IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v62y1999i1-2p75-85.html
   My bibliography  Save this article

Risk-pooling over demand uncertainty in the presence of product modularity

Author

Listed:
  • Kevin Weng, Z.

Abstract

No abstract is available for this item.

Suggested Citation

  • Kevin Weng, Z., 1999. "Risk-pooling over demand uncertainty in the presence of product modularity," International Journal of Production Economics, Elsevier, vol. 62(1-2), pages 75-85, May.
  • Handle: RePEc:eee:proeco:v:62:y:1999:i:1-2:p:75-85
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(98)00226-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. David A. Collier, 1982. "Aggregate Safety Stock Levels and Component Part Commonality," Management Science, INFORMS, vol. 28(11), pages 1296-1303, November.
    2. Chand, Suresh & Ward, James E. & Kevin Weng, Z., 1994. "A parts selection model with one-way substitution," European Journal of Operational Research, Elsevier, vol. 73(1), pages 65-69, February.
    3. Gary D. Eppen & R. Kipp Martin, 1988. "Determining Safety Stock in the Presence of Stochastic Lead Time and Demand," Management Science, INFORMS, vol. 34(11), pages 1380-1390, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
    2. Avittathur, Balram & Biswas, Indranil, 2017. "A note on limited clearance sale inventory model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 647-653.
    3. Peeyush Vats & Gunjan Soni & Ajay Pal Singh Rathore & Surya Prakash Yadav, 2019. "A demand aggregation approach for inventory control in two echelon supply chain under uncertainty," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 840-868, September.
    4. Thyssen, Jesper & Israelsen, Poul & Jørgensen, Brian, 2005. "Activity Based Costing as a method for assessing the economics of modularization - a case study and beyond," Management Accounting Research Group Working Papers M-2005-04, University of Aarhus, Aarhus School of Business, Department of Business Studies.
    5. Edirisinghe, Chanaka & Atkins, Derek, 2017. "Lower bounding inventory allocations for risk pooling in two-echelon supply chains," International Journal of Production Economics, Elsevier, vol. 187(C), pages 159-167.
    6. Lau Antonio, K.W. & Yam, Richard C.M. & Tang, Esther, 2007. "The impacts of product modularity on competitive capabilities and performance: An empirical study," International Journal of Production Economics, Elsevier, vol. 105(1), pages 1-20, January.
    7. Kilpi, Jani & Töyli, Juuso & Vepsäläinen, Ari, 2009. "Cooperative strategies for the availability service of repairable aircraft components," International Journal of Production Economics, Elsevier, vol. 117(2), pages 360-370, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
    2. Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
    3. Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
    4. Wallace J. Hopp & Xiaowei Xu, 2005. "Product Line Selection and Pricing with Modularity in Design," Manufacturing & Service Operations Management, INFORMS, vol. 7(3), pages 172-187, August.
    5. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    6. Kumar, Anupam & Evers, Philip T., 2015. "Setting safety stock based on imprecise records," International Journal of Production Economics, Elsevier, vol. 169(C), pages 68-75.
    7. Chen, Youhua Frank, 2005. "Fractional programming approach to two stochastic inventory problems," European Journal of Operational Research, Elsevier, vol. 160(1), pages 63-71, January.
    8. Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2023. "A theoretical validation of the DDMRP reorder policy," Computational Management Science, Springer, vol. 20(1), pages 1-28, December.
    9. Dev, Navin K. & Shankar, Ravi & Swami, Sanjeev, 2020. "Diffusion of green products in industry 4.0: Reverse logistics issues during design of inventory and production planning system," International Journal of Production Economics, Elsevier, vol. 223(C).
    10. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    11. Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
    12. Sandun C. Perera & Suresh P. Sethi, 2023. "A survey of stochastic inventory models with fixed costs: Optimality of (s, S) and (s, S)‐type policies—Discrete‐time case," Production and Operations Management, Production and Operations Management Society, vol. 32(1), pages 131-153, January.
    13. Alfaro, José A. & Corbett, Charles J., 2000. "The value of SKU rationalization: the pooling effect under suboptimal inventory policies," DEE - Working Papers. Business Economics. WB 9917, Universidad Carlos III de Madrid. Departamento de Economía de la Empresa.
    14. Sharfuddin Lisan, 2018. "Safety stock determination of uncertain demand and mutually dependent variables," International Journal of Business and Social Research, LAR Center Press, vol. 8(3), pages 1-11, March.
    15. Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
    16. Jeet, Vishv & Kutanoglu, Erhan, 2018. "Part commonality effects on integrated network design and inventory models for low-demand service parts logistics systems," International Journal of Production Economics, Elsevier, vol. 206(C), pages 46-58.
    17. Stephen A. Smith & Narendra Agrawal, 2000. "Management of Multi-Item Retail Inventory Systems with Demand Substitution," Operations Research, INFORMS, vol. 48(1), pages 50-64, February.
    18. Thyssen, Jesper & Israelsen, Poul & Jørgensen, Brian, 2005. "Activity Based Costing as a method for assessing the economics of modularization - a case study and beyond," Management Accounting Research Group Working Papers M-2005-04, University of Aarhus, Aarhus School of Business, Department of Business Studies.
    19. Strijbosch, L.W.G. & Moors, J.J.A., 1998. "Inventory Control : The Impact of Unknown Demand Distribution," Other publications TiSEM bf5529df-b993-4816-9839-0, Tilburg University, School of Economics and Management.
    20. Mohebbi, E. & Choobineh, F. & Pattanayak, A., 2007. "Capacity-driven vs. demand-driven material procurement systems," International Journal of Production Economics, Elsevier, vol. 107(2), pages 451-466, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:62:y:1999:i:1-2:p:75-85. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.