Risk-pooling over demand uncertainty in the presence of product modularity
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- David A. Collier, 1982. "Aggregate Safety Stock Levels and Component Part Commonality," Management Science, INFORMS, vol. 28(11), pages 1296-1303, November.
- Chand, Suresh & Ward, James E. & Kevin Weng, Z., 1994. "A parts selection model with one-way substitution," European Journal of Operational Research, Elsevier, vol. 73(1), pages 65-69, February.
- Gary D. Eppen & R. Kipp Martin, 1988. "Determining Safety Stock in the Presence of Stochastic Lead Time and Demand," Management Science, INFORMS, vol. 34(11), pages 1380-1390, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
- Avittathur, Balram & Biswas, Indranil, 2017. "A note on limited clearance sale inventory model," International Journal of Production Economics, Elsevier, vol. 193(C), pages 647-653.
- Peeyush Vats & Gunjan Soni & Ajay Pal Singh Rathore & Surya Prakash Yadav, 2019. "A demand aggregation approach for inventory control in two echelon supply chain under uncertainty," OPSEARCH, Springer;Operational Research Society of India, vol. 56(3), pages 840-868, September.
- Thyssen, Jesper & Israelsen, Poul & Jørgensen, Brian, 2005. "Activity Based Costing as a method for assessing the economics of modularization - a case study and beyond," Management Accounting Research Group Working Papers M-2005-04, University of Aarhus, Aarhus School of Business, Department of Business Studies.
- Edirisinghe, Chanaka & Atkins, Derek, 2017. "Lower bounding inventory allocations for risk pooling in two-echelon supply chains," International Journal of Production Economics, Elsevier, vol. 187(C), pages 159-167.
- Lau Antonio, K.W. & Yam, Richard C.M. & Tang, Esther, 2007. "The impacts of product modularity on competitive capabilities and performance: An empirical study," International Journal of Production Economics, Elsevier, vol. 105(1), pages 1-20, January.
- Kilpi, Jani & Töyli, Juuso & Vepsäläinen, Ari, 2009. "Cooperative strategies for the availability service of repairable aircraft components," International Journal of Production Economics, Elsevier, vol. 117(2), pages 360-370, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
- Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
- Jayashankar M. Swaminathan & Sridhar R. Tayur, 1998. "Managing Broader Product Lines through Delayed Differentiation Using Vanilla Boxes," Management Science, INFORMS, vol. 44(12-Part-2), pages 161-172, December.
- Prak, Dennis & Teunter, Ruud & Syntetos, Aris, 2017. "On the calculation of safety stocks when demand is forecasted," European Journal of Operational Research, Elsevier, vol. 256(2), pages 454-461.
- Bordley, Robert & Beltramo, Mark & Blumenfeld, Dennis, 1999. "Consolidating distribution centers can reduce lost sales," International Journal of Production Economics, Elsevier, vol. 58(1), pages 57-61, January.
- Thyssen, Jesper & Israelsen, Poul & Jorgensen, Brian, 2006. "Activity-based costing as a method for assessing the economics of modularization--A case study and beyond," International Journal of Production Economics, Elsevier, vol. 103(1), pages 252-270, September.
- Wallace J. Hopp & Xiaowei Xu, 2005. "Product Line Selection and Pricing with Modularity in Design," Manufacturing & Service Operations Management, INFORMS, vol. 7(3), pages 172-187, August.
- Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
- Kumar, Anupam & Evers, Philip T., 2015. "Setting safety stock based on imprecise records," International Journal of Production Economics, Elsevier, vol. 169(C), pages 68-75.
- Shin, Hojung & Park, Soohoon & Lee, Euncheol & Benton, W.C., 2015. "A classification of the literature on the planning of substitutable products," European Journal of Operational Research, Elsevier, vol. 246(3), pages 686-699.
- Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
- Chen, Youhua Frank, 2005. "Fractional programming approach to two stochastic inventory problems," European Journal of Operational Research, Elsevier, vol. 160(1), pages 63-71, January.
- Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2023. "A theoretical validation of the DDMRP reorder policy," Computational Management Science, Springer, vol. 20(1), pages 1-28, December.
- Dev, Navin K. & Shankar, Ravi & Swami, Sanjeev, 2020. "Diffusion of green products in industry 4.0: Reverse logistics issues during design of inventory and production planning system," International Journal of Production Economics, Elsevier, vol. 223(C).
- Yigal Gerchak & Mordechai Henig, 1989. "Component commonality in assemble‐to‐order systems: Models and properties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(1), pages 61-68, February.
- N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
- Hsieh, Ying-Jiun, 2011. "Demand switching criteria for multiple products: An inventory cost analysis," Omega, Elsevier, vol. 39(2), pages 130-137, April.
- Zhang, Yi & Hua, Guowei & Cheng, T.C.E. & Zhang, Juliang & Fernandez, Vicenc, 2020. "Risk pooling through physical probabilistic selling," International Journal of Production Economics, Elsevier, vol. 219(C), pages 295-311.
- Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
- Hillier, Mark S., 2002. "Using commonality as backup safety stock," European Journal of Operational Research, Elsevier, vol. 136(2), pages 353-365, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:62:y:1999:i:1-2:p:75-85. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.