IDEAS home Printed from https://ideas.repec.org/p/hal/wpaper/hal-00875498.html
   My bibliography  Save this paper

Monitoring of the upstream part of a supply chain dedicated to the customized mass production with a revisited version of MRP

Author

Listed:
  • Vincent Giard

    (CRG - Centre de recherche en gestion - X - École polytechnique - IP Paris - Institut Polytechnique de Paris - CNRS - Centre National de la Recherche Scientifique, LAMSADE - Laboratoire d'analyse et modélisation de systèmes pour l'aide à la décision - Université Paris Dauphine-PSL - PSL - Université Paris Sciences et Lettres - CNRS - Centre National de la Recherche Scientifique)

  • Mustapha Sali

    (DRM - Dauphine Recherches en Management - Université Paris Dauphine-PSL - PSL - Université Paris Sciences et Lettres - CNRS - Centre National de la Recherche Scientifique)

Abstract

This article focuses on the monitoring of a supply chain dedicated to the mass production of strongly diversi-fied products. Specifically, we are interested in the part of this chain that contributes to the production of a set of alter-native modules assembled on a work station of one or several assembly lines, whose production levels are stable. The MRP approach is adopted for the monitoring of this chain. The distance between the production units leads to a mix between production to stock and production to order. In this article, we establish the relations that allow us to define, in a steady state, the quantities to produce that address the requirements of the Master Production Schedule and that are partially or completely random to limit the stockout risk to a very low predeterm

Suggested Citation

  • Vincent Giard & Mustapha Sali, 2012. "Monitoring of the upstream part of a supply chain dedicated to the customized mass production with a revisited version of MRP," Working Papers hal-00875498, HAL.
  • Handle: RePEc:hal:wpaper:hal-00875498
    Note: View the original document on HAL open archive server: https://hal.science/hal-00875498
    as

    Download full text from publisher

    File URL: https://hal.science/hal-00875498/document
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Wijngaard, J. & Wortmann, J. C., 1985. "MRP and inventories," European Journal of Operational Research, Elsevier, vol. 20(3), pages 281-293, June.
    2. J. A. Buzacott & J. G. Shanthikumar, 1994. "Safety Stock versus Safety Time in MRP Controlled Production Systems," Management Science, INFORMS, vol. 40(12), pages 1678-1689, December.
    3. Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
    4. Inderfurth, Karl & Minner, Stefan, 1998. "Safety stocks in multi-stage inventory systems under different service measures," European Journal of Operational Research, Elsevier, vol. 106(1), pages 57-73, April.
    5. De Bodt, Marc A. & Van Wassenhove, Luk N. & Gelders, Ludo F., 1982. "Lot sizing and safety stock decisions in an MRP system with demand uncertainty," Engineering Costs and Production Economics, Elsevier, vol. 6(1), pages 67-75, April.
    6. Robert C. Carlson & Candace A. Yano, 1986. "Safety Stocks in MRP---Systems with Emergency Setups for Components," Management Science, INFORMS, vol. 32(4), pages 403-412, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. repec:dau:papers:123456789/9020 is not listed on IDEAS
    2. Vincent Giard & Mustapha Sali, 2012. "Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire," Working Papers hal-00875497, HAL.
    3. repec:dau:papers:123456789/9021 is not listed on IDEAS
    4. Vincent Giard & Mustapha Sali, 2011. "Production à la commande et production pour stock dans un environnement MRP," Working Papers hal-00875557, HAL.
    5. Gansterer, Margaretha & Almeder, Christian & Hartl, Richard F., 2014. "Simulation-based optimization methods for setting production planning parameters," International Journal of Production Economics, Elsevier, vol. 151(C), pages 206-213.
    6. Rafiei, Rezvan & Nourelfath, Mustapha & Gaudreault, Jonathan & De Santa-Eulalia, Luis Antonio & Bouchard, Mathieu, 2015. "Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study," International Journal of Production Economics, Elsevier, vol. 165(C), pages 90-99.
    7. Gonçalves, João N.C. & Sameiro Carvalho, M. & Cortez, Paulo, 2020. "Operations research models and methods for safety stock determination: A review," Operations Research Perspectives, Elsevier, vol. 7(C).
    8. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    9. Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
    10. Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
    11. Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
    12. Boulaksil, Youssef, 2016. "Safety stock placement in supply chains with demand forecast updates," Operations Research Perspectives, Elsevier, vol. 3(C), pages 27-31.
    13. Hong, Zhaofu & Dai, Wei & Luh, Hsing & Yang, Chenchen, 2018. "Optimal configuration of a green product supply chain with guaranteed service time and emission constraints," European Journal of Operational Research, Elsevier, vol. 266(2), pages 663-677.
    14. Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
    15. Riyadh Jamegh & AllaEldin Kassam & Sawsan Sabih, 2019. "Employment of advanced approach to control inventory level by monitoring Safety Stock in Supply Chain under Uncertain environment," Proceedings of International Academic Conferences 8711585, International Institute of Social and Economic Sciences.
    16. Kevin H. Shang & Jing-Sheng Song, 2006. "A Closed-Form Approximation for Serial Inventory Systems and Its Application to System Design," Manufacturing & Service Operations Management, INFORMS, vol. 8(4), pages 394-406, September.
    17. Daria Battini & Nils Boysen & Simon Emde, 2013. "Just-in-Time supermarkets for part supply in the automobile industry," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 209-217, July.
    18. Inderfurth, Karl & Minner, Stefan, 1998. "Safety stocks in multi-stage inventory systems under different service measures," European Journal of Operational Research, Elsevier, vol. 106(1), pages 57-73, April.
    19. Paul Glasserman & Yashan Wang, 1998. "Leadtime-Inventory Trade-Offs in Assemble-to-Order Systems," Operations Research, INFORMS, vol. 46(6), pages 858-871, December.
    20. Jacobs, F. Robert & Bendoly, Elliot, 2003. "Enterprise resource planning: Developments and directions for operations management research," European Journal of Operational Research, Elsevier, vol. 146(2), pages 233-240, April.
    21. van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
    22. Amini, Mehdi & Li, Haitao, 2011. "Supply chain configuration for diffusion of new products: An integrated optimization approach," Omega, Elsevier, vol. 39(3), pages 313-322, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:wpaper:hal-00875498. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.