Work Continuity Constraints In Project Scheduling
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Shtub, Avraham & LeBlanc, Larry J. & Cai, Ziyong, 1996. "Scheduling programs with repetitive projects: A comparison of a simulated annealing, a genetic and a pair-wise swap algorithm," European Journal of Operational Research, Elsevier, vol. 88(1), pages 124-138, January.
- M. Vanhoucke & K. Van Osselaer, 2004. "Work Continuity In A Real-Life Schedule: The Westerschelde Tunnel," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 04/271, Ghent University, Faculty of Economics and Business Administration.
- De Reyck, Bert & Herroelen, willy, 1998. "A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations," European Journal of Operational Research, Elsevier, vol. 111(1), pages 152-174, November.
- Mario Vanhoucke & Erik Demeulemeester & Willy Herroelen, 2001. "On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints," Management Science, INFORMS, vol. 47(8), pages 1113-1121, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Khalied Hesham Hyari & Khaled El-Rayes & Mohammad El-Mashaleh, 2009. "Automated trade-off between time and cost in planning repetitive construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 27(8), pages 749-761.
- M. Vanhoucke, 2006. "An efficient hybrid search algorithm for various optimization problems," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 06/365, Ghent University, Faculty of Economics and Business Administration.
- M. Vanhoucke, 2007. "An electromagnetic time/cost trade-off optimization in project scheduling," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 07/457, Ghent University, Faculty of Economics and Business Administration.
- Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- He, Zhengwen & Wang, Nengmin & Jia, Tao & Xu, Yu, 2009. "Simulated annealing and tabu search for multi-mode project payment scheduling," European Journal of Operational Research, Elsevier, vol. 198(3), pages 688-696, November.
- M. Vanhoucke, 2006.
"A scatter search procedure for maximizing the net present value of a project under renewable resource constraints,"
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium
06/417, Ghent University, Faculty of Economics and Business Administration.
- Vanhoucke, M., 2006. "A scatter search procedure for maximizing the net present value of a project under renewable resource constraints," Vlerick Leuven Gent Management School Working Paper Series 2006-40, Vlerick Leuven Gent Management School.
- Hartmann, Sönke & Briskorn, Dirk, 2010. "A survey of variants and extensions of the resource-constrained project scheduling problem," European Journal of Operational Research, Elsevier, vol. 207(1), pages 1-14, November.
- M. Vanhoucke, 2006. "An efficient hybrid search algorithm for various optimization problems," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 06/365, Ghent University, Faculty of Economics and Business Administration.
- Hartmann, Sönke & Briskorn, Dirk, 2008. "A survey of variants and extensions of the resource-constrained project scheduling problem," Working Paper Series 02/2008, Hamburg School of Business Administration (HSBA).
- Mika, Marek & Waligora, Grzegorz & Weglarz, Jan, 2005. "Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models," European Journal of Operational Research, Elsevier, vol. 164(3), pages 639-668, August.
- M. Vanhoucke, 2002.
"Optimal Due Date Assignment In Project Scheduling,"
Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium
02/159, Ghent University, Faculty of Economics and Business Administration.
- Mario Vanhoucke, 2002. "Optimal due date assignment in project scheduling," Vlerick Leuven Gent Management School Working Paper Series 2002-19, Vlerick Leuven Gent Management School.
- Chen, Jiaqiong & Askin, Ronald G., 2009. "Project selection, scheduling and resource allocation with time dependent returns," European Journal of Operational Research, Elsevier, vol. 193(1), pages 23-34, February.
- Luis F. Machado-Domínguez & Carlos D. Paternina-Arboleda & Jorge I. Vélez & Agustin Barrios-Sarmiento, 2021. "A memetic algorithm to address the multi-node resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 24(4), pages 413-429, August.
- Tubetov, Dulat & Maart, Syster Christin & Musshoff, Oliver, 2012.
"Comparison of the investment behavior of Kazakhstani and German farmers: An experimental approach,"
2012 Annual Meeting, August 12-14, 2012, Seattle, Washington
124650, Agricultural and Applied Economics Association.
- Tubetov, Dulat & Maart, Syster Christin & Musshoff, Oliver, 2012. "The comparison of investment behaviors of Kazakhstani and German farmers: An experimental approach," 86th Annual Conference, April 16-18, 2012, Warwick University, Coventry, UK 134770, Agricultural Economics Society.
- Tubetov, Dulat & Maart, Syster Christin & Musshoff, Oliver, 2012. "Comparison of the investment behavior of Kazakhstani and German farmers: An experimental approach," 2012 Conference, August 18-24, 2012, Foz do Iguacu, Brazil 125218, International Association of Agricultural Economists.
- Cheung, Grace & Davies, Peter J. & Trück, Stefan, 2016. "Financing alternative energy projects: An examination of challenges and opportunities for local government," Energy Policy, Elsevier, vol. 97(C), pages 354-364.
- Neumann, Klaus & Schwindt, Christoph & Trautmann, Norbert, 2005. "Scheduling of continuous and discontinuous material flows with intermediate storage restrictions," European Journal of Operational Research, Elsevier, vol. 165(2), pages 495-509, September.
- Kai Watermeyer & Jürgen Zimmermann, 2022. "A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(2), pages 575-602, June.
- Kai Watermeyer & Jürgen Zimmermann, 2020. "A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 42(2), pages 427-460, June.
- Domingo A. Tarzia, 2016. "Properties of the financial break-even point in a simple investment project as a function of the discount rate," Papers 1611.03740, arXiv.org.
- Lin, Jun & Qian, Yanjun & Cui, Wentian & Goh, Thong Ngee, 2015. "An effective approach for scheduling coupled activities in development projects," European Journal of Operational Research, Elsevier, vol. 243(1), pages 97-108.
- Yukang He & Tao Jia & Weibo Zheng, 2024. "Simulated annealing for centralised resource-constrained multiproject scheduling to minimise the maximal cash flow gap under different payment patterns," Annals of Operations Research, Springer, vol. 338(1), pages 115-149, July.
- C-C Chang & R-S Chen, 2007. "Project advancement and its applications to multi-air-route quality budget allocation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1008-1020, August.
- Ulrich Dorndorf & Erwin Pesch & Toàn Phan-Huy, 2000. "A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints," Management Science, INFORMS, vol. 46(10), pages 1365-1384, October.
- Tubetov, Dulat & Maart, Syster Christin & Musshoff, Oliver, 2012. "Comparison of the Investment Behavior of German and Kazakhstani Farmers: an Experimental Approach," GlobalFood Discussion Papers 122422, Georg-August-Universitaet Goettingen, GlobalFood, Department of Agricultural Economics and Rural Development.
More about this item
Keywords
Project Management; CPM; work continuity; repetitive project scheduling.;All these keywords.
NEP fields
This paper has been announced in the following NEP Reports:- NEP-BEC-2004-11-22 (Business Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rug:rugwps:04/265. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Nathalie Verhaeghe (email available below). General contact details of provider: https://edirc.repec.org/data/ferugbe.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.