IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v34y1988i11p1380-1390.html
   My bibliography  Save this item

Determining Safety Stock in the Presence of Stochastic Lead Time and Demand

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
  2. Prak, Dennis & Teunter, Ruud & Syntetos, Aris, 2017. "On the calculation of safety stocks when demand is forecasted," European Journal of Operational Research, Elsevier, vol. 256(2), pages 454-461.
  3. Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2023. "A theoretical validation of the DDMRP reorder policy," Computational Management Science, Springer, vol. 20(1), pages 1-28, December.
  4. Achin Srivastav & Sunil Agrawal, 2020. "On a single item single stage mixture inventory models with independent stochastic lead times," Operational Research, Springer, vol. 20(4), pages 2189-2227, December.
  5. Bordley, Robert & Beltramo, Mark & Blumenfeld, Dennis, 1999. "Consolidating distribution centers can reduce lost sales," International Journal of Production Economics, Elsevier, vol. 58(1), pages 57-61, January.
  6. Dev, Navin K. & Shankar, Ravi & Swami, Sanjeev, 2020. "Diffusion of green products in industry 4.0: Reverse logistics issues during design of inventory and production planning system," International Journal of Production Economics, Elsevier, vol. 223(C).
  7. Dong, Yachao & Maravelias, Christos T., 2021. "Terminal inventory level constraints for online production scheduling," European Journal of Operational Research, Elsevier, vol. 295(1), pages 102-117.
  8. Roberto Rossi & S. Armagan Tarim & Ramesh Bollapragada, 2012. "Constraint-Based Local Search for Inventory Control Under Stochastic Demand and Lead Time," INFORMS Journal on Computing, INFORMS, vol. 24(1), pages 66-80, February.
  9. Iida, Tetsuo, 2015. "Benefits of leadtime information and of its combination with demand forecast information," International Journal of Production Economics, Elsevier, vol. 163(C), pages 146-156.
  10. Salal Humair & John D. Ruark & Brian Tomlin & Sean P. Willems, 2013. "Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization," Interfaces, INFORMS, vol. 43(5), pages 421-434, October.
  11. Chatfield, Dean C. & Pritchard, Alan M., 2018. "Crossover aware base stock decisions for service-driven systems," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 312-330.
  12. Lawrence W. Robinson & James R. Bradley & L. Joseph Thomas, 2001. "Consequences of Order Crossover Under Order-Up-To Inventory Policies," Manufacturing & Service Operations Management, INFORMS, vol. 3(3), pages 175-188, September.
  13. Sharfuddin Lisan, 2018. "Safety stock determination of uncertain demand and mutually dependent variables," International Journal of Business and Social Research, MIR Center for Socio-Economic Research, vol. 8(3), pages 1-11, March.
  14. Hasni, M. & Aguir, M.S. & Babai, M.Z. & Jemai, Z., 2019. "On the performance of adjusted bootstrapping methods for intermittent demand forecasting," International Journal of Production Economics, Elsevier, vol. 216(C), pages 145-153.
  15. Borochin, Paul, 2020. "The information content of real operating performance measures from the airline industry," Journal of Financial Markets, Elsevier, vol. 50(C).
  16. Yue Tan & Liyi Gu & Senyu Xu & Mingchao Li, 2024. "Supply Chain Inventory Management from the Perspective of “Cloud Supply Chain”—A Data Driven Approach," Mathematics, MDPI, vol. 12(4), pages 1-30, February.
  17. Kevin Weng, Z., 1999. "Risk-pooling over demand uncertainty in the presence of product modularity," International Journal of Production Economics, Elsevier, vol. 62(1-2), pages 75-85, May.
  18. Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
  19. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
  20. Govindan, Kannan, 2015. "The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory," European Journal of Operational Research, Elsevier, vol. 242(2), pages 402-423.
  21. Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
  22. Wanke, Peter F., 2012. "Product, operation, and demand relationships between manufacturers and retailers," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(1), pages 340-354.
  23. Ronald D. Fricker & Christopher A. Goodhart, 2000. "Applying a bootstrap approach for setting reorder points in military supply systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(6), pages 459-478, September.
  24. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
  25. Strijbosch, L.W.G. & Moors, J.J.A., 1998. "Inventory Control : The Impact of Unknown Demand Distribution," Research Memorandum 770, Tilburg University, School of Economics and Management.
  26. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
  27. Rossi, Roberto & Tarim, S. Armagan & Hnich, Brahim & Prestwich, Steven, 2010. "Computing the non-stationary replenishment cycle inventory policy under stochastic supplier lead-times," International Journal of Production Economics, Elsevier, vol. 127(1), pages 180-189, September.
  28. Strijbosch, L. W. G. & Moors, J. J. A., 2005. "The impact of unknown demand parameters on (R,S)-inventory control performance," European Journal of Operational Research, Elsevier, vol. 162(3), pages 805-815, May.
  29. Tyworth, John E., 2018. "A note on lead-time paradoxes and a tale of competing prescriptions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 139-150.
  30. Anne E. Lordahl & James H. Bookbinder, 1994. "Order‐statistic calculation, costs, and service in an (s, Q) inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 81-97, February.
  31. Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
  32. Lin, Chun-Ta & Chen, Yee Ming, 2009. "Hedging strategic flexibility in the distribution optimization problem," Omega, Elsevier, vol. 37(4), pages 826-837, August.
  33. Saoud, Patrick & Kourentzes, Nikolaos & Boylan, John E., 2022. "Approximations for the Lead Time Variance: a Forecasting and Inventory Evaluation," Omega, Elsevier, vol. 110(C).
  34. Disney, Stephen M. & Maltz, Arnold & Wang, Xun & Warburton, Roger D.H., 2016. "Inventory management for stochastic lead times with order crossovers," European Journal of Operational Research, Elsevier, vol. 248(2), pages 473-486.
  35. Garg, D. & Narahari, Y. & Viswanadham, N., 2006. "Achieving sharp deliveries in supply chains through variance pool allocation," European Journal of Operational Research, Elsevier, vol. 171(1), pages 227-254, May.
  36. Sheldon Jacobson & Edward Sewell & Ruben Proano, 2006. "An analysis of the pediatric vaccine supply shortage problem," Health Care Management Science, Springer, vol. 9(4), pages 371-389, November.
  37. Vernimmen, Bert & Dullaert, Wout & Willemé, Peter & Witlox, Frank, 2008. "Using the inventory-theoretic framework to determine cost-minimizing supply strategies in a stochastic setting," International Journal of Production Economics, Elsevier, vol. 115(1), pages 248-259, September.
  38. Tyworth, John E. & Zeng, Amy Zhaohui, 1998. "Estimating the effects of carrier transit-time performance on logistics cost and service," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(2), pages 89-97, February.
  39. Kumar, Anupam & Evers, Philip T., 2015. "Setting safety stock based on imprecise records," International Journal of Production Economics, Elsevier, vol. 169(C), pages 68-75.
  40. Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Discrete‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 131-153, January.
  41. Cobb, Barry R. & Johnson, Alan W. & Rumí, Rafael & Salmerón, Antonio, 2015. "Accurate lead time demand modeling and optimal inventory policies in continuous review systems," International Journal of Production Economics, Elsevier, vol. 163(C), pages 124-136.
  42. Juan Manuel Izar Landeta & Carmen Berenice Ynzunza Cortés & Orlando Guarneros García, 2016. "Lead time demand variability, safety stock and the inventory cost," Contaduría y Administración, Accounting and Management, vol. 61(3), pages 499-513, Julio-Sep.
  43. Sharfuddin Lisan, 2018. "Safety stock determination of uncertain demand and mutually dependent variables," International Journal of Business and Social Research, LAR Center Press, vol. 8(3), pages 1-11, March.
  44. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
  45. James R. Bradley & Lawrence W. Robinson, 2005. "Improved Base-Stock Approximations for Independent Stochastic Lead Times with Order Crossover," Manufacturing & Service Operations Management, INFORMS, vol. 7(4), pages 319-329, November.
  46. John E. Tyworth & Liam O'Neill, 1997. "Robustness of the normal approximation of lead‐time demand in a distribution setting," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(2), pages 165-186, March.
  47. Ying Zhang & Jayashankar M. Swaminathan, 2020. "Warehouse Location in An Emerging Country: A Win–Win Proposition?," Production and Operations Management, Production and Operations Management Society, vol. 29(6), pages 1487-1505, June.
  48. Das, Rubel & Hanaoka, Shinya, 2014. "Relief inventory modelling with stochastic lead-time and demand," European Journal of Operational Research, Elsevier, vol. 235(3), pages 616-623.
  49. John P. Saldanha & Bradley S. Price & Douglas J. Thomas, 2023. "A nonparametric approach for setting safety stock levels," Production and Operations Management, Production and Operations Management Society, vol. 32(4), pages 1150-1168, April.
  50. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
  51. Stephen C. Graves, 1999. "Addendum to "A Single-Item Inventory Model for a Nonstationary Demand Process"," Manufacturing & Service Operations Management, INFORMS, vol. 1(2), pages 174-174.
  52. Peyman Taki & Farnaz Barzinpour & Ebrahim Teimoury, 2016. "Risk-pooling strategy, lead time, delivery reliability and inventory control decisions in a stochastic multi-objective supply chain network design," Annals of Operations Research, Springer, vol. 244(2), pages 619-646, September.
  53. Chen, Youhua Frank, 2005. "Fractional programming approach to two stochastic inventory problems," European Journal of Operational Research, Elsevier, vol. 160(1), pages 63-71, January.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.