The assessment of infrastructure investments is often affected by inaccuracy in traffic forecasting, optimism bias and overvaluation of expected benefits. In general, even when such misrepresentation is not strategically introduced by proponents to push their projects, valuators and decision makers must cope with the existence of a risk of demand levels below expectations and consequent problem of overinvestment. In this sense, the concept of option value suggests that flexible or reversible projects may have a higher economic net present value compared with rigid schemes characterised by sunk costs. However, conventionally used cost benefit analysis (CBA) is very seldom used to manage such problem due to the complexity of the issue (for example when introducing a complete risk analysis). Moreover, such CBAs are still conceived as a static tool to decide ex-ante about an investment. In this paper we develop a theoretical framework and a practical application of CBA to formally manage such uncertainty and help the decision makers by postponing some decisions to the following running phase. The idea is to assess the project as split into smaller functional sections and bind the construction of a further section to the compliance of a pre-determined “switching rule”. In practical terms, we adapt a normal CBA procedure to manage also the time dimension of time of investments to reallocate risks already in the early design stage of transport infrastructures. The purpose of the paper is twofold. Firstly, we introduce a way to extend conventional CBA methodology to manage the phasing of projects. Secondly, we demonstrate both theoretically (with a simplified model) and practically (with a more complex case study) the positive effect of phasing under certain conditions (limitedness of sunk-costs due to phasing, predominance of capacity problems). By numerically developing the CBA of the Turin – Lyon high speed rail project, we show how to reduce the risk of overestimation of traffic and its positive effect in terms of NPV of the project: if forecasts are optimistic, only the most effective parts of the scheme will be built. If the traffic forecasts are correct, the new infrastructure will be built as a whole in steps and will generate the highest net benefits.

Suggested Citation

  • Debernardi, Andrea & Grimaldi, Raffaele & Beria, Paolo, 2011. "Cost benefit analysis to assess modular investment: the case of the New Turin-Lyon Railway," MPRA Paper 30327, University Library of Munich, Germany.
  • Handle: RePEc:pra:mprapa:30327
    as

    Download full text from publisher

    File URL: https://mpra.ub.uni-muenchen.de/30327/1/MPRA_paper_30327.pdf
    File Function: original version
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Robert McDonald & Daniel Siegel, 1986. "The Value of Waiting to Invest," The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 101(4), pages 707-727.
    2. Short, Jack & Kopp, Andreas, 2005. "Transport infrastructure: Investment and planning. Policy and research aspects," Transport Policy, Elsevier, vol. 12(4), pages 360-367, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Massiani, Jérôme & Maltese, Ila, 2022. "Thirty years of socio-economic evaluation of the Lyon–Turin High–Speed rail project," Research in Transportation Economics, Elsevier, vol. 94(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Oscar Gutiérrez & Francisco Ruiz-Aliseda, 2011. "Real options with unknown-date events," Annals of Finance, Springer, vol. 7(2), pages 171-198, May.
    2. Arve, Malin & Zwart, Gijsbert, 2023. "Optimal procurement and investment in new technologies under uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 147(C).
    3. Helen Weeds, 2002. "Strategic Delay in a Real Options Model of R&D Competition," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 69(3), pages 729-747.
    4. Wong, Kit Pong, 2011. "Progressive taxation and the intensity and timing of investment," Economic Modelling, Elsevier, vol. 28(1-2), pages 100-108, January.
    5. Todd D. Gerarden & Richard G. Newell & Robert N. Stavins, 2017. "Assessing the Energy-Efficiency Gap," Journal of Economic Literature, American Economic Association, vol. 55(4), pages 1486-1525, December.
    6. Estrada, Isabel & de la Fuente, Gabriel & Martín-Cruz, Natalia, 2010. "Technological joint venture formation under the real options approach," Research Policy, Elsevier, vol. 39(9), pages 1185-1197, November.
    7. Tan Wang & Tony S. Wirjanto, 2016. "Risk Aversion, Uncertainty, Unemployment Insurance Benefit and Duration of "Wait" Unemployment," Annals of Economics and Finance, Society for AEF, vol. 17(1), pages 1-34, May.
    8. Goodness C. Aye & Rangan Gupta, 2019. "Macroeconomic Uncertainty And The Comovement In Buying Versus Renting In The Usa," Advances in Decision Sciences, Asia University, Taiwan, vol. 23(3), pages 93-121, September.
    9. LOFGREN Asa & MILLOCK Katrin & NAUGES Céline, 2007. "Using Ex Post Data to Estimate the Hurdle Rate of Abatement Investments - An application to the Swedish Pulp and Paper Industry and Energy Sector," LERNA Working Papers 07.06.227, LERNA, University of Toulouse.
    10. John Driffill & Turalay Kenc & Martin Sola, 2013. "Real Options With Priced Regime-Switching Risk," International Journal of Theoretical and Applied Finance (IJTAF), World Scientific Publishing Co. Pte. Ltd., vol. 16(05), pages 1-30.
    11. Giovanniello, Monica & Perroni, Carlo, 2020. "Climate Change and Pandemics: On the Timing of Interventions to Preserve a Global Common," CAGE Online Working Paper Series 467, Competitive Advantage in the Global Economy (CAGE).
    12. Jackie Krafft & Isabelle Nicolaï, 1995. "Commitment Procedures In R&D Investments : An Examination Of Different Varieties," Post-Print hal-01799270, HAL.
    13. Song, Dandan & Wang, Huamao & Yang, Zhaojun, 2014. "Learning, pricing, timing and hedging of the option to invest for perpetual cash flows with idiosyncratic risk," Journal of Mathematical Economics, Elsevier, vol. 51(C), pages 1-11.
    14. BADALYAN, Gohar & HERZFELD, Thomas & RAJCANIOVA, Miroslava, 2014. "Transport Infrastructure And Economic Growth: Panel Data Approach For Armenia, Georgia And Turkey," Review of Agricultural and Applied Economics (RAAE), Faculty of Economics and Management, Slovak Agricultural University in Nitra, vol. 17(2), pages 1-10, October.
    15. Gabriel J Power & Charli D. Tandja M. & Josée Bastien & Philippe Grégoire, 2015. "Measuring infrastructure investment option value," Journal of Risk Finance, Emerald Group Publishing, vol. 16(1), pages 49-72, January.
    16. Lotfaliei, Babak, 2018. "Zero leverage and the value in waiting to have debt," Journal of Banking & Finance, Elsevier, vol. 97(C), pages 335-349.
    17. Alan Carruth & Andy Dickerson & Andrew Henley, 2000. "What do We Know About Investment Under Uncertainty?," Journal of Economic Surveys, Wiley Blackwell, vol. 14(2), pages 119-154, April.
    18. Wong, Kit Pong, 2008. "Does market demand volatility facilitate collusion?," Economic Modelling, Elsevier, vol. 25(4), pages 696-703, July.
    19. John P. Small & Henry Ergas, 1999. "The Rental Cost of Sunk and Regulated Capital," Econometrics Working Papers 9908, Department of Economics, University of Victoria.
    20. Laetitia Lepetit & Clovis Rugemintwari & Frank Strobel, 2015. "Monetary, Financial and Fiscal Stability in the East African Community: Ready for a Monetary Union?," The World Economy, Wiley Blackwell, vol. 38(8), pages 1179-1204, August.

    More about this item

    Keywords

    cost benefit analysis; option value; optimism bias; strategic misrepresentation; benefit shortfall; planning fallacy; forecasting;
    All these keywords.

    JEL classification:

    • H54 - Public Economics - - National Government Expenditures and Related Policies - - - Infrastructures
    • L92 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Railroads and Other Surface Transportation
    • R42 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - Government and Private Investment Analysis; Road Maintenance; Transportation Planning
    • D61 - Microeconomics - - Welfare Economics - - - Allocative Efficiency; Cost-Benefit Analysis

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pra:mprapa:30327. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joachim Winter (email available below). General contact details of provider: https://edirc.repec.org/data/vfmunde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.