pages 425-438, November.
- M Ben-Daya & M Makhdoum, 1998. "Integrated production and quality model under various preventive maintenance policies," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 49(8), pages 840-853, August.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- K-L Hou, 2005. "Optimal production run length for deteriorating production system with a two-state continuous-time Markovian processes under allowable shortages," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 346-350, March.
- Ouyang, Liang-Yuh & Chang, Chun-Tao, 2013. "Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging," International Journal of Production Economics, Elsevier, vol. 144(2), pages 610-617.
- Chiu, Singa Wang, 2008. "Production lot size problem with failure in repair and backlogging derived without derivatives," European Journal of Operational Research, Elsevier, vol. 188(2), pages 610-615, July.
- Sarkar, Biswajit & Saren, Sharmila, 2016. "Product inspection policy for an imperfect production system with inspection errors and warranty cost," European Journal of Operational Research, Elsevier, vol. 248(1), pages 263-271.
- Rung-Hung Su & Ming-Wei Weng & Yung-Fu Huang, 2020. "Innovative maintenance problem in a two-stage production-inventory system with imperfect processes," Annals of Operations Research, Springer, vol. 287(1), pages 379-401, April.
- Jafari, L. & Makis, V., 2015. "Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring," International Journal of Production Economics, Elsevier, vol. 169(C), pages 156-168.
- A. Azadeh & M. Sheikhalishahi & S. Mortazavi & E. Ahmadi Jooghi, 2017. "Joint quality control and preventive maintenance strategy: a unique taguchi approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 123-134, March.
- Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
- Panda, D. & Kar, S. & Maity, K. & Maiti, M., 2008. "A single period inventory model with imperfect production and stochastic demand under chance and imprecise constraints," European Journal of Operational Research, Elsevier, vol. 188(1), pages 121-139, July.
- Gouiaa-Mtibaa, A. & Dellagi, S. & Achour, Z. & Erray, W., 2018. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 1-11.
- Biswajit Sarkar & Mehran Ullah & Seok-Beom Choi, 2019. "Joint Inventory and Pricing Policy for an Online to Offline Closed-Loop Supply Chain Model with Random Defective Rate and Returnable Transport Items," Mathematics, MDPI, vol. 7(6), pages 1-20, June.
- Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
- Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
- Peng, Hao & van Houtum, Geert-Jan, 2016. "Joint optimization of condition-based maintenance and production lot-sizing," European Journal of Operational Research, Elsevier, vol. 253(1), pages 94-107.
- Jiawen Hu & Zuhua Jiang & Hong Wang, 2017. "Joint Optimization of Production Plan and Preventive Maintenance Schedule by Stackelberg Game," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(04), pages 1-28, August.
- El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
- Bouslah, Bassem & Gharbi, Ali & Pellerin, Robert, 2013. "Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system," International Journal of Production Economics, Elsevier, vol. 144(1), pages 143-156.
- Hajji, A. & Mhada, F. & Gharbi, A. & Pellerin, R. & Malhamé, R., 2011. "Integrated product specifications and productivity decision making in unreliable manufacturing systems," International Journal of Production Economics, Elsevier, vol. 129(1), pages 32-42, January.
- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
- Fahimeh Shamsaei & Mathieu Vyve, 2017. "Solving integrated production and condition-based maintenance planning problems by MIP modeling," Flexible Services and Manufacturing Journal, Springer, vol. 29(2), pages 184-202, June.
- Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Nourelfath, Mustapha & Nahas, Nabil & Ben-Daya, Mohamed, 2016. "Integrated preventive maintenance and production decisions for imperfect processes," Reliability Engineering and System Safety, Elsevier, vol. 148(C), pages 21-31.
- Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
- Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
- Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Da Wen & Pan Ershun & Wang Ying & Liao Wenzhu, 2016. "An economic production quantity model for a deteriorating system integrated with predictive maintenance strategy," Journal of Intelligent Manufacturing, Springer, vol. 27(6), pages 1323-1333, December.
- de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
- Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
- Fakher, Hossein Beheshti & Nourelfath, Mustapha & Gendreau, Michel, 2018. "Integrating production, maintenance and quality: A multi-period multi-product profit-maximization model," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 191-201.
- El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
- David, Israel & Levi, Ofer, 2001. "Asset-selling problems with holding costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 317-321, May.
- Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
- Nasierowski, W. & Arcelus, F. J., 2003. "On the efficiency of national innovation systems," Socio-Economic Planning Sciences, Elsevier, vol. 37(3), pages 215-234, September.
- Liao, Gwo-Liang & Sheu, Shey-Huei, 2011. "Economic production quantity model for randomly failing production process with minimal repair and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 130(1), pages 118-124, March.
- Paulson Gjerde, Kathy A. & Slotnick, Susan A., 2004. "Quality and reputation: The effects of external and internal factors over time," International Journal of Production Economics, Elsevier, vol. 89(1), pages 1-20, May.
- Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
- Jaber, Mohamad Y. & Bonney, Maurice, 2001. "Economic lot sizing with learning and continuous time discounting: Is it significant?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 135-143, May.
- Freiesleben, Johannes, 2008. "A proposal for an economic quality loss function," International Journal of Production Economics, Elsevier, vol. 113(2), pages 1012-1024, June.
- Xiang, Yisha, 2013. "Joint optimization of X¯ control chart and preventive maintenance policies: A discrete-time Markov chain approach," European Journal of Operational Research, Elsevier, vol. 229(2), pages 382-390.
- Zhao, Xiujie & He, Shuguang & Xie, Min, 2018. "Utilizing experimental degradation data for warranty cost optimization under imperfect repair," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 108-119.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:76:y:2002:i:3:p:257-264. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.