A Tale of Two Linear Programming Formulations for Crashing Project Networks
Author
Abstract
Suggested Citation
DOI: 10.1287/ited.2019.0236
Download full text from publisher
References listed on IDEAS
- D. R. Fulkerson, 1961. "A Network Flow Computation for Project Cost Curves," Management Science, INFORMS, vol. 7(2), pages 167-178, January.
- James E. Kelley, 1961. "Critical-Path Planning and Scheduling: Mathematical Basis," Operations Research, INFORMS, vol. 9(3), pages 296-320, June.
- De, Prabuddha & James Dunne, E. & Ghosh, Jay B. & Wells, Charles E., 1995. "The discrete time-cost tradeoff problem revisited," European Journal of Operational Research, Elsevier, vol. 81(2), pages 225-238, March.
- Cliff T. Ragsdale, 2003. "A New Approach to Implementing Project Networks in Spreadsheets," INFORMS Transactions on Education, INFORMS, vol. 3(3), pages 76-85, May.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Marcin Anholcer & Helena Gaspars-Wieloch, 2011. "Efficiency analysis of the Kaufmann and Dezbazeille algorithm for the deadline problem," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 21(1), pages 5-18.
- Vanhoucke, Mario, 2005.
"New computational results for the discrete time/cost trade-off problem with time-switch constraints,"
European Journal of Operational Research, Elsevier, vol. 165(2), pages 359-374, September.
- Mario Vanhoucke, 2002. "New computational results for the discrete time/cost trade-off problem with time-switch constraints," Vlerick Leuven Gent Management School Working Paper Series 2002-18, Vlerick Leuven Gent Management School.
- M. Vanhoucke, 2003. "New Computational Results For The Discrete Time/Cost Trade-Off Problem With Time-Switch Constraints," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 03/181, Ghent University, Faculty of Economics and Business Administration.
- Kolisch, R. & Padman, R., 2001.
"An integrated survey of deterministic project scheduling,"
Omega, Elsevier, vol. 29(3), pages 249-272, June.
- Kolisch, Rainer & Padman, R., 2001. "An integrated survey of deterministic project scheduling," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 8114, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- R L Bregman, 2009. "Preemptive expediting to improve project due date performance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 120-129, January.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
- Nicole Megow & Rolf H. Möhring & Jens Schulz, 2011. "Decision Support and Optimization in Shutdown and Turnaround Scheduling," INFORMS Journal on Computing, INFORMS, vol. 23(2), pages 189-204, May.
- Akkan, Can & Drexl, Andreas & Kimms, Alf, 2005. "Network decomposition-based benchmark results for the discrete time-cost tradeoff problem," European Journal of Operational Research, Elsevier, vol. 165(2), pages 339-358, September.
- Akkan, Can & Drexl, Andreas & Kimms, Alf, 2000. "Network decomposition-based lower and upper bounds for the discrete time-cost tradeoff problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 527, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Byung-Cheon Choi & Changmuk Kang, 2019. "A linear time–cost tradeoff problem with multiple milestones under a comb graph," Journal of Combinatorial Optimization, Springer, vol. 38(2), pages 341-361, August.
- Jiao Wang & Kai Yang & Ruiqing Zhao, 2017. "The impact of decision criteria on deadline-based incentive contracts in project management," Journal of Intelligent Manufacturing, Springer, vol. 28(3), pages 643-655, March.
- Wolfram Wiesemann & Daniel Kuhn & Berç Rustem, 2012. "Multi-resource allocation in stochastic project scheduling," Annals of Operations Research, Springer, vol. 193(1), pages 193-220, March.
- De, Prabuddha & James Dunne, E. & Ghosh, Jay B. & Wells, Charles E., 1995. "The discrete time-cost tradeoff problem revisited," European Journal of Operational Research, Elsevier, vol. 81(2), pages 225-238, March.
- Martin Skutella, 1998. "Approximation Algorithms for the Discrete Time-Cost Tradeoff Problem," Mathematics of Operations Research, INFORMS, vol. 23(4), pages 909-929, November.
- A B Hafızoğlu & M Azizoğlu, 2010. "Linear programming based approaches for the discrete time/cost trade-off problem in project networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 676-685, April.
- Helena Gaspars, 2006. "A conception of a new algorithm for the project time-cost analysis," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 16(3-4), pages 5-27.
- Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
- Perrone, G. & Roma, P. & Lo Nigro, G., 2010. "Designing multi-attribute auctions for engineering services procurement in new product development in the automotive context," International Journal of Production Economics, Elsevier, vol. 124(1), pages 20-31, March.
- Dharma Kwon, H. & Lippman, Steven A. & Tang, Christopher S., 2011. "Sourcing decisions of project tasks with exponential completion times: Impact on operating profits," International Journal of Production Economics, Elsevier, vol. 134(1), pages 138-150, November.
- Choi, Byung-Cheon & Park, Myoung-Ju, 2015. "A continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs," European Journal of Operational Research, Elsevier, vol. 244(3), pages 748-752.
More about this item
Keywords
project networks; crashing; linear programming; teaching project management;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orited:v:21:y:2021:i:2:p:82-95. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.