The maximin criterion as an alternative to the expected value in the replanning issues
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Grubbstrom, Robert W. & Tang, Ou, 2000. "Modelling rescheduling activities in a multi-period production-inventory system," International Journal of Production Economics, Elsevier, vol. 68(2), pages 123-135, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Borgonovo, E. & Peccati, L., 2009. "Financial management in inventory problems: Risk averse vs risk neutral policies," International Journal of Production Economics, Elsevier, vol. 118(1), pages 233-242, March.
- Borgonovo, E. & Peccati, L., 2007. "Global sensitivity analysis in inventory management," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 302-313, July.
- Van Delft, Christian & Kerbache, Laoucine & El Khoury, Hiba, 2011. "Optimal strategy for stochastic product rollover under risk using CVAR analysis," HEC Research Papers Series 958, HEC Paris.
- Hvalica, Dusan & Bogataj, Ludvik, 2005. "Sensitivity results considering rescheduling by AND/OR graphs," International Journal of Production Economics, Elsevier, vol. 93(1), pages 455-464, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Meixell, Mary J., 2005. "The impact of setup costs, commonality, and capacity on schedule stability: An exploratory study," International Journal of Production Economics, Elsevier, vol. 95(1), pages 95-107, January.
- Borgonovo, E., 2008. "Differential importance and comparative statics: An application to inventory management," International Journal of Production Economics, Elsevier, vol. 111(1), pages 170-179, January.
- Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Reprint of “Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 113-125.
- Grubbström, Robert W. & Tang, Ou, 2012. "The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory," International Journal of Production Economics, Elsevier, vol. 140(2), pages 765-777.
- Hvalica, Dusan & Bogataj, Ludvik, 2005. "Sensitivity results considering rescheduling by AND/OR graphs," International Journal of Production Economics, Elsevier, vol. 93(1), pages 455-464, January.
- Grubbström, Robert W., 2021. "Production decisions based on absolute vs. relative risk aversion and their extensions," International Journal of Production Economics, Elsevier, vol. 234(C).
- Bogataj, David & Bogataj, Marija & Hudoklin, Domen, 2017. "Mitigating risks of perishable products in the cyber-physical systems based on the extended MRP model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 51-62.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:393-396. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.