A Network Flow Computation for Project Cost Curves

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Byung-Cheon Choi & Myoung-Ju Park, 2020. "Scheduling two projects with controllable processing times in a single-machine environment," Journal of Scheduling, Springer, vol. 23(5), pages 619-628, October.
  2. Yaghoubi, Saeed & Noori, Siamak & Azaron, Amir & Fynes, Brian, 2015. "Resource allocation in multi-class dynamic PERT networks with finite capacity," European Journal of Operational Research, Elsevier, vol. 247(3), pages 879-894.
  3. Thomas A. Roemer & Reza Ahmadi & Robert H. Wang, 2000. "Time-Cost Trade-Offs in Overlapped Product Development," Operations Research, INFORMS, vol. 48(6), pages 858-865, December.
  4. Collin Huse & Michael J. Brusco, 2021. "A Tale of Two Linear Programming Formulations for Crashing Project Networks," INFORMS Transactions on Education, INFORMS, vol. 22(1), pages 82-95, January.
  5. Choi, Byung-Cheon & Chung, Jibok, 2014. "Complexity results for the linear time–cost tradeoff problem with multiple milestones and completely ordered jobs," European Journal of Operational Research, Elsevier, vol. 236(1), pages 61-68.
  6. Martin Skutella, 1998. "Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem," Mathematics of Operations Research, INFORMS, vol. 23(4), pages 909-929, November.
  7. Joel Goh & Nicholas G. Hall, 2013. "Total Cost Control in Project Management via Satisficing," Management Science, INFORMS, vol. 59(6), pages 1354-1372, June.
  8. Perrone, G. & Roma, P. & Lo Nigro, G., 2010. "Designing multi-attribute auctions for engineering services procurement in new product development in the automotive context," International Journal of Production Economics, Elsevier, vol. 124(1), pages 20-31, March.
  9. Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
  10. Marcin Anholcer & Helena Gaspars-Wieloch, 2011. "Efficiency analysis of the Kaufmann and Dezbazeille algorithm for the deadline problem," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 21(1), pages 5-18.
  11. Vanhoucke, Mario, 2005. "New computational results for the discrete time/cost trade-off problem with time-switch constraints," European Journal of Operational Research, Elsevier, vol. 165(2), pages 359-374, September.
  12. A B Hafızoğlu & M Azizoğlu, 2010. "Linear programming based approaches for the discrete time/cost trade-off problem in project networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 676-685, April.
  13. Ahmadi, Reza & Roemer, Thomas A. & Wang, Robert H., 2001. "Structuring product development processes," European Journal of Operational Research, Elsevier, vol. 130(3), pages 539-558, May.
  14. Akkan, Can & Drexl, Andreas & Kimms, Alf, 2000. "Network decomposition-based lower and upper bounds for the discrete time-cost tradeoff problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 527, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
  15. Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
  16. De, Prabuddha & James Dunne, E. & Ghosh, Jay B. & Wells, Charles E., 1995. "The discrete time-cost tradeoff problem revisited," European Journal of Operational Research, Elsevier, vol. 81(2), pages 225-238, March.
  17. M. Vanhoucke, 2007. "An electromagnetic time/cost trade-off optimization in project scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 07/457, Ghent University, Faculty of Economics and Business Administration.
  18. S. Selcuk Erenguc & Taeho Ahn & Daniel G. Conway, 2001. "The resource constrained project scheduling problem with multiple crashable modes: An exact solution method," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 107-127, March.
  19. Jiao Wang & Kai Yang & Ruiqing Zhao, 2017. "The impact of decision criteria on deadline-based incentive contracts in project management," Journal of Intelligent Manufacturing, Springer, vol. 28(3), pages 643-655, March.
  20. Byung-Cheon Choi & Changmuk Kang, 2019. "A linear time–cost tradeoff problem with multiple milestones under a comb graph," Journal of Combinatorial Optimization, Springer, vol. 38(2), pages 341-361, August.
  21. Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
  22. Helena Gaspars, 2006. "A conception of a new algorithm for the project time-cost analysis," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 16(3-4), pages 5-27.
  23. Wolfram Wiesemann & Daniel Kuhn & Berç Rustem, 2012. "Multi-resource allocation in stochastic project scheduling," Annals of Operations Research, Springer, vol. 193(1), pages 193-220, March.
  24. Dharma Kwon, H. & Lippman, Steven A. & Tang, Christopher S., 2011. "Sourcing decisions of project tasks with exponential completion times: Impact on operating profits," International Journal of Production Economics, Elsevier, vol. 134(1), pages 138-150, November.
  25. Choi, Byung-Cheon & Park, Myoung-Ju, 2015. "A continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs," European Journal of Operational Research, Elsevier, vol. 244(3), pages 748-752.
  26. Morris A. Cohen & Jehoshua Eliashberg & Teck H. Ho, 2000. "An Analysis of Several New Product Performance Metrics," Manufacturing & Service Operations Management, INFORMS, vol. 2(4), pages 337-349, July.
  27. Azaron, Amir & Tavakkoli-Moghaddam, Reza, 2007. "Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1186-1200, August.
  28. Manuel A. Nunez & Lynn Kuo & I. Robert Chiang, 2022. "Managing risk-adjusted resource allocation for project time-cost tradeoffs," Annals of Operations Research, Springer, vol. 317(2), pages 717-735, October.
  29. Kolisch, R. & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Omega, Elsevier, vol. 29(3), pages 249-272, June.
  30. Nicole Megow & Rolf H. Möhring & Jens Schulz, 2011. "Decision Support and Optimization in Shutdown and Turnaround Scheduling," INFORMS Journal on Computing, INFORMS, vol. 23(2), pages 189-204, May.
  31. Hajdu M. & Isaac S., 2016. "Sixty years of project planning: history and future," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1499-1510, December.
  32. Ahn, Taeho & Erenguc, S. Selcuk, 1998. "The resource constrained project scheduling problem with multiple crashable modes: A heuristic procedure," European Journal of Operational Research, Elsevier, vol. 107(2), pages 250-259, June.
  33. R L Bregman, 2009. "Preemptive expediting to improve project due date performance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 120-129, January.
  34. V. Sireesha & N. Ravi Shankar, 2013. "A new approach to find project characteristics and multiple possible critical paths in a fuzzy project network," Fuzzy Information and Engineering, Springer, vol. 5(1), pages 69-85, March.
  35. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
  36. Kosztyán, Zsolt T. & Szalkai, István, 2018. "Hybrid time-quality-cost trade-off problems," Operations Research Perspectives, Elsevier, vol. 5(C), pages 306-318.
  37. Babu, A. J. G. & Suresh, Nalina, 1996. "Project management with time, cost, and quality considerations," European Journal of Operational Research, Elsevier, vol. 88(2), pages 320-327, January.
  38. Kosztyán, Zsolt T. & Pribojszki-Németh, Anikó & Szalkai, István, 2019. "Hybrid multimode resource-constrained maintenance project scheduling problem," Operations Research Perspectives, Elsevier, vol. 6(C).
  39. Azaron, Amir & Katagiri, Hideki & Sakawa, Masatoshi & Kato, Kosuke & Memariani, Azizollah, 2006. "A multi-objective resource allocation problem in PERT networks," European Journal of Operational Research, Elsevier, vol. 172(3), pages 838-854, August.
  40. Elmaghraby, Salah E., 1995. "Activity nets: A guided tour through some recent developments," European Journal of Operational Research, Elsevier, vol. 82(3), pages 383-408, May.
  41. Akkan, Can & Drexl, Andreas & Kimms, Alf, 2005. "Network decomposition-based benchmark results for the discrete time-cost tradeoff problem," European Journal of Operational Research, Elsevier, vol. 165(2), pages 339-358, September.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.