Time-Cost Trade-Offs in Overlapped Product Development
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.48.6.858.12396
Download full text from publisher
References listed on IDEAS
- Albert Y. Ha & Evan L. Porteus, 1995. "Optimal Timing of Reviews in Concurrent Design for Manufacturability," Management Science, INFORMS, vol. 41(9), pages 1431-1447, September.
- James E. Kelley, 1961. "Critical-Path Planning and Scheduling: Mathematical Basis," Operations Research, INFORMS, vol. 9(3), pages 296-320, June.
- Robert P. Smith & Steven D. Eppinger, 1997. "A Predictive Model of Sequential Iteration in Engineering Design," Management Science, INFORMS, vol. 43(8), pages 1104-1120, August.
- D. R. Fulkerson, 1961. "A Network Flow Computation for Project Cost Curves," Management Science, INFORMS, vol. 7(2), pages 167-178, January.
- Reza Ahmadi & Robert H. Wang, 1999. "Managing Development Risk in Product Design Processes," Operations Research, INFORMS, vol. 47(2), pages 235-246, April.
- Kanda, Arun & Rao, U. R. K., 1984. "A network flow procedure for project crashing with penalty nodes," European Journal of Operational Research, Elsevier, vol. 16(2), pages 174-182, May.
- Viswanathan Krishnan & Steven D. Eppinger & Daniel E. Whitney, 1997. "A Model-Based Framework to Overlap Product Development Activities," Management Science, INFORMS, vol. 43(4), pages 437-451, April.
- E. B. Berman, 1964. "Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions," Management Science, INFORMS, vol. 10(4), pages 734-745, July.
- Foldes, Stephan & Soumis, Francois, 1993. "PERT and crashing revisited: Mathematical generalizations," European Journal of Operational Research, Elsevier, vol. 64(2), pages 286-294, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
- Christian Terwiesch & Z. Justin Ren & Teck H. Ho & Morris A. Cohen, 2005. "An Empirical Analysis of Forecast Sharing in the Semiconductor Equipment Supply Chain," Management Science, INFORMS, vol. 51(2), pages 208-220, February.
- Qian, Yanjun & Xie, Min & Goh, Thong Ngee & Lin, Jun, 2010. "Optimal testing strategies in overlapped design process," European Journal of Operational Research, Elsevier, vol. 206(1), pages 131-143, October.
- Rauniar, Rupak & Doll, William & Rawski, Greg & Hong, Paul, 2008. "Shared knowledge and product design glitches in integrated product development," International Journal of Production Economics, Elsevier, vol. 114(2), pages 723-736, August.
- Foad Iravani & Sriram Dasu & Reza Ahmadi, 2012. "A Hierarchical Framework for Organizing a Software Development Process," Operations Research, INFORMS, vol. 60(6), pages 1310-1322, December.
- Morvarid Rahmani & Guillaume Roels & Uday S. Karmarkar, 2017. "Collaborative Work Dynamics in Projects with Co‐Production," Production and Operations Management, Production and Operations Management Society, vol. 26(4), pages 686-703, April.
- Golmohammadi, Amirmohsen & Kraft, Tim & Monemian, Seyedamin, 2024. "Setting the deadline and the penalty policy for a new environmental standard," European Journal of Operational Research, Elsevier, vol. 315(1), pages 88-101.
- Bernardo A. Huberman & Dennis M. Wilkinson, 2010. "Fluctuating Efforts and Interdependencies in Collaborative Work," Group Decision and Negotiation, Springer, vol. 19(2), pages 169-191, March.
- Nelson, Richard Graham & Azaron, Amir & Aref, Samin, 2016. "The use of a GERT based method to model concurrent product development processes," European Journal of Operational Research, Elsevier, vol. 250(2), pages 566-578.
- Bernardo A. Huberman & Dennis M. Wilkinson, 2005. "Performance Variability and Project Dynamics," Computational and Mathematical Organization Theory, Springer, vol. 11(4), pages 307-332, December.
- Yassine, Ali A. & Sreenivas, Ramavarapu S. & Zhu, Jian, 2008. "Managing the exchange of information in product development," European Journal of Operational Research, Elsevier, vol. 184(1), pages 311-326, January.
- Antonio J. Conejo & Nicholas G. Hall & Daniel Zhuoyu Long & Runhao Zhang, 2021. "Robust Capacity Planning for Project Management," INFORMS Journal on Computing, INFORMS, vol. 33(4), pages 1533-1550, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Thomas A. Roemer & Reza Ahmadi, 2004. "Concurrent Crashing and Overlapping in Product Development," Operations Research, INFORMS, vol. 52(4), pages 606-622, August.
- Nitindra R. Joglekar & Ali A. Yassine & Steven D. Eppinger & Daniel E. Whitney, 2001. "Performance of Coupled Product Development Activities with a Deadline," Management Science, INFORMS, vol. 47(12), pages 1605-1620, December.
- R L Bregman, 2009. "Preemptive expediting to improve project due date performance," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 120-129, January.
- Bregman, Robert L., 2009. "A heuristic procedure for solving the dynamic probabilistic project expediting problem," European Journal of Operational Research, Elsevier, vol. 192(1), pages 125-137, January.
- Morvarid Rahmani & Guillaume Roels & Uday S. Karmarkar, 2017. "Collaborative Work Dynamics in Projects with Co‐Production," Production and Operations Management, Production and Operations Management Society, vol. 26(4), pages 686-703, April.
- Marcin Anholcer & Helena Gaspars-Wieloch, 2011. "Efficiency analysis of the Kaufmann and Dezbazeille algorithm for the deadline problem," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 21(1), pages 5-18.
- Joglekar, Nitindra R., 2003. "Performance of coupled product development activities with a deadline," Working papers WP 4122-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Qian, Yanjun & Xie, Min & Goh, Thong Ngee & Lin, Jun, 2010. "Optimal testing strategies in overlapped design process," European Journal of Operational Research, Elsevier, vol. 206(1), pages 131-143, October.
- V. Krishnan & Karl T. Ulrich, 2001. "Product Development Decisions: A Review of the Literature," Management Science, INFORMS, vol. 47(1), pages 1-21, January.
- Brucker, Peter & Drexl, Andreas & Mohring, Rolf & Neumann, Klaus & Pesch, Erwin, 1999. "Resource-constrained project scheduling: Notation, classification, models, and methods," European Journal of Operational Research, Elsevier, vol. 112(1), pages 3-41, January.
- Choi, Byung-Cheon & Park, Myoung-Ju, 2015. "A continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs," European Journal of Operational Research, Elsevier, vol. 244(3), pages 748-752.
- Christian Terwiesch & Christoph H. Loch, 1999. "Measuring the Effectiveness of Overlapping Development Activities," Management Science, INFORMS, vol. 45(4), pages 455-465, April.
- A B Hafızoğlu & M Azizoğlu, 2010. "Linear programming based approaches for the discrete time/cost trade-off problem in project networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 676-685, April.
- Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
- Lin, Jun & Qian, Yanjun & Cui, Wentian & Goh, Thong Ngee, 2015. "An effective approach for scheduling coupled activities in development projects," European Journal of Operational Research, Elsevier, vol. 243(1), pages 97-108.
- Atif Açıkgöz & Irem Demirkan & Gary P. Latham & Cemil Kuzey, 2021. "The Relationship Between Unlearning and Innovation Ambidexterity with the Performance of New Product Development Teams," Group Decision and Negotiation, Springer, vol. 30(4), pages 945-982, August.
- Gülru F. Özkan-Seely & Cheryl Gaimon & Stylianos Kavadias, 2015. "Dynamic Knowledge Transfer and Knowledge Development for Product and Process Design Teams," Manufacturing & Service Operations Management, INFORMS, vol. 17(2), pages 177-190, May.
- Jeremy Hutchison-Krupat, 2018. "Communication, Incentives, and the Execution of a Strategic Initiative," Management Science, INFORMS, vol. 64(7), pages 3380-3399, July.
- Chakravarty, Amiya K., 2001. "Overlapping design and build cycles in product development," European Journal of Operational Research, Elsevier, vol. 134(2), pages 392-424, October.
- Sosa, Manuel E., 2003. "Factors that influence technical communication in distributed product development : an empirical study in the telecommunications industry," Working papers WP 4123-00., Massachusetts Institute of Technology (MIT), Sloan School of Management.
More about this item
Keywords
Design; Optimization; Algorithm; Product development;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:48:y:2000:i:6:p:858-865. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.