IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v115y2008i1p248-259.html
   My bibliography  Save this article

Using the inventory-theoretic framework to determine cost-minimizing supply strategies in a stochastic setting

Author

Listed:
  • Vernimmen, Bert
  • Dullaert, Wout
  • Willemé, Peter
  • Witlox, Frank

Abstract

No abstract is available for this item.

Suggested Citation

  • Vernimmen, Bert & Dullaert, Wout & Willemé, Peter & Witlox, Frank, 2008. "Using the inventory-theoretic framework to determine cost-minimizing supply strategies in a stochastic setting," International Journal of Production Economics, Elsevier, vol. 115(1), pages 248-259, September.
  • Handle: RePEc:eee:proeco:v:115:y:2008:i:1:p:248-259
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(08)00206-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Tadikamalla, Pandu R, 1984. "A comparison of several approximations to the lead time demand distribution," Omega, Elsevier, vol. 12(6), pages 575-581.
    2. Strijbosch, L. W. G. & Heuts, R. M. J., 1992. "Modelling (s, Q) inventory systems: Parametric versus non-parametric approximations for the lead time demand distribution," European Journal of Operational Research, Elsevier, vol. 63(1), pages 86-101, November.
    3. Eliezer Naddor, 1978. "Note--Sensitivity to Distributions in Inventory Systems," Management Science, INFORMS, vol. 24(16), pages 1769-1772, December.
    4. Chandrasekhar Das, 1976. "Approximate Solution to the (Q, r) Inventory Model for Gamma Lead Time Demand," Management Science, INFORMS, vol. 22(9), pages 1043-1047, May.
    5. Tyworth, John E. & Zeng, Amy Zhaohui, 1998. "Estimating the effects of carrier transit-time performance on logistics cost and service," Transportation Research Part A: Policy and Practice, Elsevier, vol. 32(2), pages 89-97, February.
    6. Heuts, R.M.J. & van Lieshout, J.T.H.C. & Baken, K., 1986. "An inventory model : What is the influence of the shape of the lead time demand distribution?," Research Memorandum FEW 205, Tilburg University, School of Economics and Management.
    7. Charles E. Clark, 1957. "Mathematical Analysis of an Inventory Case," Operations Research, INFORMS, vol. 5(5), pages 627-643, October.
    8. Johansen, Soren Glud & Thorstenson, Anders, 1993. "Optimal and approximate (Q, r) inventory policies with lost sales and gamma-distributed lead time," International Journal of Production Economics, Elsevier, vol. 30(1), pages 179-194, July.
    9. Cullinane, Kevin & Toy, Neal, 2000. "Identifying influential attributes in freight route/mode choice decisions: a content analysis," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 36(1), pages 41-53, March.
    10. Donald Gross & A. Soriano, 1969. "The Effect of Reducing Leadtime on Inventory Levels-Simulation Analysis," Management Science, INFORMS, vol. 16(2), pages 61-76, October.
    11. Gary D. Eppen & R. Kipp Martin, 1988. "Determining Safety Stock in the Presence of Stochastic Lead Time and Demand," Management Science, INFORMS, vol. 34(11), pages 1380-1390, November.
    12. Heuts, R.M.J. & van Lieshout, J.T.H.C. & Baken, K., 1986. "An inventory model : What is the influence of the shape of the lead time demand distribution?," Other publications TiSEM a72f9e6b-aecb-4355-b4dc-8, Tilburg University, School of Economics and Management.
    13. Frank Witlox & Els Vandaele, 2005. "Determining the Monetary Value of Quality Attributes in Freight Transportation Using a Stated Preference Approach," Transportation Planning and Technology, Taylor & Francis Journals, vol. 28(2), pages 77-92, April.
    14. Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
    15. Tadikamalla, Pandu R, 1979. "The lognormal approximation to the lead time demand in inventory control," Omega, Elsevier, vol. 7(6), pages 553-556.
    16. Bert Vernimmen & Frank Witlox, 2003. "The inventory-theoretic approach to modal choice in freight transport: literature review and case study," Brussels Economic Review, ULB -- Universite Libre de Bruxelles, vol. 46(2), pages 5-30.
    17. H. J. M. Moonen, 1962. "Het bepalen van bestelniveaus wanneer afname en levertijd gamma‐verdeeld resp. normaal‐verdeeld zijn," Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 16(1), pages 113-120, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guerrero, W.J. & Yeung, T.G. & Guéret, C., 2013. "Joint-optimization of inventory policies on a multi-product multi-echelon pharmaceutical system with batching and ordering constraints," European Journal of Operational Research, Elsevier, vol. 231(1), pages 98-108.
    2. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    3. Saldanha, John P., 2022. "Estimating the reorder point for a fill-rate target under a continuous review policy in the presence of non-standard lead-time demand distributions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    4. Minken, Harald & Johansen, Bjørn Gjerde, 2019. "A logistics cost function with explicit transport costs," Economics of Transportation, Elsevier, vol. 19(C), pages 1-1.
    5. Engebrethsen, Erna & Dauzère-Pérès, Stéphane, 2019. "Transportation mode selection in inventory models: A literature review," European Journal of Operational Research, Elsevier, vol. 279(1), pages 1-25.
    6. Cobb, Barry R. & Johnson, Alan W. & Rumí, Rafael & Salmerón, Antonio, 2015. "Accurate lead time demand modeling and optimal inventory policies in continuous review systems," International Journal of Production Economics, Elsevier, vol. 163(C), pages 124-136.
    7. Tyworth, John E. & Saldanha, John, 2014. "The lead-time reliability paradox and inconsistent value-of-reliability estimates," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 70(C), pages 76-85.
    8. Dullaert, Wout & Zamparini, Luca, 2013. "The impact of lead time reliability in freight transport: A logistics assessment of transport economics findings," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 49(1), pages 190-200.
    9. John P. Saldanha & Bradley S. Price & Douglas J. Thomas, 2023. "A nonparametric approach for setting safety stock levels," Production and Operations Management, Production and Operations Management Society, vol. 32(4), pages 1150-1168, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Rossetti, Manuel D. & Yasin Ünlü, 2011. "Evaluating the robustness of lead time demand models," International Journal of Production Economics, Elsevier, vol. 134(1), pages 159-176, November.
    2. Alp Akcay & Bahar Biller & Sridhar Tayur, 2011. "Improved Inventory Targets in the Presence of Limited Historical Demand Data," Manufacturing & Service Operations Management, INFORMS, vol. 13(3), pages 297-309, July.
    3. John E. Tyworth & Liam O'Neill, 1997. "Robustness of the normal approximation of lead‐time demand in a distribution setting," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(2), pages 165-186, March.
    4. Park, Changkyu, 2007. "An analysis of the lead time demand distribution derivation in stochastic inventory systems," International Journal of Production Economics, Elsevier, vol. 105(1), pages 263-272, January.
    5. Dullaert, Wout & Zamparini, Luca, 2013. "The impact of lead time reliability in freight transport: A logistics assessment of transport economics findings," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 49(1), pages 190-200.
    6. Anne E. Lordahl & James H. Bookbinder, 1994. "Order‐statistic calculation, costs, and service in an (s, Q) inventory system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 81-97, February.
    7. Konur, Dinçer & Campbell, James F. & Monfared, Sepideh A., 2017. "Economic and environmental considerations in a stochastic inventory control model with order splitting under different delivery schedules among suppliers," Omega, Elsevier, vol. 71(C), pages 46-65.
    8. Daniela Favaretto & Alessandro Marin & Marco Tolotti, 2023. "A theoretical validation of the DDMRP reorder policy," Computational Management Science, Springer, vol. 20(1), pages 1-28, December.
    9. Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
    10. John P. Saldanha & Bradley S. Price & Douglas J. Thomas, 2023. "A nonparametric approach for setting safety stock levels," Production and Operations Management, Production and Operations Management Society, vol. 32(4), pages 1150-1168, April.
    11. Strijbosch, L.W.G. & Heuts, R.M.J., 1991. "Investigating several alternatives for estimating the compound lead time demand in an (s,Q) inventory model," Other publications TiSEM 8e8edd3d-73ef-4203-a037-e, Tilburg University, School of Economics and Management.
    12. van der Duyn Schouten, F.A. & van Eijs, M.J.G. & Heuts, R.M.J., 1992. "The value of information in a fixed order quantity inventory system," Other publications TiSEM ded27036-a7f0-47c7-b799-c, Tilburg University, School of Economics and Management.
    13. van der Duyn Schouten, F.A. & van Eijs, M.J.G. & Heuts, R.M.J., 1992. "The value of information in a fixed order quantity inventory system," Research Memorandum FEW 568, Tilburg University, School of Economics and Management.
    14. Minken, Harald & Johansen, Bjørn Gjerde, 2019. "A logistics cost function with explicit transport costs," Economics of Transportation, Elsevier, vol. 19(C), pages 1-1.
    15. Turrini, Laura & Meissner, Joern, 2019. "Spare parts inventory management: New evidence from distribution fitting," European Journal of Operational Research, Elsevier, vol. 273(1), pages 118-130.
    16. Günay, Gürkan, 2023. "Shipment size and vehicle choice modeling for road freight transport: A geographical perspective," Transportation Research Part A: Policy and Practice, Elsevier, vol. 173(C).
    17. Tyworth, John E., 2018. "A note on lead-time paradoxes and a tale of competing prescriptions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 109(C), pages 139-150.
    18. Zhuo Zhang & Dezhi Zhang & Lóránt A. Tavasszy & Qinglin Li, 2020. "Multicriteria Intermodal Freight Network Optimal Problem with Heterogeneous Preferences under Belt and Road Initiative," Sustainability, MDPI, vol. 12(24), pages 1-24, December.
    19. Wanke, Peter F., 2008. "The uniform distribution as a first practical approach to new product inventory management," International Journal of Production Economics, Elsevier, vol. 114(2), pages 811-819, August.
    20. Hon‐Shiang Lau & Amy Hing‐Ling Lau, 2003. "Nonrobustness of the normal approximation of lead‐time demand in a (Q, R) system," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(2), pages 149-166, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:115:y:2008:i:1:p:248-259. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.